Back
APPROVAL 100% confidence via regex

GAZETTE NOTICE NO. 12832

GAZETTE NOTICE NO. 12832

THE WATER ACT

(No. 43 of 2016)

APPROVAL


in accordance with the requirements of section 139 of the Water Act, 2016. After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on the latest available data, WASREB has determined an upward tariff review for OWSC is justified to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff. WASREB gives a one (1) months’ notice to all existing and potential customers of OWSC that the approved tariffs for the five financial years 2024/2025, 2025/2026, 2026/2027, 2027/2028 and 2028/2029 shall be as follows: THE KENYA GAZETTE 4th October, 2024 12 Approved Tariff Structure for the period 2024/2025 to 2028/2029 1.1 Water Tariff Consumer Categories Consumption Block Approved Tariff (M3) (KSh./M3) Domestic/Residential 1-6 190 7-20. 210 21-50 220 51-100 230 101-300 240 >300 250 Multi-Dwelling Units Per M3 210 Commercial/Industrial/Government/Institutions 1-50 220 51-100 230 101-300 240 >300 250 Public Schools/Colleges/Universities 1-600 195 601-1200 230 >1200m3 250 Unique Consumer Categories–Water Kiosk Per M3 185 Customers with non-functional meters shall be billed based on the average of the last three months’ bill. 1.2 Sewerage Tariff 1.2.1 Consumers with a Water Connection (a) Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories (b) Disconnected water accounts shall be charged based on the average sewerage charges for the last three months before the disconnection. 1.2.2 Customer with no water connection Sewerage consumers without a water connection shall be charged as follows: • Domestic customers without a metered source of water (Per Single dwelling unit): KSh. 350 Per Month • All other categories: 75% of the volume of water consumed as per the metered source of water including boreholes, at the rates specified in (1.1) above 1.3 Indexation The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services Regulatory Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2025. 1.4 Miscellaneous Charges Item/ Service Charge (KSh.) Water Deposit Category of consumer Domestic 2,500 Retail shops less than 10m3 3,000 Retail shops more than 10m3 3,500 Bar and restaurants less than 15 m3 4,000 Bar and restaurants more than 15 m3 6,000 Hotel class “A” and “B” less than 150 m3 12,000 Hotel class “A” and “B” more than 150 m3 15,000 Hotel class “C” and ‘D’ less than 150 m3 18,000 Hotel class “C” and ‘D’ more than 150 m3 20,000 Multi-Dwelling Units less than 200m3 20,000 Multi-Dwelling Units more than 200m3 30,000 Malls and Supermarkets 25,000 Filling Stations, Garages and Car Wash 25,000 Hospitals and Health centres more than 150 m3 20,000 Hospitals and Health centres less than 150 m3 12,000 Schools and other institutions more than 200 m3 20,000 Schools and other institutions less than 200 m3 10,000 Minor construction sites of more than 200 m3 15,000 Major construction sites more than 300 m3 50,000 Light industries less than 200 m3 30,000 Medium industries between 200 m3 and 300 m3 50,000 Heavy industries of more than 300 m3 100,000 Water Kiosks 5,000 Customers with only sewer connection are to be charged a deposit equivalent to a water connection Other Charges Service New water connection fee – Connection size: ½ inch to 1 inch 2,500 New water connection fee – Connection size: 1.5 inches to 3 inches 7,500 New water connection fee – Connection size above 3inches 15,000 Water Reconnection fee – at meter point 1,000 Water Reconnection fee – at mains 5,000 and double deposit 4th October, 2024 THE KENYA GAZETTE Item/ Service Charge (KSh.) Tanker – 8000 and 16,000 litres 2,500 and 5,000 respectively per tanker within OWSC’s area for all consumers Sale of water Per M3 at bowsing point (own tanker) KSh. 200 Replacement of stolen or damaged meters 100% of the market cost of the meter Meter testing on request 500 Sewer Connection- Residential/ Domestic 5,000 Sewer Connection- Commercial, Government, Schools, Universities and Colleges 7,500 Sewer Connection- Industrial 15,000 Private sewer unblocking 2,500 Leak detection services 1,000 Sewer Reconnection fees 15,000 Statement of account fees 200 For cutting off the supply at the request of the consumer 200 For turning on the supply otherwise than in respect of a first connection 200 Exhauster Services (Company Exhauster) 5,000 for other customers and 4,000 for informal settlements Private Exhausters (Dumping into the company’s sewer system) 15,000 per Truck per month Penalties Illegal water connection, -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of illegality Illegal water connection,– Domestic (Fraud) 30,000 plus estimated consumption during the period of the illegality Overcharging (fraud) at water kiosk 15,000 Illegal sewer connection- Commercial, Industry, Construction 100,000 Illegal sewer connection- Domestic, Government, Schools, Universities & Colleges 30,000 Self-reconnection after cut-off for non-payment 5,000 and billing to be backdated from the date of cut-off Surcharge for tampering with meters (this to include meter removal, reversing of meter etc) 5,000 Surcharge for direct suction of water from the supply line using a pump 10,000 2.0 Cost Summary Below is the summary of the recommended cost structure that makes up the total costs to be incurred by OWSC during the tariff period: Expenditure Item 2022/23 (KSh.) 2023/24 (KSh.) 2024/25 (KSh.) 2025/26 (KSh.) 2026/27 (KSh.) 2027/28 KSh.) 2028/29 (KSh.) Operations 155,521,604 168,386,858 197,687,848 216,264,956 229,703,187 241,300,280 254,379,153 Maintenance 5,589,873 7,221,970 7,221,970 7,583,069 7,962,222 8,360,333 8,778,350 Regulatory Levy 4,769,504 4,843,216 9,597,778 10,201,801 10,665,228 11,347,307 11,859,349 Total O&M Costs 165,880,981 180,452,044 214,507,595 234,049,825 248,330,637 261,007,919 275,016,852 Investment Costs - - 5,740,000 4,140,000 2,984,800 2,784,800 2,534,800 Debt Repayment - - - - - - - Total Costs 165,880,981 180,452,044 220,247,595 238,189,825 251,315,437 263,792,719 277,551,652 Total Billing (KShs) 121,447,406 130,867,342 239,944,439 255,045,029 266,630,699 283,682,671 296,483,732 Collection Efficiency (%) 94% 94% 95% 95% 95% 95% 95% Projected Revenue 114,160,562 123,015,301 227,947,217 242,292,777 253,299,164 269,498,537 281,659,545 Total Cost Coverage 69% 68% 103% 102% 101% 102% 101% 3.0 Conditions attached to the tariff approval The conditions attached to this approval which shall form part of the license conditions of OWSC are: (i) Service Delivery Conditions attached to the Tariff Target 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029 Water Coverage (%) 77% 78% 79% 80% 81% 82% 83% Water quality standards (%) 93% 100% Compliance with Standards Personnel Expenditure as % of O&M 56% 53% 50% 47% 45% 43% 42% Non-Revenue Water 35% 35% 35% 34% 33% 32% 31% Hours of Supply (Hrs.) 16 17 17 18 18 19 19 Staff per 1000 connections 20 16 16 15 15 15 14 Metering ratio (%) 100% 100% 100% 100% 100% 100% 100% Resale at Kiosk KSh. 5.00 per 20l Jerry Can (ii) Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff. (iii) Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by WASREB. (iv) Reporting: The utility shall submit quarterly performance reports to WASREB in the prescribed format. (v) Catchment Protection: The utility shall undertake measures to conserve/protect the catchment areas of their water source as part of Corporate Social Responsibility. (vi) Investments: The utility shall undertake the investments in Table 1 within the tariff period: THE KENYA GAZETTE 4th October, 2024 Table 1: Investments Proposed Investments for OWSC 2024/2025 to 2028/2029 Proposed Activity Metering _New Connections Location/ point of use Item Unit Quantity Unit Price 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029 All zones in the water supply: consumer connections 15mm water meter no 500 3,500 1,750,000 - - - - All zones in the water supply: consumer connections 15mm water meter no 300 3,500 - 1,050,000 - - - All zones in the water supply: consumer connections 15mm water meter no 300 3,500 - - 1,050,000 - - Water Kiosks in the Low-Income Areas 25mm water meter no 4 8,700 - - 34,800 - - All zones in the water supply: consumer connections 15mm water meter no 250 3,000 - - - 750,000 - All zones in the water supply: consumer connections 25mm water meter no 4 8,700 - - - 34,800 - All zones in the water supply: consumer connections 15mm water meter no 150 4,000 - - - - 600,000 All zones in the water supply: consumer connections 25mm water meter no 4 8,700 - - - - 34,800 1,750,000 1,050,000 1,084,800 784,800 634,800 Water Networks Extensions Network extensions of varied diameters 50mm to 63mm Ngong and Matasia water supplies m 1 800,000 800,000 - - - - Bulbul Township - Ngong Water Supply m 500 1,200 - 600,000 - - - Matasia Water Supply m 1000 1,200 - - 600,000 600,000 - Scheme 305 - Ngong Water Supply m 500 1,200 - - - - - 800,000 600,000 600,000 600,000 600,000 Water works, Equipment, Pumps and Motors Construction of bulk Meter Chambers (Masonry type) All zones in the water supply - 5 15,000 75,000 - - - - Pumps and equipment Boreholes within the water supply - 1 1,000,000 1,000,000 - - - - Supply and install inline chlorine dozers Boreholes in Ngong Water Supply LS 2 60,000 - 120,000 - - - Pumps and Motors Boreholes Ngong Water Supply ls 1 1,000,000 - 1,000,000 - - - Pumps and Motors Boreholes within Matasia and Ngong water supplies ls 1 1,000,000 - - 1,000,000 - - Pumps and Motors Boreholes - Ngong water supply ls 1 1,000,000 - - - 1,000,000 - Pumps and Motors Boreholes - Ongata Rongai Water Supply ls 1 1,000,000 - - - - - - - 1,075,000 1,120,000 1,000,000 1,000,000 1,000,000 4th October, 2024 THE KENYA GAZETTE Office Furniture and Equipment Board Room chairs Company Board room no 10 5,000 - 50,000 - - - Small Single pedestal desk Company Head Office no 5 5,000 - 25,000 - - - filling cabinets Company Head Office no 5 15,000 - 75,000 - - - Reception Partitioning Reception/ front office no 1 50,000 - 50,000 - - - Office Chairs Company Head Office no 10 2,000 - 20,000 - - - Laptops Commercial/ Finance Departments no 5 60,000 - 300,000 - - - Conference Table Company Board room no 1 100,000 - 100,000 - - - Sub - Total - - - - 620,000 - - - NRW-Management Interventions 2,115,000 750,000 300,000 400,000 300,000 Total Annual Budgets 5,740,000 4,140,000 2,984,800 2,784,800 2,534,800 Dated the 6th September, 2024. RICHARD K. CHERUIYOT, MR/6547681 Ag. Chief Executive Officer, Water Service Regulatory Board.

Dated the 6th September, 2024.

RICHARD K. CHERUIYOT,

Ag. Chief Executive Officer, Water Service Regulatory Board.

Extracted Entities (1)

previous_gazette_ref

12832

Details

Act / Legislation
THE WATER ACT
Reference
No. 43 of 2016
Section
section 72 (1) (b)
Signed By
RICHARD K. CHERUIYOT
Title
Ag. Chief Executive Officer, Water Service Regulatory Board
Date Signed
6th September 2024
Page
79
Extraction Method
regex