Back
ESTABLISHMENT 100% confidence via regex

GAZETTE NOTICE NO. 12069

GAZETTE NOTICE NO. 12069

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

ESTABLISHMENT


PURSUANT to section 59 of the Environmental Management and Co-ordination (Impact Assessment and Audit) Regulations, 2003, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above- proposed project. The proponent, Coast Water Works Development Agency proposes to construction of feacal sludge management facility, which will comprise the following components for treatment process, pre- treatment units, solid/liquid separation unit, liquid fraction treatment units, solid fraction dewatering units, ancillary units, associated amenities and facilities in Ng’ombeni Waa Ward, Ng’ombeni Location, Matuga Sub-County, Kwale County. The following are the anticipated impacts and proposed mitigation measures: Environmental Impacts Mitigation Measures Water pollution • Institution of spill prevention and control measures. • Conservative use of water in construction works. • Implement a construction waste management plan; Implement soil erosion control measures. • Install and regularly empty sediment traps in surface drains around construction areas. Dust and air pollution • Proper equipment and vehicle maintenance. • Use of low sulphur fuels. • Regulation of construction vehicle speeds. • Sprinkling of dusty accesses and other dust prone areas to lay dust. • Provision of PPEs dust masks to workers. • Minimize the period for machinery idling. • Rehabilitation of disturbed areas once completed. Noise pollution • Use of noise abatement equipment for machinery. 20th September, 2024 THE KENYA GAZETTE Environmental Impacts Mitigation Measures • Limit construction activities to daytime only. • Switch off noisy equipment when not in use. • Provide PPE such as earmuffs to workers at the site. • Locate noisy equipment away from receptors. • Sensitize drivers/ operators against hooting. Biodiversity disruption • Development of a Reinstatement Plan and a landscaping/ revegetation plan. • Ensure minimal stripping of vegetation at work areas; Establishment of sediment traps and silt fences; Institution of containment measures for hazardous substances. • Institution of a waste management plan; only clear vegetation necessary for the construction activities. • Ensure that all personnel are informed and aware of the importance to protect fauna and flora. • Reinstatement of disturbed site. • Avoid removal of mature trees that has visual focal points. • Replacement of removed trees where possible; Proper housekeeping at construction site to reduce visual nuisance. Soil pollution • Avoid offsite disposal of spoil. • Salvage, stockpile and ensure re-use of native topsoil Implementation of a site- specific reinstatement plan. • Institution of spill prevention and control measures. • Hazardous materials to be stored as per MSDS’s; Stabilize and maintain access roads created to access project sites. • Stabilize construction site and camp(s) entrances/exits. Increased energy use • Minimize idling of machinery. • Avoid overloading of trucks and machinery. • Regular service of vehicles, plant, and machinery; Use environmentally friendly fuels such as low sulphur diesel. • Specify and procure the most energy efficient plant options fit for purpose and avoid use of plant with unnecessary and excess capacity. Solid waste generation • Modification of construction activities and methods to reduce potential adverse impacts. • Segregate wastes into inert fill materials, recyclable/ reusable materials and hazardous wastes for appropriate disposal. • Compost organic waste. • Provide sanitary facilities at construction camps and sites. Environmental Impacts Mitigation Measures • Adopt best practices in concrete waste management. • Isolate woody vegetation cleared and facilitated collection by neighboring residents. Occupational health and safety • Implement a health and safety management plan, Designate a health and safety officer. • Comply with the OSHA, 2007 and all other relevant regulations governing health and safety. • Restrict access to construction sites. • Provide appropriate signage and warnings in work areas. • Provide First Aid kits/boxes. • Provide adequate sanitary facilities. • Fire extinguishers should be provided and placed in areas that have potential fire threat. • Set of clear plans for workers to avoid overworking them. • Enforce and monitor road safety through traffic management at work sites and routes. • Ensure all dangerous construction sites are fenced off. • Implement a community safety management plan. The full report of the proposed project is available for inspection during working hours at: (d) Principal Secretary, Ministry of Environment and Forestry, NHIF Building, 12th Floor, Ragati Road, Upper Hill, P.O. Box 30126–00100, Nairobi. (e) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (f) County Director of Environment, Kwale County. A copy of the report can be downloaded at www.nema.go.ke The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the decision making process regarding this project. Comments can also be emailed to dgnema@nema.go.ke MAMO B. MAMO, Director-General, MR/6547824 National Environment Management.

Dated the 20th September, 2024.

MAMO B. MAMO,

Director-General, National Environment Management.

Extracted Entities (1)

previous_gazette_ref

12069

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Section
section 59
Signed By
MAMO B. MAMO
Title
Director-General, National Environment Management
Date Signed
20th September 2024
Page
78
Extraction Method
regex