GAZETTE NOTICE NO. 12830
GAZETTE NOTICE NO. 12830
THE WATER ACT
(No. 43 of 2016)
APPROVAL
in accordance with the requirements of section 139 of the Water Act, 2016.
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on the latest available data, WASREB has determined an upward tariff review for TEAWASCO is justified to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB gives a one (1) months’ notice to all existing and potential customers of TEAWASCO that the approved tariffs for the five financial years 2024/2025, 2025/2026, 2026/2027, 2027/2028 and 2028/2029 shall be as follows:
10 Approved Tariff Structure for the period 2024/2025 to 2028/2029
1.1 Water Tariff
Consumer Categories Consumption Block Approved Tariff
(M3) (KSh./M3)
Domestic/Residential 1-6 95
7-20. 100
21-50 105
51-100 110
101-300 120
>300 140
Multi- Dwelling Units Per M3 100
Commercial/Industrial/ 1-50 105
4th October, 2024 THE KENYA GAZETTE
Consumer Categories Consumption Block Approved Tariff
(M3) (KSh./M3)
Government/Institutions 51-100 110
101-300 120
>300 140
Public Schools 1-600 100
601-1200 120
>1200m3 140
Unique Consumer Categories Commercial Plots/Yard Taps -Per M3 105
Water Kiosks -Per M3 110
Customers with non-functional meters shall be billed based on the average of the last three months’ bill.
1.2 Indexation
The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services Regulatory
Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2025.
1.3 Miscellaneous Charges
Item/ Service Charge (KSh.)
Water Deposit
Category of consumer
Domestic 2,500
Retail shops less than 10m3 3,000
Retail shops more than 10m3 3,500
Bar and restaurants less than 15 m3 4,000
Bar and restaurants more than 15 m3 6,000
Hotel class “A” and “B” less than 150 m3 12,000
Hotel class “A” and “B” more than 150 m3 15,000
Hotel class “C” and ‘D’ less than 150 m3 18,000
Hotel class “C” and ‘D’ more than 150 m3 20,000
Hospitals and Health centres more than 150 m3 20,000
Hospitals and Health centres less than 150 m3 12,000
Schools and other institutions more than 200 m3 20,000
Schools and other institutions less than 200 m3 10,000
Minor construction sites of more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industries between 200 m3 and 300 m3 50,000
Heavy industries of more than 300 m3 100,000
Water Kiosks 5,000
Customers with only sewer connection are to be charged a deposit equivalent to a water connection
Other Charges
Service
New water connection fee – Connection size: ½ inch to 1 inch 2,500
New water connection fee – Connection size: 1.5 inches to 3 inches 7,500
New water connection fee – Connection size above 3inches 15,000
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000, and 16,000 litres 2,500 and 5,000 respectively per tanker within TEAWASCO’s area for all consumers
Sale of water Per M3 at bowsing point (own tanker) KSh. 105
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Sewer Connection- Residential/ Domestic 5,000
Sewer Connection- Commercial, Government, Schools, Universities and
Colleges
7,500
Sewer Connection- Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee 15,000
Statement of account fees 200
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
Exhauster Services (Company Exhauster) 5,000 for other customers and 4,000 for informal settlements
Private Exhausters (Dumping into the company’s sewer system) 15,000 per Truck per month
Penalties
Illegal water connection, -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of illegality
Illegal water connection,– Domestic (Fraud) 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection- Commercial, Industry, Construction 100,000
Illegal sewer connection- Domestic, Government, Schools, Universities and
Colleges
30,000
Self-reconnection after cut-off for non-payment 5,000 and billing to be backdated from the date of cut-off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc)
5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
THE KENYA GAZETTE 4th October, 2024
2.0 Cost Summary
Below is the summary of the recommended cost structure that makes up the total costs to be incurred by TEAWASCO during the tariff period:
Expenditure Item 2022/23 (KSh.) 2023/24 (KSh.) 2024/25 (KSh.) 2025/26 (KSh.) 2026/27 (KSh.) 2027/28 (KSh.) 2028/29 (KSh.)
Operations 48,941,344 55,609,531 75,321,021 83,941,612 85,818,705 90,056,307 95,773,117
Maintenance 6,249,116 6,561,572 6,889,650 7,234,133 7,595,840 7,975,632 8,374,413
Regulatory Levy 2,700,396 2,825,652 6,771,984 6,945,426 7,122,172 7,301,756 7,484,182
Total O&M Costs 57,890,856 64,996,755 89,019,440 98,121,171 100,536,717 105,333,695 111,631,712
Investment Costs 10,580,000 13,702,100 45,403,000 50,073,000 54,107,000 53,270,800 58,892,000
Total Costs 68,470,856 78,698,855 134,422,440 148,194,171 154,643,717 158,604,495 170,523,712
Total Billing (KShs) 67,758,820 70,641,294 168,380,014 172,692,562 177,087,365 181,552,699 186,088,716
Collection Efficiency (%) 93% 94% 95% 95% 95% 95% 95%
Projected Revenue 63,015,703 66,402,816 159,961,013 164,057,934 168,232,997 172,475,064 176,784,280
Total Cost Coverage 92% 84% 119% 111% 109% 109% 104%
3.0 Conditions attached to the tariff approval
The conditions attached to this approval which shall form part of the license conditions of TEAWASCO are:
3.1 Service Delivery Conditions attached to the Tariff
Target 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029
Water Coverage (%) 94% 95% 95% 96% 96% 97% 97%
Water quality standards
(%) 95% 100% Compliance with Standards
Personnel Expenditure as
% of O&M 55% 54% 52% 51% 49% 48% 47%
Non-Revenue Water 36% 35% 35% 34% 33% 32% 31%
Hours of Supply (Hrs.) 22 22 23 23 23 24 24
Staff per 1000 connections
6 6 5 5 5 5 5
Metering ratio (%) 100% 100% 100% 100% 100% 100% 100%
Resale at Kiosk KSh. 5.00 per 20l Jerry Can
(ii) Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
(iii) Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by
WASREB.
(iv) Reporting: The utility shall submit quarterly performance reports to WASREB in the prescribed format.
(v) Investments: The utility shall undertake the following investments within the tariff period:
Table 1: Investments
Internally funded Investments during the tariff period
Metering Project
Area
Guide Size Type Unit Unit Cost Qty 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
A. Bulk meters
Aguthi
Tetu and
Titie scheme
Production meter
300mm Class C No 145,000 5 435,000 145,000 145,000
Production meter
250mm Class C No 65,000 5 65,000 65,000 65,000 65,000 65,000
Transmissio n mainlines
200mm Class C No 60,000 5 60,000 60,000 60,000 60,000 60,000
Transmissio n mainlines
150mm Class C No 38,000 10 76,000 76,000 76,000 76,000 76,000
Zonal meters
80mm Class C No 22,000 30 132,000 132,000 132,000 132,000 132,000
Zonal meters
50mm Class C No 18,000 40 144,000 144,000 144,000 144,000 144,000
B.
Customer meter
Aguthi
Tetu and
Titie scheme
New water connections
15mm Class C No 5,000 2,500 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000
Replaceme nt
15mm Class C No 5,000 2,500 5,000,000 2,500,000 2,500,000 2,500,000
D.
Rehabilitati on of
Service
Lines
Tetu
Thegenge
Scheme
160mm Hdpe pipe
Pn 12.5
Kagwat hi
M 2,400 4,262 550,000 1,300,000 2,650,000 2,848,800 2,880,000
50mm Hdpe pipe
Pn 12.5
Gachuir o
M 240 33,458 900,000 1,250,000 2,200,000 1,840,000 1,840,000
110mm Hdpe pipe
Pn 12.5
Nyamba ri
M 950 8,632 850,000 1,300,000 1,950,000 2,000,000 2,100,000
50mm Hdpe pipe
Pn 12.5
Karongo
M 240 24,375 750,000 1,350,000 1,200,000 1,250,000 1,300,000
63mm Hdpe pipe
Pn 12.5
Kinunga
M 390 22,821 800,000 2,250,000 1,900,000 1,950,000 2,000,000
50mm Hdpe pipe
Pn 12.5
Kihatha M 240 62,084 800,000 1,250,000 4,200,000 4,300,000 4,350,000
32mm Hdpe pipe
Pn 12.5
Kiriara M 100 85,060 950,000 1,175,000 2,081,000 2,100,000 2,200,000
4th October, 2024 THE KENYA GAZETTE
Internally funded Investments during the tariff period
Metering Project
Area
Guide Size Type Unit Unit Cost Qty 2024-2025 2025-2026 2026-2027 2027-2028 2028-2029
110mm Hdpe pipe
Pn 12.5
Jolly line
M 950 14,821 955,000 1,925,000 3,950,000 3,750,000 3,500,000
160mm Hdpe pipe
Pn 12.5
Munuga ine
M 2,400 11,542 7,500,000 6,500,000 2,500,000 5,400,000 5,800,000
280mm Hdpe pipe
Pn 12.5
AC
Line
M 6,200 2,476 4,000,000 2,900,000 3,000,000 2,800,000 2,650,000
Titie
Scheme
160mm Hdpe pipe
Pn 12.5
Gathung uya -
Ihari
M 2,400 2,913 800,000 1,250,000 1,700,000 1,560,000 1,680,000
32mm Hdpe pipe
Pn 12.5
Kiangut a -
Gathuthi
M 100 78,900 450,000 1,700,000 1,930,000 1,870,000 1,940,000
Aguthi
Scheme
110mm Hdpe pipe
Pn 12.5
Gititu -
Ithe
Kahuno
M 950 4,263 700,000 1,550,000 1,800,000 1,850,000 1,900,000
90mm Hdpe pipe
Pn 12.5
FT line -
Gathaith i
M 770 4,545 450,000 1,450,000 1,600,000 1,550,000 1,650,000
32mm Hdpe pipe
Pn 12.5
PC line
&
Karathi
M 100 70,500 800,000 1,400,000 1,500,000 1,650,000 1,700,000
90mm Hdpe pipe
Pn 12.5
Ithekahu no-
Karo
M 770 6,624 400,000 1,350,000 850,000 1,150,000 1,350,000
90mm Hdpe pipe
Pn 12.5
Ithekahu no -
Thage- ini
M 770 4,013 400,000 1,850,000 1,000,000 1,050,000 1,100,000
Transport
Single cab pick hardbody 4x4 3.0 Diesel
Engine
No 6,000,000 1 - 6,000,000 - - -
Motor Cycles 200cc
No 200,000 12 600,000 600,000 600,000 300,000 300,000
Billing Software
ERP Upgrading No 5,000,000 1 5,000,000
Water Quality
Procurement of Lab
Equipment for Titie
Treatment plant
Ls 10,293,000 1 700,000 460,000 3,633,000 500,000 5,000,000
Procurement of two lister engines for backwashing
No 1,600,000 2 400,000 800,000 1,000,000 500,000 500,000
NRW Reduction
Activities
To reduce
NRW from
37% to
31%
As per NRW Management
Schedule
8,236,000 7,486,000 7,386,000 7,430,000 7,530,000
Total 45,403,000 50,073,000 54,107,000 53,270,800 58,892,000
Dated the 6th September, 2024.
RICHARD K. CHERUIYOT, MR/6547681 Ag. Chief Executive Officer, Water Service Regulatory Board.
Dated the 6th September, 2024.
RICHARD K. CHERUIYOT,
Ag. Chief Executive Officer, Water Service Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
12830
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1) (b)
- Signed By
- RICHARD K. CHERUIYOT
- Title
- Ag. Chief Executive Officer, Water Service Regulatory Board
- Date Signed
- 6th September 2024
- Page
- 72
- Extraction Method
- regex
Source Gazette
Vol. CXXVI No. 151
Published 9th July 2024