Back
APPROVAL
100% confidence
via regex
GAZETTE NOTICE NO. 12829
GAZETTE NOTICE NO. 12829
THE WATER ACT
(No. 43 of 2016)
APPROVAL
in accordance with the requirements of section 139 of the Water Act, 2016.
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on the latest available data, WASREB has determined an upward tariff review for KIMWASCO is justified to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB gives a one (1) months’ notice to all existing and potential customers of KIMWASCO that the approved tariffs for the three financial years 2024/2025, 2025/2026, and 2026/2027, shall be as follows:
THE KENYA GAZETTE 4th October, 2024
9 Approved Tariff Structure for the period 2024/2025 to 2026/2027
1.1 Water Tariff
Consumer Categories Consumption Block Approved Tariff
(M3) (KSh./M3)
Domestic/Residential
1-6 300
7-20. 310
21-50 315
51-100 345
101-300 395
>300 445
Multi-Dwelling Units Flat Rate 320
Government/Institutions/
Commercial/Industrial
1-50 325
51-100 350
101-300 400
>300 450
Public Schools/ Colleges/Universities
1-600 320
600<1200m3 380
>1200m3 450
Unique Consumer Categories Bowsing Points Per m3 320
Water Kiosks Per m3 250
Customers with non-functional meters shall be billed based on the average of the last three months’ bill.
1.2 Indexation
The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services Regulatory
Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July, 2025.
1.3 Miscellaneous Charges
Item/ Service Charge (KSh.)
Water Deposit
Category of consumer
Domestic 2,500
Retail shops less than 10m3 3,000
Retail shops more than 10m3 3,500
Bar and restaurants less than 15 m3 4,000
Bar and restaurants more than 15 m3 6,000
Hotel class “A” and “B” less than 150 m3 12,000
Hotel class “A” and “B” more than 150 m3 15,000
Hotel class “C” and ‘D’ less than 150 m3 18,000
Hotel class “C” and ‘D’ more than 150 m3 20,000
Hospitals and Health centres more than 150 m3 20,000
Hospitals and Health centres less than 150 m3 12,000
Schools and other institutions more than 200 m3 20,000
Schools and other institutions less than 200 m3 10,000
Minor construction sites of more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industries between 200 m3 and300 m3 50,000
Heavy industries of more than 300 m3 100,000
Water Kiosks 5,000
Customers with only sewer connection to be charged a deposit equivalent to water connection
Other Charges
Service
New water connection fee – Connection size: ½ inch to 1 inch 2,500
New water connection fee – Connection size: 1.5 inches to 3 inches 7,500
New water connection fee – Connection size above 3inches 15,000
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tankers 3,500 and 7,000 respectively per tanker within the WSP area for all consumers
Sale of water Per M3 at bowsing point (own tanker) As per the approved Tariff in (1.1) above
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Sewer Connection- Residential/ Domestic 5,000
Sewer Connection- Commercial, Government, Schools, Universities and Colleges
7,500
Sewer Connection- Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee 15,000
4th October, 2024 THE KENYA GAZETTE
Item/ Service Charge (KSh.)
Statement of account fees 200
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
Exhauster Services (Company Exhauster) 5,000 for other customers and 4,000 for informal settlements
Private Exhausters (Dumping into the company’s sewer system) 15,000 per Truck per month
Penalties
Illegal water connection, -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of illegality
Illegal water connection, (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection- Commercial, Industry, Construction 100,000
Illegal sewer connection- Domestic, Government, Schools, Universities
& Colleges
30,000
Self-reconnection after cut-off for non-payment 5,000 and billing to be backdated from the date of cut-off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc)
5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
2.0 Cost Summary
Below is the summary of the recommended cost structure that
Expenditure Item 202220/23 (KSh.) 2023/2024 (KSh.) 2024/2025 (KSh.) 2025/2026
(KSh.)
2026/2027 (KSh.)
Operations 125,775,158 132,797,832 155,697,634 169,748,625 185,195,167
Maintenance 17,229,978 17,574,578 17,926,069 18,284,590 18,650,282
Regulatory Levy 1,170,247 5,020,915 8,542,053 8,892,830 9,418,388
Operation & Maintenance (O&M) Costs 144,175,383 155,393,324 182,165,756 196,926,046 213,263,838
Minor Investments - - 6,720,000 4,470,000 4,060,000
Debt Repayment - - - - -
Total Costs 144,175,383 155,393,324 188,885,757 201,396,047 217,323,838
Total Billing (KShs) 120,339,149 129,162,869 231,672,821 241,154,040 251,023,751
Collection Efficiency (%) 95% 95% 95% 95% 95%
Projected Revenue 114,451,473 122,704,726 206,431,512 214,881,233 223,686,737
Total Cost Coverage (%) 79% 79% 109% 107% 103%
3.0 Conditions attached to the tariff approval
The conditions attached to this approval which shall form part of the license conditions of KIMWASCO are:
(i) Service Delivery Conditions attached to the Tariff
Target 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027
Water Coverage (%) 71% 72% 72% 73% 73%
Water quality standards (%) 93% 100% Compliance with Standards
Personnel Expenditure as % of O&M 26% 26% 25% 25% 25%
Non-Revenue Water 39% 37% 35% 33% 31%
Hours of Supply (Hrs.) 14 14 15 16 17
Staff per 1000 connections 15 15 14 13 12
Metering ratio (%) 100% 100% 100% 100% 100%
Resale at Kiosk KSh. 5.00 per 20l Jerry Can
(ii) Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
(iii) Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by
WASREB.
(iv) Reporting: The utility shall submit quarterly performance reports to WASREB in the prescribed format.
(v) Creation of distinct water and sewer cost centres: KIMWASCO will ensure it creates separate water and sewer cost centres within the first year of this tariff period. A distinct record of operations of the two centres should be maintained.
(vi) Investments: The utility shall undertake the investments in Table 1 within the tariff period:
Table 1: Investments
Proposed Investment Targeted
Location
Details of
Investment
Specifications Quantities Unit Cost 2024/2025 2025/2026 2026/2027
Procurement, Installation, and commissioning of
Kiambere Treatment plant
Bulk meter
Kiambere
Treatment plant
Ultrasonic or electromagnetic
300mm 1 1,200,000 1,200,000 - -
Procurement and Installation of Thitani Borehole meter
Thitani
Borehole
Electromagnetic 150mm 1 650,000 650,000 - -
Procurement and Installation of Kyuso monitor Meter
(Kyandoo)
Kyuso Electromagnetic 200mm 1 800,000 - 800,000 -
- -
Procurement and Installation of Zonal and Monitor meters
DC Line, Downtown, R100 and above 110 mm 2 125,000 250,000 - -
R100 and above 90 mm 2 95,000 190,000 - -
THE KENYA GAZETTE 4th October, 2024
Garissa, Upper
Nzeluni, Lower
Nzeluni, Kalisasi, Kwa-
Mbungu, Ikuuni, Ndiani, Kambiti, Waita, Kyambaa, Kikunu &
Kanzeru
R100 and above 63mm 6 80,000 480,000 - -
R160 and above 50 mm 4 65,000 260,000 - -
UPC Line, Old Makuti
Line, Slaughter
Line, Waasya, Yambyu, Kimangau, Muuluko &
Hospital line
R100 and above 110 mm 1 125,000 - 125,000 -
R100 and above 90 mm 1 95,000 - 95,000 -
R100 and above 63mm 4 80,000 - 320,000 -
R160 and above 50 mm 2 65,000 - 130,000 -
Ithingili, Katambauku, Kathumulani, Kaliwa, Kyamboo, Kasovi, Thitani &
Migwani.
R100 and above 110 mm 1 125,000 - - 125,000
R100 and above 90 mm 1 95,000 - - 95,000
R100 and above 63mm 4 80,000 - - 320,000
R160 and above 50 mm 2 65,000 - - 130,000
Purchase of office equipment Mwingi All-in-one computers
4 140,000 280,000 - 280,000
Office tables 4 40,000 80,000 - 80,000
Office chairs 4 15,000 30,000 - 30,000
NRW Management
Purchase of support equipment for NRW
Reduction
NRW Related
Equipment
Meter Replacement
- Consumer Meters
Lot 1,500 6,000 3,000,000 3,000,000 3,000,000
Total 6,420,000 4,470,000 4,060,000
Dated the 6th September, 2024.
RICHARD K. CHERUIYOT, MR/6547681 Ag. Chief Executive Officer, Water Service Regulatory Board.
Dated the 6th September, 2024.
RICHARD K. CHERUIYOT,
Ag. Chief Executive Officer, Water Service Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
12829
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1) (b)
- Signed By
- RICHARD K. CHERUIYOT
- Title
- Ag. Chief Executive Officer, Water Service Regulatory Board
- Date Signed
- 6th September 2024
- Page
- 69
- Extraction Method
- regex
Source Gazette
Vol. CXXVI No. 151
Published 9th July 2024