GAZETTE NOTICE NO. 5964
GAZETTE NOTICE NO. 5964
THE WATER ACT
(No. 43 of 2016)
EXTENSION
in accordance with the requirements of section 139 of the Water Act, 2016.
THE KENYA GAZETTE 17th May, 2024
After considering the application, the written and oral submissions by all stakeholders during the consultation period, and based on the latest available data, WASREB has determined an upward tariff review for MWEWASCO is justified to improve service delivery, operate sustainably and protect consumer interests by meeting the tariff conditions attached to the tariff.
WASREB gives a one (1) months’ notice to all existing and potential customers of MWEWASCO that the approved tariffs for the three Financial
Years 2024/2025, 2025/2026, and 2026/2027, shall be as follows:
1.0 Approved Tariff Structure for the period
1.1 Water Tariff Structure for the period 2024/2025 to 2026/2027
Consumer Categories Consumption Block Approved Tariff
(m3) (KSh./M3)
Domestic/Residential 1-6 90
7-20. 95
21-50 100
51-100 110
101-300 120
>300 150
Multi-Dwelling Units Per m3 95
Commercial/Industrial 1-50 100
51-100 120
101-300 135
>300 155
Government/Institutions 1-50 100
51-100 120
100-300 135
>300 155
Public Schools 1-600 100
601-1200 105
>1200m3 115
Unique Consumer Categories Water Kiosks (Per m3) 70
Bulk Water Supply (Per m3) 60
Customers with non-functional meters shall be billed based on the average of the last three months’ bill.
1.2 Indexation
The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services
Regulatory Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2025.
1.3 Miscellaneous Charges
Item/ Service Charge (KSh.)
Water Deposit
Category of consumer
Domestic 2500
Retail shops less than 10m3 3000
Retail shops more than 10m3 3,500
Bar, and restaurants less than 15 m3 4000
Bar, restaurants more than 15 m3 6,000
Hotel class “A” and “B” less than 150 m3 12,000
Hotel class “A” and “B” more than 150 m3 15000
Hotel class “C” and ‘D’ less than 150 m3 18000
Hotel class “C” and ‘D’ more than 150 m3 20,000
Hospitals more than 150 m3 20,000
Health centres less than 150 m3 12,000
Schools and other institutions more than 200 m3 20,000
Schools less than 200 m3 10,000
Minor construction sites of more than 200 m3 15,000
Major construction sites more than 300 m3 50,000
Light industries less than 200 m3 30,000
Medium industrial between 200 m3 and300 m3 50,000
Heavy industries of more than 300 m3 100,000
Water Kiosks 5,000
Customers with only sewer connection to be charged a deposit equivalent to water connection
Other Charges
Service
New water connection fee – Connection size: ½ inch to 1 inch 2,500
New water connection fee – Connection size: 1.5 inches to 3 inches 7,500
New water connection fee – Connection size above 3inches 15,000
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000, 16,000 litres 2,500, 5,000 respectively per tanker within WSP area for all consumers
Sale of water Per M3 at bowsing point (own tanker) KSh .95
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Sewer Connection- Residential/ Domestic 5,000
17th May, 2024 THE KENYA GAZETTE
Item/ Service Charge (KSh.)
Sewer Connection- Commercial, Government, Schools, Universities and Colleges 7,500
Sewer Connection- Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee 15,000
Statement of account fees 200
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
Exhauster Services (Company Exhauster) 5,000 for other customers and 4,000 for informal settlements
Private Exhausters (Dumping into the company’s sewer system) 15,000 per Truck per month
Penalties
Illegal water connection, -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of illegality
Illegal water connection, (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at water kiosk 15,000
Illegal sewer connection- Commercial, Industry, Construction 100,000
Illegal sewer connection- Domestic, Government, Schools, Universities & Colleges 30,000
Self-reconnection after cut-off for non-payment 5,000 and billing to be backdated from the date of cut-off
Surcharge for tampering with meters (this to include meter removal, reversing of meter etc) 5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
2.0 Cost Summary
Below is the summary of the recommended cost structure that makes up the total costs to be incurred by MWEWASCO during the tariff period:
Expenditure Item 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027
Operations 63,358,749 75,987,480 86,902,543 96,240,523 106,450,897
Maintenance 3,827,261 12,902,436 15,373,428 17,830,042 21,021,301
Regulatory Levy 3,566,401 4,572,621 6,383,418 6,593,877 6,852,444
Total O&M Costs 70,752,411 93,462,537 108,659,390 120,664,442 134,324,643
Investment Costs 7,650,000 15,395,957 31,424,591 23,963,200 12,395,020
Debt Repayment - 555,892 544,331 521,209 532,770
Total Costs 78,402,411 109,414,386 140,628,311 145,148,852 147,252,433
Total Billing (KSh.) 78,181,176 114,315,522 159,585,445 164,846,928 171,311,099
Collection Efficiency (%) 90% 90% 91% 92% 93%
Projected Revenue 70,312,192 102,883,970 145,222,755 151,659,174 159,319,322
Total Cost Coverage 90% 94% 103% 104% 108%
3.0 Conditions attached to the tariff approval
The conditions attached to this approval which shall form part of the license conditions of MWEWASCO are:
(i) Service Delivery Conditions attached to the Tariff
Target 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027
Water Coverage (%) 61% 63% 65% 67% 69%
Water quality standards (%) 100% Compliance with Standards
Personnel Expenditure as % of O&M 53% 53% 44% 43% 42%
Non-Revenue Water 58% 51% 50% 46% 44%
Hours of Supply (Hrs.) 22 23 23 24 24
Staff per 1000 connections 6 5 5 5 5
Maintenance Expenditure as % of O&M 13% 5% 14% 14% 15%
Metering ratio (%) 92% 92% 100% 100% 100%
Collection Efficiency (%) 97% 90% 90% 91% 92%
Resale at Kiosk KSh. 5.00 per 20l Jerry Can
(ii) Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
(iii) Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by
WASREB.
(iv) Reporting: The utility shall submit quarterly performance reports to WASREB in the prescribed format.
(v) Metering: MWEWASCO shall progressively enhance the metering ratio to attain 100% as per condition (i) above.
(vi) Catchment Protection: The utility shall undertake measures to conserve/ protect the catchment areas of their water source as part of Corporate
Social Responsibility
(vii) Investments: The utility shall undertake the investments in Table 1: Table 1: Investments
Targetted
Investment Project Area Item Description Unit Qty Rate (KSh.) Amount (KSh.)
Metering Purchase of
Consumer Water meters for new connections
Multi-jet type meters
DN15mm plastic material c/w non-return valve and conforming to ISO 4064-
5;2014
No. 1,020 2,900 2,958,000
NRW To reduce NRW Metering of all flat-rate No. 470 2,900 1,363,000
THE KENYA GAZETTE 17th May, 2024
Reduction Plan from 50% to 46% connection
Installation of 5No DMA meters
No. 5 55,844 279,220
Massive tees removal No. 350 8,000 2,800,000
Replacement of faulty meters No. 620 2,900 1,798,000
Calibration, Testing, and
Replacement of faulty production meters
No. 1 1,500,000 1,500,000
Securing major installations
Fencing of
Murarandia office
Masonry wall construction Lumps um
1 300,000 300,000
Fencing of tanks Chain links, barbed wire, and concrete posts fence.
Lumps um
1 300,000 300,000
Construction of chambers for sluice valves, air valves
Masonry chambers No. 8 50,000 400,000
Movable
Assets
Procurement of motorbikes and vehicles
Boxer Bajaj motorbike BM
X150cc
No. 8 200,000 1,600,000
ICT
Infrastructure
Purchase of Laptops Laptop computers of 4GB
RAM, 500GB HD Core i5
No. 3 75,000 225,000
Water extension
Ndutuni sublocation, Mugumoini service line, Mwea service line to increase the number of new connections by 100 connections
Ndutuni sublocation, Mugumoini service line, and
Mwea service line to increase the number of new connections by 100 connections (3.3 KM of
HDPE Pipe DN 63mm, pn16)
Lumps um
1 2,703,294 2,703,294
Gatuya sublocation-
Kahithe service line, Gatheru sublocation- gatahaciu service line, and Karembu serice line to increase the customer database by 110 connections
Gatuya sublocation-Kahithe service line, Gatheru sublocation-gatahaciu service line, and Karembu service line to increase the customer database by 110 connections
(4.5 KM of HDPE Pipe DN
63mm, pn16)
Lumps um
1 3,257,682 3,257,682
Gatheru sublocation-
Karenji, Wanjengi sublocation-Gitui service line, and
Gatuya sublocation-
Kayahwe service line. to increase the customer database by 130 connections
Gatheru sublocation-Karenji, Wanjengi sublocation-Gitui service line, and Gatuya sublocation-Kayahwe service line. to increase the customer database by 130 connections
(4.2 KM of HDPE Pipe DN
63mm, pn16) lumpsu m
1 2,716,229 2,716,229
Rehabilitation of service lines
Gathaithi sublocation-
Mutuango service line; Gacharaigu sublocation-
Kamakabi service line; Iyego sublocation-
Mathioya service line; and Muguru sublocation- Mucwe service line to improve water service provision to
140 existing consumers and increase the number of connections by
50.
Gathaithi sublocation-
Mutuango service line;
Gacharaigu sublocation-
Kamakabi service line; Iyego sublocation- Mathioya service line; and Muguru sublocation-
Mucwe service line to improve water service provision to 140 existing consumers and increase the number of connections by 50.(6 KM of
HDPE Pipe DN 50mm, pn16)
Lumps um
1 3,235,241 3,235,241
Muguru
Sublocation, Gathugu service line to increase the number of new connections by 20 and improve water service provision to the existing 75 consumers
Muguru Sublocation, Gathugu service line to increase the number of new connections by
20 and improve water service provision to the existing 75 consumers (2.5 KM of HDPE
Pipe DN 50mm, pn16)
Lumps um
1 1,292,288 1,292,288
Muguru sublocation, Gathanji service line
Muguru sublocation, Gathanji service line to improve water
Lumps um
1 1,491,761 1,491,761
17th May, 2024 THE KENYA GAZETTE to improve water service provision to the existing 77 consumers service provision to the existing 77 consumers (2.4
KM of HDPE Pipe DN 63mm, pn16)
Githagara
Sublocation-Caen service line, Mbari ya Kiiru service line.
To Improve flow to more than 95 existing connections
Githagara Sublocation-Caen service line, Mbari ya Kiiru service line. To Improve flow to more than 95 existing connections (3 KM of HDPE
Pipe DN 50mm, pn16) lumpsu m
1 1,563,142 1,563,142
Iyego sublocation-
Gikura service line, Gaite service line, and Muguru sublocation- Kagiko
B service line. To improve flow to more than 180.
Iyego sublocation-Gikura service line, Gaite service line, and Muguru sublocation-
Kagiko B service line. To improve flow to more than
180. (3 KM of HDPE Pipe DN
50mm, pn16)
Lumps um
1 1,641,732 1,641,732
Grand Total 31,424,591
Proposed Implementation Year:2025-2026
Targetted
Investment
Project Area Item Description Unit Qty Rate (KSh.) Amount (KSh.)
Metering Purchase of
Consumer Water meters for new connections
Multi-jet type meters
DN15mm plastic material c/w non-return valve and conforming to ISO 4064-
5;2014
No. 942 2,900 2,731,800
Sub -Total 2,731,800
NRW
Reduction Plan
To reduce NRW from 46% to 44%
Conversion of flat rate accounts to metered
No. 524 2,900 1,519,600
Purchase and installation of bulk water meters (DN 315)
No. 5 1000000 5,000,000
Installation of 4 DMA meters No. 4 60,000 240,000
Servicing, testing, and replacement of faulty meters
No. 600 2,900 1,740,000
Office
Furniture upgrade
Procurement of office swivel chairs
Delli executive leather swivel chairs
No. 30 25,000 750,000
Procurement of cabinets for file storage
Procurement of cabinets for file storage
M 5 50,000 250,000
Office phones Procurement of office landline phones
No. 50 10,000 500,000
Asset renewal Procurement of motorbikes and vehicles
Double cabin pickup truck of
3000cc Engine capacity
No. 1 8,500,000 8,500,000
Grand Total 23,963,200
Proposed Implementation Year:2026-2027
Targetted
Investment
Project Area Item Description Unit Qty Rate (KSh.) Amount (KSh.)
Metering Purchase of
Consumer Water meters for new connections
Multi jet type meters
DN15mm plastic material c/w non-return valve and conforming to ISO 4064-
5;2014
No. 843 2900 2,444,700
NRW
Reduction Plan
To reduce NRW from 44% to 41%
Installation of 30 DMA meters No. 30 55844 1,675,320
Carry out customer identification survey
No. 1 1,200,000.0 1,200,000
GIS
Development
Procurement of GIS imagery map 50cm resolution.
Demarcated by zones
Procurement of GIS imagery map 50cm resolution.
Demarcated by zones
No 5 105000 525,000
GIS Section empowerment
Web-based GIS Module hosted by enterprise resource planning system
No 1 2,000,000 2,000,000
Office
Furniture upgrade
Procurement of office swivel chairs
Delli executive leather swivel chairs
No. 10 25,000 250,000
Procurement of cabinets for file storage
Procurement of cabinets for file storage
M 6 50,000 300,000
Procurement of other modules of the Billing system
Technical module Web Based Technical module:
to handle data on NRW, Network Management, Projects, Chemical usage and
No 1 2,000,000 2,000,000
THE KENYA GAZETTE 17th May, 2024
Dated the 2nd May, 2024.
JULIUS ITUNGA, Ag. Chief Executive Officer, MR/5723150 Water Services Regulatory Board.
Dated the 2nd May, 2024.
JULIUS ITUNGA,
Ag. Chief Executive Officer, Water Services Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
5964
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 43 of 2016
- Section
- section 72 (1) (b)
- Signed By
- JULIUS ITUNGA
- Title
- Ag. Chief Executive Officer, Water Services Regulatory Board
- Date Signed
- 2nd May 2024