GAZETTE NOTICE NO. 5965
GAZETTE NOTICE NO. 5965
THE WATER ACT
(No. 43 of 2016)
APPROVAL
in accordance with the requirements of section 139 of the Water Act, 2016.
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on the latest available data, WASREB has determined an upward tariff review for NIWASCO is justified to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB gives a one (1) months’ notice to all existing and potential customers of NIWASCO that the approved tariffs for the four Financial
Years 2024/2025, 2025/2026,2026/2027 and 2027/28 shall be as follows:
1.0 Approved Tariff Structure
1.1 Water Tariff Structure for the period 2024/2025 to 2027/2028
Consumer Categories Consumption Block Approved Tariff
(m3) (KSh./m3)
Domestic/Residential 1-6 100
7-20. 120
21-50 125
51-100 130
101-300 135
>300 140
Multi-Dwelling Units Per m3 120
Commercial/Industrial 1-50 125
51-100 130
101-300 135
>300 140
Government/Institutions 1-50 125
51-100 130
100-300 135
>300 140
Public Schools 1-600 120
601-1200 135
>1200m3 140
Unique Consumer Categories Water Kiosks (Per m3) 70
Bulk Water Supply (Per m3) 120
Customers with non-functional meters shall be billed based on the average of the last three months’ bill.
1.2 Sewerage Tariff for the period 2024/2025 to 2027/2028
1.2.1 Consumers with a Water Connection
(a) Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories
(b) Disconnected water accounts shall be charged based on the average of the last three months’ sewerage charges before the disconnection.
1.2.2 Customer with no water connection
Sewerage consumers without a water connection shall be charged as follows:
• Domestic customers without a metered source of water (Per Single dwelling unit): KSh. 350 Per Month
• All other categories: 75% of the volume of water consumed as per the metered source of water including boreholes, at the rates specified in (1.1) above.
1.3 Indexation
The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services
Regulatory Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2025.
disbursement, Pro-poor, Laboratory, and GIS Datalink.
Human Resource empowerment
HR Module and Maji app No 1 2,000,000 2,000,000
Grand Total 12,395,020
17th May, 2024 THE KENYA GAZETTE
1.4 Miscellaneous Charges
Item/ Service Charge (KSh.)
Water Deposit
Category of consumer
Domestic 2500
Retail shops less than 10m3 3000
Retail shops more than 10m3 3,500
Bar, and restaurants less than 15 m3 4000
Bar, restaurants more than 15 m3 6,000
Hotel class “A” and “B” less than 150 m3 12,000
Hotel class “A” and “B” more than 150 m3 15000
Hotel class “C” and ‘D’ less than 150 m3 18000
Hotel class “C” and ‘D’ more than 150 m3 20,000
Hospitals more than 150 m3 20,000
Health centres less than 150 m3 12,000
Schools and other institutions more than 200 m3 20,000
Schools less than 200 m3 10,000
Minor construction sites of more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industrial between 200 m3 and 300 m3 50,000
Heavy industries of more than 300 m3 100,000
Water Kiosks 5,000
Customers with only sewer connection are to be charged a deposit equivalent to a water connection
Other Charges
Service
New water connection fee – Connection size: ½ inch to 1 inch
2,500
New water connection fee – Connection size: 1.5 inches to 3 inches
7,500
New water connection fee – Connection size above
3inches
15,000
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000, 16,000 litres 3,500, 7,000 respectively per tanker within the WSP area for all consumers
Sale of water Per M3 at bowsing point (own tanker) KSh .120
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Sewer Connection- Residential/ Domestic 5,000
Sewer Connection- Commercial, Government, Schools, Universities and Colleges
7,500
Sewer Connection- Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee 15,000
Statement of account fees 200
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection
Exhauster Services (Company Exhauster) KSh.7,500 with Chuka and Chogoria Schemes. To charge an additional KSh.1,500 for every 10km covered beyond the specified areas.
Private Exhausters (Dumping into the company’s sewer system)
15,000 per Truck per month
Penalties
Illegal water connection, -Commercial, Industry, Construction (Fraud)
100,000 plus estimated consumption during the period of illegality
Illegal water connection, (Fraud) – Domestic 50,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection- Commercial, Industry, Construction
100,000
Illegal sewer connection- Domestic, Government, Schools, Universities and Colleges
30,000
Self-reconnection after cut-off for non-payment 5,000 and billing to be backdated from the date of cut-off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc)
10,000
Surcharge for direct suction of water from the supply line using a pump
10,000
2.0 Cost Structure
2.1 Cost Summary
Below is the summary of the recommended cost structure that makes up the total costs to be incurred by NIWASCO during the tariff period:
Expenditure Item 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Operations 69,296,790 81,541,335 96,177,877 100,328,156 104,088,801 105,411,025
Maintenance 19,500,282 19,500,282 21,499,061 22,574,014 23,702,715 24,887,850
THE KENYA GAZETTE 17th May, 2024
Regulatory Levy 3,122,925 3,016,776 6,835,706 7,156,140 7,775,700 7,775,702
Total O and M Costs 91,919,997 104,058,393 124,512,644 130,058,310 135,567,215 138,074,577
Investment Costs - - 33,056,989 36,807,819 37,931,525 40,683,109
Total Costs 91,919,997 104,058,393 157,569,633 166,866,129 173,498,740 178,757,686
Total Billing (KSh.) 80,193,872 81,894,694 170,892,651 178,903,507 183,444,965 188,082,498
Collection Efficiency (%) 93% 93% 95% 95% 95% 95%
Projected Revenue 74,838,748 76,162,065 162,348,018 169,958,331 174,272,717 178,678,373
Total Cost Coverage 81% 73% 103% 102% 100% 100%
3.0 Conditions attached to the tariff approval
The conditions attached to this approval which shall form part of the license conditions of NIWASCO are:
(i) Service Delivery Conditions attached to the Tariff
Target 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Water Coverage (%) 49% 51% 53% 55% 57% 59%
Water quality standards (%) 100% Compliance with Standards
Personnel Expenditure as % of O&M 38% 37% 35% 35% 35% 34%
Non-Revenue Water 65% 63% 62% 61% 60% 59%
Hours of Supply (Hrs.) 16 16 17 17 18 18
Staff per 1000 connections 6 5 5 5 5 5
Maintenance Expenditure as % of
O&M
21% 19% 17% 17% 17% 18%
Metering ratio (%) 92% 92% 100% 100% 100% 100%
Collection Efficiency (%) 93% 93% 95% 95% 95% 95%
Resale at Kiosk KSh. 5.00 per 20l Jerry Can
(ii) Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
(iii) Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by
WASREB.
(iv) Reporting: The utility shall submit quarterly performance reports to WASREB in the prescribed format.
(v) Creation of distinct water and sewer cost centres: NIWASCO will ensure it creates separate water and sewer cost centres and maintains distinct record of operations of the two centres.
(vi) Metering: NIWASCO shall progressively enhance the metering ratio to attain 100% as per condition (3.1) above.
(vii) Catchment Protection: The utility shall undertake measures to conserve/ protect the catchment areas of their water source as part of Corporate
Social Responsibility
(viii) Investments: The utility shall undertake the investments in Annex 1: Annex 1: Investments
PROPOSED INVESTMENTS
Metering:
Consumer
Meters
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027-
New
Connections
Chuka-
Karingani
Scheme
Dn
25mm
70 6,000.00 420,000.00 42,000 126,000 126,000 126,00
0.00
Dn
20mm
105 4,500.00 472,500.00 47,250 141,750 141,750 141,75
0.00
Dn
15mm
2,072 4,000.00 8,288,000.
828,800 2,486,400 2,486,400 2,486,4
00.00
Chogoria
Scheme
Dn
25mm
42 6,000.00 252,000.00 25,200 75,600 75,600 75,600.
Dn
20mm
70 4,500.00 315,000.00 31,500 94,500 94,500 94,500.
Dn
15mm
560 4,000.00 2,240,000.
224,000 672,000 672,000 672,00
0.00
Mutonga-
Gituma
Scheme
Dn
25mm
42 6,000.00 252,000.00 25,200 75,600 75,600 75,600.
Dn
20mm
35 4,500.00 157,500.00 15,750 47,250 47,250 47,250.
Dn
15mm
280 4,000.00 1,120,000.
112,000 336,000 336,000 336,00
0.00
Kibung'a
Kakimiki
Dn
25mm
35 6,000.00 210,000.00 21,000 63,000 63,000 63,000.
Dn
20mm
42 4,500.00 189,000.00 18,900 56,700 56,700 56,700.
Dn
15mm
560 4,000.00 2,240,000.
224,000 672,000 672,000 672,00
0.00
Kathwana
Scheme
Dn
25mm
35 6,000.00 210,000.00 21,000 63,000 63,000 63,000.
Dn
20mm
42 4,500.00 189,000.00 18,900 56,700 56,700 56,700.
17th May, 2024 THE KENYA GAZETTE
PROPOSED INVESTMENTS
Metering:
Consumer
Meters
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027-
Dn
15mm
560 4,000.00 2,240,000.
224,000 672,000 672,000 672,00
0.00
Sub-Total 18,795,000
.00
1,879,500.
5,638,500.00 5,638,500.
5,638,5
00.00
Metering:
Consumer
Meters
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027-
Replacement Chuka-
Karingani
Scheme
Dn
25mm
30 6,000.00 180,000.00 18,000 54,000 54,000 54,000.
Dn
20mm
45 4,500.00 202,500.00 20,250 60,750 60,750 60,750.
Dn
15mm
888 4,000.00 3,552,000.
355,200 1,065,600 1,065,600 1,065,6
00.00
Chogoria
Scheme
Dn
25mm
18 6,000.00 108,000.00 10,800 32,400 32,400 32,400.
Dn
20mm
30 4,500.00 135,000.00 13,500 40,500 40,500 40,500.
Dn
15mm
240 4,000.00 960,000.00 96,000 288,000 288,000 288,00
0.00
Mutonga-
Gituma
Scheme
Dn
25mm
18 6,000.00 108,000.00 10,800 32,400 32,400 32,400.
Dn
20mm
15 4,500.00 67,500.00 6,750 20,250 20,250 20,250.
Dn
15mm
120 4,000.00 480,000.00 48,000 144,000 144,000 144,00
0.00
Kibung'a
Kakimiki
Dn
25mm
15 6,000.00 90,000.00 9,000 27,000 27,000 27,000.
Dn
20mm
18 4,500.00 81,000.00 8,100 24,300 24,300 24,300.
Dn
15mm
240 4,000.00 960,000.00 96,000 288,000 288,000 288,00
0.00
Kathwana
Scheme
Dn
25mm
15 6,000.00 90,000.00 9,000 27,000 27,000 27,000.
Dn
20mm
18 4,500.00 81,000.00 8,100 24,300 24,300 24,300.
Dn
15mm
240 4,000.00 960,000.00 96,000 288,000 288,000 288,00
0.00
Sub-Total 8,055,000.
805,500.00 2,416,500.00 2,416,500.
2,416,5
00.00
Rehabilitations Area Pipe Size Dista nce
(Km)
Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027-
Chuka-
Karingani
Scheme
Dn110/9
0mm
1.8 1,920,045.
3,456,081.
1,382,432.
1,036,824.3 1,036,824.
Chogoria
Scheme
Dn
160mm
1 2,087,500.
2,087,500.
835,000.0 626,250.0 626,250.0
Dn110m m
1.2 2,203,684.
2,644,420.
1,057,768.
793,326.2 793,326.2
Dn
90mm
0.5 1,659,685.
829,842.50 331,937.0 248,952.8 248,952.8
Mutonga -
Gituma
Scheme
Dn
160mm
1.2 4,295,813.
5,154,975.
2,061,990.
1,546,492.7 1,546,492.
Kibung'a
Kakimiki
Scheme
- - - -
Dn
200mm
0.8 5,691,407.
4,553,125.
1,821,250.
1,365,937.7 1,365,937.
Kathwana
Scheme
Dn
200/160 mm
0.8 6,483,588.
5,186,870.
2,074,748.
1,556,061.1 1,556,061.
Dn110 mm
0.8 2,170,941.
1,736,752.
694,701.1 521,025.8 521,025.8
Sub-Total 25,649,568
.70
10,259,827
.48
7,694,870.61 7,694,870.
-
Pipeline
Extensions
Scheme Pipe Size Dista nce
Unit
Cost/Km
Estimated
Cost
2024-25 2025-26 2026-27 2027-
PROPOSED INVESTMENTS
Metering:
Consumer
Meters
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027-
(Km)
Chuka -
Karingani
Dn110m m -
50mm
8 1,227,422.
9,819,376.
981,938 2,945,813 2,945,813 2,945,8
Chogoria
Scheme
Dn
110mm-
50mm
8 1,227,422.
9,819,376.
981,938 2,945,813 2,945,813 2,945,8
Mutonga -
Gituma
Scheme
Dn
63mm-
25mm
12 960,557.00 11,526,684
.00
1,152,668 2,305,337 4,610,674 3,458,0
Kibung'a
Kakimiki
Scheme
Dn
63mm-
25mm
16 1,091,404.
17,462,464
.00
1,746,246 2,619,370 5,238,739 6,111,8
Kathwana Dn
63mm-
25mm
10 1,028,122.
10,281,220
.00
1,028,122 3,084,366 3,084,366 3,084,3
Sub-Total 58,909,120
.00
5,890,912.
13,900,698.00 18,825,404
.40
18,545, 859.20
Water Quality Purchase of
Water Lab
Equipment and Reagents
Burette
100mls, borosil
40 500.00 20,000.00 5,000.00 5,000.00 5,000.00 5,000.0
Retort clamp aluminu m
40 2,500.00 100,000.00 25,000.00 25,000.00 25,000.00 25,000.
Pipette fillers 3- way
40 500.00 20,000.00 5,000.00 5,000.00 5,000.00 5,000.0
Flask boiling flat bottom
250mls, pyrex
40 700.00 28,000.00 7,000.00 7,000.00 7,000.00 7,000.0
Flask boiling flat bottom
500mls,p yrex
40 1,000.00 40,000.00 10,000.00 10,000.00 10,000.00 10,000.
Funnel
100mm plastic
20 150.00 3,000.00 750.00 750.00 750.00 750.00
Measurin g cylinder
500mls,b orosil
20 700.00 14,000.00 3,500.00 3,500.00 3,500.00 3,500.0
Measurin g cylinder
1000mls, borosil
20 100.00 2,000.00 500.00 500.00 500.00 500.00
Measurin g cylinder
50mls,bo rosil
20 500.00 10,000.00 2,500.00 2,500.00 2,500.00 2,500.0
Measurin g cylinder
100mls,b orosil
20 600.00 12,000.00 3,000.00 3,000.00 3,000.00 3,000.0
Volumetr ic flask
500ml,bo rosil
40 800.00 32,000.00 8,000.00 8,000.00 8,000.00 8,000.0
Volumetr ic flask
250mls,b orosil
40 600.00 24,000.00 6,000.00 6,000.00 6,000.00 6,000.0
Volumetr40 500.00 20,000.00 5,000.00 5,000.00 5,000.00 5,000.0
17th May, 2024 THE KENYA GAZETTE
PROPOSED INVESTMENTS
Metering:
Consumer
Meters
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027- ic flask
100mls,b orosil
Conical flask 100 mls,boro sil
40 700.00 28,000.00 7,000.00 7,000.00 7,000.00 7,000.0
Conical flask 500 mls,boro sil
40 800.00 32,000.00 8,000.00 8,000.00 8,000.00 8,000.0
Spatula stainless spoon 8''
40 300.00 12,000.00 3,000.00 3,000.00 3,000.00 3,000.0
Wash bottles
500mls, plastic
40 700.00 28,000.00 7,000.00 7,000.00 7,000.00 7,000.0
First Aid box
16 1,000.00 16,000.00 4,000.00 4,000.00 4,000.00 4,000.0
Retort stand(rod and base)
10'' x 6''
20 3,000.00 60,000.00 15,000.00 15,000.00 15,000.00 15,000.
Graduate d pipete
50ml,bor osil
40 1,000.00 40,000.00 10,000.00 10,000.00 10,000.00 10,000.
Graduate d pipete
20ml,bor osil
40 800.00 32,000.00 8,000.00 8,000.00 8,000.00 8,000.0
Graduate d pipete
10ml,bor osil
40 800.00 32,000.00 8,000.00 8,000.00 8,000.00 8,000.0
Sub-Total 605,000.00 151,250.00 151,250.00 151,250.00 151,25
0.00
Physical
Location
Specifica tions
No. Unit Cost 2024-25 2025-26 2026-27 2027-
Purchase and
Installation of
Pumps
Kathwana
Treatment
Works
Pumphouse
Centrifug al pump
F
50/160A, Q=1100L
/Min,7.5
Kw
2 120,000.00 240,000.00 120,000.00 120,000.00 - -
Mutonga-
Gituma scheme
Treatment works backwash system
Centrifug al pump
F
50/160A, Q=1100L
/Min,7.5
Kw
0 120,000.00 - 120,000.00 120,000.00 - -
Kibung'a scheme treatment works backwash system
Centrifug al pump
F
50/160A, Q=1100L
/Min,7.5
Kw
0 120,000.00 - - - - -
Sub-Total 240,000.00 240,000.00 240,000.00 - -
Acquisition of movable assets
Item Specifica tions
No. Unit Cost 2024-25 2025-26 2026-27 2027-
Motor vehicle
Single
Cab, Engine type
2.8L,2.8 cc,4WD, 1 6,000,000.
6,000,000.
- - 6,000,0
00.00
THE KENYA GAZETTE 17th May, 2024
PROPOSED INVESTMENTS
Metering:
Consumer
Meters
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027-
6-speed, Turbocha rge
- 816,000.00 - 816,00
0.00
Sub-Total 6,000,000.
- 816,000.00 - 6,816,0
00.00
ICT and Related
Assets
Item Specifica tions
No. Unit Cost 2024-25 2025-26 2026-27 2027-
Desktop
Computers
Operatin g
System-
Windows
10, Memory
8gb, HDD
1TB
10 80,000.00 800,000.00 240,000.00 240,000.00 160,000.00 160,00
0.00
Printers Desktop printer,3 in
1(print, scan, copy),dy e ink(black and colour)
10 35,000.00 350,000.00 105,000.00 105,000.00 70,000.00 70,000.
Finance/
Accounti ng
1 2,000,000.
2,000,000.
-
Human
Resource
1 2,000,000.
2,000,000.
1,000,000.
2,000,000.
Technica l
1 2,000,000.
2,000,000.
2,000,0
00.00
GIS 1 2,000,000.
2,000,000.
2,000,000.
Supply chain
1 2,000,000.
2,000,000.
2,000,000.00
Self- service portal
1 2,000,000.
2,000,000.
2,000,0
00.00
TV Smart
UHD 4K
LED TV
43"
1 70,000.00 70,000.00 70,000.00 - - -
Internet connection
(DTF and outside schemes)
Wi-Fi connectio n
1 500,000.00 500,000.00 125,000.00 125,000.00 125,000.00 125,00
0.00
Laptops Windows
10, Core i7,8GB
RAM,1T
B HDD, bag
5 120,000.00 600,000.00 240,000.00 120,000.00 120,000.00 120,00
0.00
CCTV for all schemes
(DTF, treatment facilities and outside schemes)
8no
360degre e CCTV camera kit, screen, DVR with 1
TB hard disk, HDMI,1
0amp power supply
Set 150,000.00 750,000.00 300,000.00 150,000.00 150,000.00 150,00
0.00
17th May, 2024 THE KENYA GAZETTE
PROPOSED INVESTMENTS
Metering:
Consumer
Meters
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027- unit, mouse, Installati on cable, Office
Telephones
GSM wireless landline desk phone
14 10,000.00 140,000.00 40,000.00 40,000.00 30,000.00 30,000.
Large format printer/photo copier
(Black & colour)
Print,sca n,copy,(
A1,A3,A
4 papers)
1 550,000.00 550,000.00 - - 550,000.00 -
Sub-Total 15,760,000
.00
4,120,000.
2,780,000.00 3,205,000.
4,655,0
00.00
Non-Revenue
Water
Item Specifica tions
No. Unit Cost 2024-25 2025-26 2026-27 2027-
Sounding rods
Set 50,000.00 200,000.00 100,000.00 50,000.00 50,000.
Pressure logger
Nominal pressure
20 bars, Temp indicatio n 0.1˚C, Referenc e Temp
+23˚C, Temp effect
(1˚C): ±
0.005%, operating temp -
10/+70˚C
;
Program mable
Resolutio n 1,2,5,&
10, baud rate
38400,19
200 &
9600, Peak
Function readings/ sec, storage
30,000 points incl of
Temp, Power supply -
Batteries
-alkaline batteries size
AAA, 1.5
V(Non- rechargea ble), auto power- off function to
No. 250,000.00 500,000.00 500,000.00 - -
THE KENYA GAZETTE 17th May, 2024
PROPOSED INVESTMENTS
Metering:
Consumer
Meters
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027- conserve power
Leak noise correlator
No. 280,000.00 560,000.00 - 280,000.00 280,00
0.00
Portable meter testing kit
Accuracy within ±
0.5% 0r readings, flow rate
10L/hr to m3/hr,se nsitivity
< 0.003 m/sata any flow rate including zero
Set 180,000.00 720,000.00 360,000.00 180,000.00 180,00
0.00
Pressure reducing valves
Set 265,000.00 2,650,000.
1,060,000.
1,060,000.00 530,00
0.00
Pipe locator Set 300,000.00 300,000.00 - - -
Digital thickness
Meter
Display;
digits,10 mm
LCD;
Measure ment range 1-
200mm, Resolutio n 0.1mm, Accuracy
±0.5%, Sound velocity
500-9000 m/s, Power supply - locally available batteries or AAA batteries;
operating condition
Temp 0 - degree
Celsius, Humidity
< 80%, calibratio n stds 5 steps-
1mm,5m m,10mm, 15mm and
20mm
No. 280,000.00 280,000.00 280,000.00
Arc GIS
Software and
Arc GIS
Pro 2.9
Item 350,000.00 350,000.00 350,000.00
17th May, 2024 THE KENYA GAZETTE
PROPOSED INVESTMENTS
Metering:
Consumer
Meters
Scheme Size Qty Unit Cost
(KSh.)
Estimated
Cost
2024-25 2025-26 2026-27 2027- mapping
Fixed Meter testing bench
Semi-
Automati c Dn 15 -
25 mm
1 - 3,800,000.
3,800,000.
Bulk
Ultrasonic
Flow meter
Dn 250mm
Q3/Q1
R250
1 240,000.00 720,000.00 480,000.00 240,00
0.00
Bulk
Ultrasonic
Flow meter
Dn 200mm
Q3/Q1
R250
1 240,000.00 480,000.00 240,000.00 240,000.00
Bulk
Ultrasonic
Flow meter
Dn 150mm
Q3/Q1
R250
1 180,000.00 1,080,000.
540,000.00 360,000.00 180,00
0.00
Customer cold water meters (for replacement)
Q3/Q1
R250
1000 4,000.00 4,000,000.
2,000,000.
1,000,000.00 1,000,0
00.00
Sub-Total 15,640,000
.00
9,710,000.
3,170,000.00 - 2,460,0
00.00
Annual
Total
33,056,989
.48
36,807,818.61 37,931,525
.01
40,683, 109.20
Dated the 2nd May, 2024.
JULIUS ITUNGA, MR/5723150 Ag. Chief Executive Officer, Water Services Regulatory Board.
Dated the 2nd May, 2024.
JULIUS ITUNGA,
Ag. Chief Executive Officer, Water Services Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
5965
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1) (b)
- Signed By
- JULIUS ITUNGA
- Title
- Ag. Chief Executive Officer, Water Services Regulatory Board
- Date Signed
- 2nd May 2024
- Page
- 34
- Extraction Method
- regex
Source Gazette
Vol. CXXVI No. 66
Published 24th January 2024