GAZETTE NOTICE NO. 10371
GAZETTE NOTICE NO. 10371
THE WATER ACT
EXTENSION
Notice is given to the general public that:
Nyahururu Water and Sanitation Company which provides water services.by authority of a license issued by WASREB, has applied to the Water
Services Regulatory Board (WASREB) for a regular tariff review as shown below:
Water Services Provider
(WSP)
County Proposed Action Duration
Nyahururu Water and
Sanitation Company
Laikipia Tariff Review to progressively attain full cost recovery, undertake minor investments and meet conditions to improvement of service delivery
2019/2020 to 2023/2024
Premises where details of the proposed action can be obtained:
www.wasreb.go.ke or NHIF Building, 5th Floor, Wing "A"
The public is invited to visit our website to view a summary of the proposal to review tariffs within the next thirty (30) days and submit any written comments to improve service delivery.
Written comments and objections can be addressed by letter or email to:
Eng. Robert Gakubia, Chief Executive Officer, Water Services Regulatory Board, P.O. Box 41621-00100, Nairobi.
E-mail: tariffs@wasreb.go.ke or info@wasreb.go.ke
The closing date for such comments shall be on 22nd November, 2019.
ANNEX 2
DETAILS OF NYAHURURU WATER AND SANITATION COMPANY
(NYAHUWASCO)
REGULAR TARIFF APPLICATION (2019/20 to 2023/24)
1. Cost and Revenue Structure for the Tariff Period
KSh. KSh.
(a) Cost Subject to Annual Indexation
Operations and Maintenance costs 238,675,902 238,675,902
(b) Fixed Costs
Average Annual Investment Cost 21,714,574
Debt 35,831,845
Sub-total Fixed Costs 57,546,419
Total Average Annual Cost 296,222,322
Projected Average Annual revenue 354,750,447
Average Annual Cost Coverage 120%
2. Recommended Change in Water Tariff Structure for 2019/20 to 2023/24
Customer Category WASREB Recommendations
Domestic/Residential Consumption Block(m3) Recommended Tariff
0-6 55
7-20 83
21-50 95 .
51-100 105
100-300 130
>300 150
Commercial/Industrial Consumption Block(m3) Recommended Tariff
0-50 95
51-100 105
101 - 300 130
>300 150
Government Consumption Block(m3) Recommended Tariff
0-50 95
51-100 105
101 - 300 130
>300 150
Schools/ Colleges/Universities Consumption Block(m3) Recommended Tariff
0-600 60
600<1200m3 85
>1200m3 95
Bulk Water (Per M3) 45
Water Kiosks (Per M3) 35
2.0 Sewerage Tariff
(a) Sewerage is charged at 75% of the water billed for all customers with a sewer connection.
(b) Disconnected water accounts shall be charged based on the average of the last three months' sewer charges before the disconnection.
(c) Customer with no water connection:
Sewerage consumers without a water connection shall be charged as follows:
• Domestic (Per single dwelling unit): KSh. 350 per month
• All other categories: 75% of the volume of water consumed as per the metered source of water
3. Indexation of the Proposed Tariff
(i) The utility shall be eligible for annual indexation of the approved tariff, as per the regulations of the Water Services Regulatory Board
(WASREB).
(ii) The inflation adjustment shall come into effect every July of the tariff period commencing 1st July, 2021.
4. Miscellaneous Charges
1st November, 2019
3.2 These shall be charged as per the approved miscellaneous charges approved by WASREB.
5. Service Delivery Conditions attached to the Tariff
Target 2017118 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24
Water coverage (%) 76 78 80 82 84 86 88
Water quality standards (%) 100% compliance with the quality standards
Non-revenue water 37% 36% 35% 34% 33% 32% 31%
Hours of Supply (Hrs) 22.0 22.5 23.0 235 24.0 ' 24.0 24.0
Staff per 1000 connections 5 5 5 5 5 5 5
Metering ratio (%) 94% 95% 100% 100% 100% 100% 100%
Collection efficiency (%) 95% 95% • 95% 95% 95% 95% 95%
Resale at kiosk Regulate resale by kiosk vendors at KSh. 2 per 20-litres. Tariffs at kiosks must be displayed at strategic points for public awareness
6. Other Conditions
(i) Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
(ii) Surpluses: The surpluses projected to be realised shall only be used on the rehabilitation/ replacement of dilapidated water networks, in order to curb physical losses of water.
(iii) Reporting: The utility shall submit to WASREB a quarterly performance report in the format provided.
(iv) ADB Loan: NYAHUWASCO shall submit equal monthly instalments for-repayment of the AfDB Loan to the Northern Water Works
Development Agency as per the schedule below and report to WASREB on a quarterly basis on the status of this account.
ADB LOAN
Year 2
2020/2021
Year 3
2021/2022
Year 4
2022/2023
Year 5
2023/2024.
Annual repayment rate 34,869,002 34,869,002 34,869,002 34,869,002
Principal 23,277,449 23,629,022 23,985,904 24,348,176
Interest 11,591,552 11,239,980 _ 10,883,098 10,520,825
(iii) Investments: The utility shall undertake the following investments within the tariff period and submit progress reports on a quarterly basis
NYAHURURU WATER AND SANITATION COMPANY INVESTMENTS FROM INTERNALLY GENERATED FUNDS
Unit Quantity
Project Cost
(KSh.)
2019/20 2020/21 2021/22 2022/23 2023/24
Extensions of Water Networks Gikingi
Line, Ngomongo Line and Limunga
Lines
KM 0 5,233,700 5,233,700 0 0 0 0
Extensions of Water Networks—
Agostino, Juakali, Mamboleo and Kwa
Wamae
KM 0.25 5,075,100 0 5,075,100 0 0 0
Extensions of Water Networks—Kanga, Muthaiga, Catholic Secretariat and
Slaughter Hse
KM 1.5 5,092,750 0 0 5,092,750 0 0
Extensions of Water Networks—Maina-
Siberia, Munyu and Canaan-
Mutamaiyo
KM 1 5,185,700
'
0 0 0 5,185,700
Extensions of Water Networks—
Ndagara, Mwanzi, Mihehu and Thiru
KM 2.2 5,094,100 5,094,100
Sub-total 5 25,681,350 5,233,700 5,075,100 5,092,750 5,185,700 5,094,100
Master Meters
Replacement of Production Meters LOT 6 1,430,000 1,430,000 0 0 0
Zonal Metering LOT 32 3,110,000 3,110,000 0 0 0
Sub-total 38 4,540,000 ' - 4,540,000 - - -
Extension of Sewer Networks—UPVC
Sewer Line At Jua Kali, Nyahururu
KM 0.2 1,391,000 0 0 1,391,000 0 0
Extension of Sewer Networks—UPVC
Sewer Line At Muthaiga-Estate, Nyahururu
KM 0.2 1,391,000 0 0 1,391,000 0
Extension of Sewer Networks—UPVC
Sewer Line at Maim Village, Nyahururu
KM 0.2 1,391,000 0 1,391,000 0 0
Extension of Sewer Networks—UPVC
Sewerline Slaughter House, Nyahururu
KM 0.3 1,519,000 1,519,000 0 0 0
Extension of Sewer Networks—UPVC
Sewer Line at Starehe Estate, Nyahururu
KM 0.2 1,391,000 0 1,391,000
Sub-total 1 7,083,000 - 2,910,000 1,391,000 1,391,000 1,391,000
Pro-Poor Initiatives
Pro-poor Initiative—Construction of
Water Kiosks in Gatero, Marmanet and
Rumuruti
NO 5 3,560,472 712,094 712,094 712,094 712,094 712,094
Pro-poor Initiative—Extension of
Distribution Lines in Ngomongo-
KM 0.3 2,685,550 0 0 2,685,550 0 0
Unit Quantity
Project Cost
(KSh.)
2019/20 2020/21 2021/22 2022/23 2023/24
Rumuruti Scheme
Pro-poor Initiative-Extension of
Distribution Lines in Gatero-Maina-
Sibera Nyahururu Scheme
KM 2.5 4,641,850 0 0 0 0 4,641,850
Sub-total 8 10,887,872 712,094 712,094 3,397,644 712,094 5,353,944
Capital Projects
Construction of a parallel intake • SUM 1 5,035,250 5,035,250
Sub -Total 1 5,035,250 5,035,250 - - - -
Consumer Meters
Purchase of Consumer Meters-
Nyahururu
NO 5000 20,000,000 4,000,000 4,000,000 4,000,000 4,000,000 4,000,000
Purchase of Consumer Meters-
Marmanet
NO 2500 10,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2.000,000
Purchase of Consumer Meters-
Rumuruti
NO 1500 6,000,000 1,200,000 1,200,000 1,200,000 1,200,000 1,200,000
Purchase of Consumer Meters-
Igwamiti
NO 1000 4,000,000 800,000 800,000 800,000 800,000 800,000
Sub-total 10,000 40,000,000 8,000,000 8,000,000 8,000,000 8,000,000 8,000,000
Purchase of motor vehicles, tuk tuks and motor cycles
•
Purchase of Single cab pickup, Ford, 3200cc, diesel, 4x4, manual/auto,6 speed
NO 1 3,500,000 0 0 3,500,000 0 0
Purchase of tuk tuk, 400cc, petrol, water cooled, haujin
NO 2 1,000,000 500,000 0 500,000 0 0
Purchase of motor bike NO 10 1,200,000 240,000 360,000 600,000 0 0
Sub-total 13 5,700,000 740,000 360,000 4,600,000 -
Software
Procurement of NYAHUWASCO •
Local Area Network (LAN )
SUM 1 449,600 449,600 0 0 0 0
Procurement of NYAHUWASCO Wide
Area Network (WAN )
SUM 1 1,495,800 0 1,495,800 0 0
Procurement of ERP Modules-Human
Resource
SUM 1 650,000 650,000 0 0 0
Procurement of ERP Modules-Stores SUM 1 450,000 450,000 0 0 0
Procurement of ERP Modules-Registry SUM 1 400,000 400,000 0 0 0 0
Sub-total 5 3,445,400 849,600 1,100,000 1,495,800 - -
Nyahururu Intake Water Pumps:
Hozontal Single Stage-Centrifugal
Pump (Caprali-MEC-AZRBH 2/125B);
Max. Head (H) 82M; Discharge
300M3/Hour
NO 3 1,200,000 400,000 400,000 400,000- -
Small Wheeled Excavator: CAT 303 E
Mini Hydraulic; Engine power -24.8
HP; MAX Reach- 5m, Max depth 3m.
NO 1 5,000,000 5,000,000
Sub-total 4 6,200,000 400,000 400,000 5,400,000 - firand Total 10077.62? 15935.394 27,637,194 22172,194 15.288.794 19,839,044
Dated the 16th October, 2019.
MR/0424840
ROBERT GAKUBIA, Chief Executive Officer.
Dated the 16th October, 2019.
ROBERT GAKUBIA,
Chief Executive Officer.
Extracted Entities (1)
previous_gazette_ref
10371
Details
- Act / Legislation
- THE WATER ACT
- Signed By
- ROBERT GAKUBIA
- Title
- Chief Executive Officer
- Date Signed
- 16th October 2019
- Page
- 69
- Extraction Method
- regex
Source Gazette
Vol. CXXI No. 150
Published 26th February 2019