Back
APPROVAL
100% confidence
via regex
GAZETTE NOTICE NO. 5970
GAZETTE NOTICE NO. 5970
THE WATER ACT
(No. 43 of 2016)
APPROVAL
in accordance with the requirements of section 139 of the Water Act, 2016.
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on latest available data, WASREB has determined an upward tariff review for Gatamathi Water and Sanitation Company Limited is justified in order to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions.
WASREB gives a one (1) months’ notice to all existing and potential customers of Gatamathi Water and Sanitation Company Limited that the approved tariffs for the three Financial Years 2024/25, 2025/26, 2026/27 and 2027/28 shall be as follows:
2.0 Approved Tariff Structure
1.1 Water Tariff Structure for the period 2024/2025 to 2027/2028
Consumer Categories Consumption Block Approved Tariff
(m3) (KSh./m3)
Domestic/Residential
1-6 60
7-20. 70
21-50 80
51-100 90
101-300 110
>300 130
Multi-Dwelling Units Flat Rate/M3 70
Commercial/Industrial 1-50 70
51-100 90
101-300 110
>300 130
Government 1-50 70
51-100 90
100-300 110
>300 130
Public Schools, Colleges and Universities
1-600 65
601-1200 75
>1200m3 90
Water Kiosks Per M3 35
Customers with non-functional meters shall be billed based on the average of the last three months’ bills.
1.2 Indexation
The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services
Regulatory Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2025.
1.3 Miscellaneous Charges
These shall be as follows:
Item/ Service Charge (KSh.)
Water Deposit
Category of consumer
Domestic 2,500
Multi Dwelling Units (MDU - Small); 4-10 units 5,000
Multi Dwelling Units (MDU - Medium); 11-20 units 10,000
Multi Dwelling Units (MDU - Large); > 21 units 20,000
Retail shops less than 10m3 3,000
Retail shops more than 10m3 3,500
Bar, restaurants less than 15 m3 4,000
Bar, restaurants more than 15 m3 6,000
Hotel less than 150 m3 12,000
Hotel more than 150 m3 15,000
Hospitals more than 150 m3 20,000
Health centres less than 150 m3 12,000
Schools less than 200 m3 10,000
Schools and other institutions more than 200 m3 20,000
Minor construction sites more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industrial between 200 m3 and 300 m3 50,000
Heavy industries more than 300 m3 100,000
Water Kiosks 5,000
*Customers with only sewer connection to be charged a deposit equivalent to water connection
Other Charges
Service
New water connection fee 2,500
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000, 16,000 litres 2,500, 5,000 respectively per tanker within WSP Service Area for all consumers
Sale of water Per M3 at bowsing point (own tanker) 70
Replacement of stolen or damaged meters 100% of the market cost of the meter
THE KENYA GAZETTE 17th May, 2024
Item/ Service Charge (KSh.)
Meter testing on request 500
Sewer Connection- Residential/ Domestic 2,500
Sewer Connection- Commercial, Government, schools, Universities and
Colleges
5,000
Sewer Connection- Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee (At mains) 15,000
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
Exhauster Services (Company Exhauster) 5,000 for other customers and 4,000 for informal settlements
Private Exhausters (Dumping into the company’s sewer system) 15,000 per Truck per month
Penalties
Illegal water connection, -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of the illegality
Illegal water connection, (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection- Commercial, Industry, Construction 100,000
Illegal sewer connection- Domestic, Government, Schools, Universities and
Colleges
30,000
Self-reconnection after cut off for non-payment 5,000 and billing to be backdated from date of cut off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc)
5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
2.0 Analysis of Cost Structure
Below is the summary of the projected Annual cost structure that makes up the total costs to be incurred by Gatamathi Water and Sanitation
Company Limited during the tariff period:
Expenditure Item 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28
Operations 49,799,007 49,500,822 59,839,607 66,777,188 70,508,147 74,448,695
Maintenance 13,373,393 14,042,063 11,114,129 9,022,849 8,300,925 9,615,496
Regulatory Levy 2,487,067 2,861,945 3,563,704 4,093,226 4,502,548 4,952,803
Total O&M Costs 65,659,467 66,404,830 74,517,440 79,893,263 83,311,620 89,016,994
Investment Costs - - 6,100,000 21,301,603 24,609,942 25,804,008
Asset Renewal - - - 2,714,874 4,098,361 3,485,899
Total Costs 65,659,467 66,404,830 80,617,440 103,909,740 112,019,923 118,306,901
Total Billing (KShs) 46,111,509 64,468,104 100,048,743 119,119,672 131,901,282 144,710,576
Collection Efficiency (%) 95% 95% 85% 90% 90% 90%
Projected Revenue 43,805,933 61,244,699 85,041,432 107,207,705 118,711,153 130,239,519
Total Cost Coverage 67% 92% 105% 103% 106% 110%
3.0 Conditions attached to the tariff approval.
The conditions attached to this approval which shall form part of the license conditions of Gatamathi Water and Sanitation Company Limited are:
(viii) Service Delivery Conditions attached to the Tariff
Target 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Water Coverage (%) 58% 58% 59% 60% 61% 62%
Water quality standards (%) 99% 100% Compliance with Standards
Personnel Expenditure as % of O&M 47% 49% 46% 45% 45% 44%
Non-Revenue Water 59% 59% 54% 49% 45% 41%
Hours of Supply (Hrs.) 23 23 24 24 24 24
Staff per 1000 connections 6 6 6 6 5 5
Maintenance Expenditure as % of O&M 20% 21% 15% 11% 10% 11%
Metering ratio (%) 60% 60% 65% 75% 85% 100%
Collection Efficiency (%) 95% 95% 85% 90% 90% 90%
Resale at Kiosk KSh. 2.00 per 20l Jerry Can
(ix) Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
(x) Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by
WASREB
(xi) Reporting: The utility shall submit to WASREB a quarterly performance report in the format provided
(xii) Ring-Fencing of Capital Expenditure: The WSP to open a separate account for capital component of the tariff, to deposit the appropriate share of revenue into this account which is only to be used for capital expenditure and repayment of loans as provided for in the approved tariff
17th May, 2024 THE KENYA GAZETTE
(xiii) Catchment Protection: The utility shall undertake measures to conserve/ protect the catchment areas of their water source as part of Corporate
Social Responsibility
(xiv) Investments: The utility shall undertake the investments in Annex 1:
Annex 1: Investments
Proposed Investments by Gatamathi WSP Amount (KSh.)
2024/2025 2025/2026 2026/2027 2027/2028
Non-Revenue Water
Management
Flat Rate Connections _ (Targeted 4,236 Connections) 2,500,000 10,000,000 8,681,050 -
Meter Replacements _ (Targeted 2,000 Connections) - 2,500,000 2,500,000 2,500,000
Procurement of 8" master meters and fittings.
Installation in Constructed 4No. Chambers 1M*1M
1,200,000 - - -
Procurement of ultrasonic flow meter and potable meter testing bench
- - 1,050,000 1,050,000
Procurement of 1" Pressure Control Valves and the
Fittings, Installation of the same in constructed chambers of 500mm*500mm
750,000 750,000 750,000 750,000
Procure mobile smart phones 100,000 - - -
Increased Access in WSP
Area of Supply
New Connections _ (Targeted 1,770 Connections) 1,250,000 2,550,000 2,900,000 3,400,000
Line Extensions - Kiambugi & Mukurwe wa
Nyagathanga
5,201,603 8,428,892 13,004,008
Procurement of Movable
Assets
Procurement of 125cc 20No. Motorcycles for patrol 300,000 300,000 300,000 600,000
Procure 1No. Double CAB motor vehicle for NRW
Unit
- - - 4,500,000
Total Investments 6,100,000 21,301,603 24,609,942 25,804,008
Water Networks
Rehabilitation Gatango Water Supply
Kamagoko-Kora Main - Line 2,714,874 2,766,824
Kairo School Line, Gikindu line, Wangethi Line, Ndugu Line, Wamikurwe Line, Gicharuri, Pilot,Gati
Iguru
2,154,362
Mathioya Water Supply 1,331,537 1,331,537
Total Network Rehabilitation - 2,714,874 4,098,361 3,485,899
Dated the 2nd May, 2024.
JULIUS ITUNGA, MR/5723150 Ag. Chief Executive Officer, Water Services Regulatory Board.
Dated the 2nd May, 2024.
JULIUS ITUNGA,
Ag. Chief Executive Officer, Water Services Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
5970
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1) (b)
- Signed By
- JULIUS ITUNGA
- Title
- Ag. Chief Executive Officer, Water Services Regulatory Board
- Date Signed
- 2nd May 2024
- Page
- 54
- Extraction Method
- regex
Source Gazette
Vol. CXXVI No. 66
Published 24th January 2024