THE WATER ACT
(No. 43 of 2016)
APPROVAL
in accordance with the requirements of section 139 of the Water Act, 2016.
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on the latest available data, WASREB has determined an upward tariff review for OMWASCO is justified to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB gives a one (1) months’ notice to all existing and potential customers of OMWASCO that the approved tariffs for the five financial years 2024/2025, 2025/2026, 2026/2027, 2027/2028 and 2028/2029 shall be as follows:
7 Approved Tariff Structure for the period 2024/2025 to 2028/2029
1.1 Water Tariff
Consumer Categories Consumption Block Approved Tariff
(M3) (KSh./M3)
Domestic/Residential 1-6 90
7-20. 100
21-50 115
51-100 125
101-300 130
>300 140
Mult dwelling Units Flat rate 115
THE KENYA GAZETTE 4th October, 2024
Consumer Categories Consumption Block Approved Tariff
(M3) (KSh./M3)
Commercial/Industrial/Government/Institutions 1-50 100
51-100 110
101-300 120
>300 140
Public Schools 1-600 90
601-1200 110
>1200m3 120
Unique Consumer Categories – Water Kiosk Per M3 50
Customers with non-functional meters shall be billed based on the average of the last three months’ bill.
1.2 Sewerage Tariff
1.2.1 Consumers with a Water Connection
(a) Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories
(b) Disconnected water accounts shall be charged based on the average sewerage charges for the last three months before the disconnection.
1.2.2 Customer with no water connection
Sewerage consumers without a water connection shall be charged as follows:
• Domestic customers without a metered source of water (Per Single dwelling unit): KSh. 350 Per Month
• All other categories: 75% of the volume of water consumed as per the metered source of water including boreholes, at the rates specified in
(1.1) above
1.3 Indexation
The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services
Regulatory Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July, 2025.
1.4 Miscellaneous Charges
Item/ Service Charge (KSh.)
Water Deposit
Category of consumer
Domestic 2,500
Retail shops less than 10m3 3,000
Retail shops more than 10m3 3,500
Bar and restaurants less than 15 m3 4,000
Bar and restaurants more than 15 m3 6,000
Hotel class “A” and “B” less than 150 m3 12,000
Hotel class “A” and “B” more than 150 m3 15,000
Hotel class “C” and ‘D’ less than 150 m3 18000
Hotel class “C” and ‘D’ more than 150 m3 20,000
Hospitals and Health centres more than 150 m3 20,000
Hospitals and Health centres less than 150 m3 12,000
Schools and other institutions more than 200 m3 20,000
Schools and other institutions less than 200 m3 10,000
Minor construction sites of more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industries between 200 m3 and 300 m3 50,000
Heavy industries of more than 300 m3 100,000
Water Kiosks 5,000
Customers with only sewer connection are to be charged a deposit equivalent to a water connection
Other Charges
Service
New water connection fee – Connection size: ½ inch to 1 inch 2,500
New water connection fee – Connection size: 1.5 inches to 3 inches 7,500
New water connection fee – Connection size above 3inches 15,000
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000 and 16,000 litres 2,500 and 5,000 respectively per tanker within the WSP area for all consumers
Sale of water Per M3 at bowsing point (own tanker) Ksh.100
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 1,500
Special meter reading under customer’s request 500
Sewer Connection- Residential/ Domestic 5,000
Sewer Connection- Commercial, Government, Schools, Universities and Colleges 7,500
Sewer Connection- Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee 15,000
4th October, 2024 THE KENYA GAZETTE
Item/ Service Charge (KSh.)
Printing of customer’s statement under own request 200
For cutting off the supply at the request of the consumer 500
For turning on the supply otherwise than in respect of a first connection 200
Exhauster Services (Company Exhauster) 5,000 for other customers and 4,000 for informal settlements within the WSP area for all consumers, Ksh 100 per kilometre for regions outside the service area.
Private Exhausters (Dumping into the company’s sewer system) 15,000 per Truck per month within the WSP area for all consumers
Penalties
Illegal water connection, -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of illegality
Illegal water connection,– Domestic (Fraud) 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection- Commercial, Industry, Construction 100,000
Illegal sewer connection- Domestic, Government, Schools, Universities &
Colleges
30,000
Self-reconnection after cut-off for non-payment 5,000 and billing to be backdated from the date of cut-off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc)
5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
2.0 Cost Summary
Below is the summary of the recommended cost structure that makes up the total costs to be incurred by OMWASCO during the tariff period:
Expenditure Item 2022/23 (KSh.) 2023/24 (KSh.) 2024/25 (KSh.) 2025/26 (KSh. 2026/27 (KSh.) 2027/28 (KSh.) 2028/29 (KSh.)
Operations 157,704,814 165,135,186 188,208,748 199,936,161 208,581,449 220,047,777 234,695,060
Maintenance 33,036,764 33,036,764 33,407,562 35,077,940 36,831,837 38,673,429 40,607,100
Regulatory Levy 7,140,495 9,335,959 18,355,012 18,952,672 19,706,162 20,377,214 20,985,421
Total O&M Costs 197,882,073 207,507,910 239,971,322 253,966,773 265,119,449 279,098,420 296,287,581
Investment Costs - - 126,986,377 92,837,787 75,119,833 63,929,232 62,154,913
Debt Repayment - - 97,354,706 95,418,076 93,481,446 91,544,815 89,608,185
Total Costs 197,882,073 207,507,910 464,312,405 442,222,635 433,720,728 434,572,468 448,050,679
Total Billing (KShs) 197,621,540 229,588,673 469,864,290 484,498,903 505,079,284 523,190,571 544,406,932
Collection Efficiency (%) 84% 95% 95% 95% 95% 95% 95%
Projected Revenue 192,109,684 233,398,985 458,875,296 473,816,797 492,654,060 509,430,358 524,635,514
Total Cost Coverage 100% 111% 101% 110% 116% 120% 122%
3.0 Conditions attached to the tariff approval
The conditions attached to this approval which shall form part of the license conditions of OMWASCO are:
(i) Service Delivery Conditions attached to the Tariff
Service Delivery Conditions
Target 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029
Water Coverage (%) 47% 48% 49% 50% 51% 52%
Water quality standards (%) 100% Compliance with Standards
Personnel Expenditure as % of O&M 43% 40% 40% 40% 40% 39%
Maintenance Expenditure as % of O&M 16% 14% 14% 14% 14% 14%
Investment Expenditure as a % of Total Expenditure - 27% 21% 17% 15% 14%
Non-Revenue Water 35% 34% 32% 29% 29% 26%
Hours of Supply (Hrs.) 23 24 24 24 24 24
Staff per 1000 connections 5 5 5 5 5 4
Metering ratio (%) 95% 96% 97% 98% 99% 100%
Resale at Kiosk KSh. 3.00 per 20l Jerry Can
(ii) Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
(iii) Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by
WASREB.
(iv) Reporting: The utility shall submit quarterly performance reports to WASREB in the prescribed format.
(v) Creation of distinct water and sewer cost centres: OMWASCO will ensure it creates separate water and sewer cost centres within the first year of this tariff period. A distinct record of operations of the two centres should be maintained.
(vi) Metering: OMWASCO shall progressively enhance the metering ratio to attain 100% as per condition (3.1) above.
(vii) Investments: The utility shall undertake the investments in Table 1 within the tariff period:
Table 1: Investments
Description 2024-2025 2025 - 2026 2026- 2027 2027 -2028 2028 -2029
Targetted
Investment
Project
Area
Guide Size Sample
Descriptions
Unit Unit Cost Project Cost
(KSh.)
Project Cost
(KSh.)
Project Cost
(KSh.)
Project Cost
(KSh.)
Project Cost
(KSh.)
A. Metering Othaya
Scheme
Bulk meters
Installation of master meters for all zones in
Othaya
1'',6'',4
''1.5",2
" and
3"
Master meters
SU
M
- 1,353,530 - - - -
THE KENYA GAZETTE 4th October, 2024 scheme
Karima
Mukurwe-ini
Scheme
Bulk
Meters
Installation of master meters for all zones in
Mukurweini scheme-
Karundu
1'',6'',4''1.5",2
" and
3"
Master meters
SU
M
- 5,967,614 - - - -
New
Connectio n Meters
DN15
Water
Meters &
Fittings
1/2 &
1 & 2
DN15
Water
Meters &
Fittings
Nr. 7,666 9,199,200 - - - -
Replacem ent of
Meters
DN15
Water
Meters
1/2 &
1 & 3
DN15
Water
Meters
Nr. 3,950 3,160,000 - - - -
Othaya
Scheme
Bulk
Meters
Installation of master meters for all zones in
Othaya-
Mumwe
0.5", 0.75", 1'',6'',4
''1.5",2
" and
3"
Master meters
Sum - 8,448,411 - - -
New
Connectio n Meters
DN15
Water
Meters &
Fittings
1/2 &
1 & 2
DN15
Water
Meters &
Fittings
Nr. 7,666 - 9,199,200 - - -
Replacem ent of
Meters
DN15
Water
Meters
1/2 &
1 & 3
DN15
Water
Meters
Nr. 3,950 - 3,160,000
Mukurwe- ini
Scheme
Installation of master meters for all zones in
Mukurweini scheme-
Thiha
4'',3'',2
''1.5",1
.",0.75
",0.5" and 6"
Master meters
Sum - - 7,169,814 - -
New
Connectio n Meters
DN15
Water
Meters &
Fittings
1/2 &
1 & 2
DN15
Water
Meters &
Fittings
Nr. 7,666 - - 9,199,200 - -
Replacem ent of
Meters
DN15
Water
Meters
1/2 &
1 & 3
DN15
Water
Meters
Nr. 3,950 - - 3,160,000 - -
Othaya
Scheme
Bulk
Meters
Installation of master meters for all zones in
Othaya
Scheme -
Chinga south
4'',3'',2
''1.5",1
.",0.75
",0.5" and 6"
Master meters
Sum - - - 6,856,492 -
New
Connectio n Meters
DN15
Water
Meters &
Fittings
1/2 &
1 & 2
DN15
Water
Meters &
Fittings
Nr. 7,666 - - - 9,199,200 -
Replacem ent of
Meters
DN15
Water
Meters
1/2 &
1 & 3
DN15
Water
Meters
Nr. 3,950 - - - 3,160,000 -
Othaya
Scheme
Installation of master meters for all zones in
Othaya
Scheme -
Mahiga &
Iriani
4'',3'',2
''1.5",1
.",0.75
",0.5" and 6"
Master meters
Sum - - - - 14,249,323
New
Connectio n Meters
DN15
Water
Meters &
Fittings
1/2 &
1 & 2
DN15
Water
Meters &
Fittings
Nr. 7,666 - - - - 9,199,200
Replacem ent of
Meters
DN15
Water
Meters
1/2 &
1 & 3
DN15
Water
Meters
Nr. 3,950 - - - - 3,160,000
Sub - Total 19,680,344 20,807,611 19,529,014 19,215,692 26,608,523
4th October, 2024 THE KENYA GAZETTE
B.NRW
Management
Procure and install
2no.pressure loggers and integrate them with the billing system
Nr. 100,000 200,000 - - - -
Procure
ArcGIS software
Sum 1,500,000 1,500,000 - - - -
Purchase
2no.portable meter testing kit
Nr. 300,000 300,000 - - - -
Purchase meter testing bench for meter testing
Nr. - - - 300,000 -
Sub - Total 2,000,000 - - 300,000
C. Sewer
Improvement
Rehabilitation of sewer system to improve services, last mile connectivity
-
Replacemen t of sewer rods
DO
Z
200,000 - - - -
-
Rehabilitatio n of sewer system to improve services, last mile connectivity
60M pipeline and facilities
Nr 200,000 2,000,000 - - - -
Rerouting of 300 meters high risk pipeline
-
Rerouting of trunk C sewer system passing within Thuti
River
Sum - 5,543,454 - - -
Rehabilitatio n of sewer system to improve services, last mile connectivity
-
Stone
Pitching -
Hardcore
Sum 350 - - 700,000 - -
Construction of incinerator at Karega
Sewerage plant
-
Proper waste
Managemen t
Sum - - - 285,720 -
Fencing of
Gatugi sewerage ponds
-
Sum - - - - 150,000
Rehabilitatio n of sewer system to improve services, last mile.
Replacemen t of sewer rods
DO
Z
200,000 600,000
Sub - Total 2,600,000 5,543,454 700,000 285,720 150,000
D. Rehabilitation of service lines
Rehabilitatio n of Karima
Service
Lines &
Rehabilitatio n of Othaya
Urban
Service
Lines
90mm
, 63mm
50mm
, 32mm
, and
25mm
(pipe
Karima location
Sum 6,354,830 - - - -
THE KENYA GAZETTE 4th October, 2024
Othaya
Scheme
Rehabilitatio n of Chinga
North
Service
Lines and fittings
Chinga location
Sum 5,635,080 - - - -
Rehabilitatio n of Mahiga
Service
Lines
Mahiga
Location
Sum 1,566,473 - - - -
Othaya
Scheme
Rehabilitatio n of Othaya
Urban
Service
Lines subzones 1 and 2
90mm
, 63mm
50mm
, 32mm and
25mm
(pipe and fittings
Karima location
Sum - 19,000,720 - - -
Mukurwei ni Scheme
Rehabilitatio n of Gikondi
Service
Lines
Subzones 2
& 3
90mm
,63m m50m m,32 mm and
25mm
(pipe and fittings
Gikondi
Sublocation
Sum - 16,057,567 - - -
Othaya
Scheme
Rehabilitatio n of Othaya
Urban
Service
Lines subzones
7,8,9,10
90mm
, 63mm
50mm
, 32mm and
25mm
(pipe and fittings
Karima location
Sum - - 22,319,934 - -
Mukurwei ni Scheme
Rehabilitatio n of
Karundu
Service
Lines (
Ngamwa
Tank Supply
Area)
90mm
,63m m50m m,32 mm and
25mm
(pipe and fittings
Ngamwa
Sublocation
Sum - - 5,064,635 - -
Rehabilitatio n of
Karundu
Service
Lines (
Ngamwa
Tank Supply
Area)
90mm
,63m m50m m,32 mm and
25mm
(pipe and fittings
Ngamwa
Sublocation
Sum - - - 3,650,281 -
Rehabilitatio n of Gikondi
Service
Lines
Subzone 8
90mm
,63m m50m m,32 mm and
25mm
(pipe and fittings
Gikondi
Sublocation
Sum - - - 9,396,003 -
Rehabilitatio n of
Karundu
Service
90mm
,63m m50m m,32
Karundu
Kariara
Sublocations
Sum - - - 3,871,925 -
4th October, 2024 THE KENYA GAZETTE
Lines mm and
25mm
(pipe and fittings
Rehabilitatio n of Thiha
Service
Lines
63mm
50mm
,32m m and
25mm
(pipe and fittings
Kiharo, Ithanji &
Mutundu
Sublocations
Sum - - - 6,376,965 20,834,335
Rehabilitatio n of
Mukurweini
Urbani
Service
Lines
Subzones
5,6,7 & 8
90mm
,63m m50m m,32 mm and
25mm
(pipe and fittings
Mukurweini
Central
Sublocation
Sum - - - - 11,562,055
Rehabilitatio n of Gikondi
Service
Lines
Subzone 4
90mm
,63m m50m m,32 mm and
25mm
(pipe and fittings
Gikondi
Sublocation
Sum - - - -
Sub - Total
13,556,383 35,058,287 27,384,569 23,295,174 32,396,390
E. Capital Works
Constructi on of filters chambers at Chinga
Treatment
Works
To improve water quality in
Mukurweini
Scheme
Filters
Improvemen t of Chinga treatment works
Sum 1,500,000 - - - -
Purchase of turbidimet er
To improve water quality in
Othaya
Scheme
For Kihuri
Treatment
Plant
Laboratory
Sum 300,000 - - - -
Installatio n of Smart meters at treatment works
To compute accurate production
8''DN
Electr omagn etic
Smart meter
Reduction of water losses in company supply area
Sum 800,000 9,600,000 - - - -
Installatio n of direct lines in
Othaya
Urban zone
Installation of direct lines in
Othaya
Urban
Subzones
1,2,3,7,8,9, and 10 mm
,90m m,110 mm and mm
Reduction of water losses and increased billing efficiency in
Othaya
Urban Zone
Sum 74,249,650 - - - -
Chinga
Treatment
Works
Installation of Power backup in
Chinga
Treatment
Facility
To facilitate backwashin g during power outages
Nr. 250,000 500,000 - - - -
Purchase of
Laborator y equipment
To improve water quality at
Othaya &
Mukurweini schemes turbidimeter Nr. 300,000 - 300,000 - - - ph meter Nr. 200,000 - 200,000 - - -
Kihuri
Treatment
Works
Installation of Power back up in
Kihuri
Treatment
Falicity
A hydobox power grid connectiion
Nr. 500,000 - 500,000 - - -
THE KENYA GAZETTE 4th October, 2024
Constructi on of filters chambers at Chinga
Treatment
Works
To improve water quality in
Mukurweini
Filters
Improvemen t of Chinga treatment works
Sum 200,000 - 2,985,150 - - -
Karundu-
Kangurwe
- Gumba
Construction of Karundu
Gumba
Mainline
160m m,110 mm and
90mm
To improve water supply in Karundu
Zone
Sum - 9,443,285 - - -
Njigari
Treatment
Works
Installation of Power back up in
Njigari
Treatment
Falicity
A hydobox power grid connectiion
500,000 - - 500,000 - -
Purchase of
Laborator y equipment for Kaharo
Treatment works
To improve water quality at
Othaya &
Mukurweini schemes turbidimeter
&ph meter
Nr. 500,000 - - 500,000 - -
Gikondi
Zone
Installation of
Kamuchuni
Kaingore
Main Line
160m m, 110m m and
90mm
Improve water supply at Gikondi
Sublocation area
Sum - - - 23,506,250 - -
Gikondi
Zone
Installation of Karindi
Nyakahuho
Mainline
160m m,110 mm and
90mm
Improve water supply at Ngamwa area
Sum - - - - 5,832,646 -
Renewal of fleet
Procure new vehicles -
Toyota
Hilux
Double cab pick up
Procure
Utility vehicles
Nr. 15,000,000 - 15,000,000 - 15,000,000 -
F. Mobility
Improvement
Transport alignment for staff
Purchase of motorcycles
- TVS HLX
UPTO
180C
C
Motorcycles
Nr. 200,000 3,000,000 3,000,000 3,000,000 3,000,000
Sub - Total 89,149,650 31,428,435 27,506,250 20,832,646 3,000,000
Total 126,986,377 92,837,787 75,119,833 63,929,232 62,154,913
Dated the 6th September, 2024.
RICHARD K. CHERUIYOT, MR/6547681 Ag. Chief Executive Officer, Water Service Regulatory Board.
Dated the 6th September, 2024.
RICHARD K. CHERUIYOT,
Ag. Chief Executive Officer, Water Service Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
12827
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1) (b)
- Signed By
- RICHARD K. CHERUIYOT
- Title
- Ag. Chief Executive Officer, Water Service Regulatory Board
- Date Signed
- 6th September 2024
- Page
- 59
- Extraction Method
- regex
Source Gazette
Vol. CXXVI No. 151
Published 9th July 2024