GAZETTE NOTICE NO. 4453

PURSUANT to Clause 1 of Part III of the Schedule of Tariffs 2023, notice is given that all prices for electrical energy specified in Part II of the said Schedule will be liable to a fuel energy cost charge of plus 326 Kenya cents per kWh for all meter readings to be taken in April, 2024. Information used to calculate the fuel energy cost charge. Power Station Fuel Price in March 2024 KSh./Kg. (Ci) Fuel Displacement Charge/ Fuel Charge in March 2024 KSh./kWh Variation from February, 2024 Prices Increase/(Decrease) Units in March, 2024 in kWh (Gi) Kipevu I Diesel Plant 94.89 - - Kipevu II Diesel Plant (Tsavo) - - - Kipevu III Diesel Plant 95.92 (11.09) 28,753,450 Muhoroni Gt 173.16 - - Rabai Diesel without Steam Turbine 87.99 (13.36) 98,845 Rabai Diesel with Steam Turbine 87.99 (13.36) 36,939,155 Iberafrica Diesel –Additional Plant 102.53 (10.82) 1,692,320 Thika Power Diesel Plant 104.13 (10.98) 824,900 Thika Power Diesel Plant (with Steam Unit) 104.13 (10.98) 1,143,200 Gulf Power 113.07 (11.86) 1,055,584 Triumph Power 83.44 (25.48) 179,800 Triumph Power 83.44 (25.48) 159,150 Olkaria IV Steam Charge 2.75 (0.29) 71,705,450 Olkaria I Unit IV and V Steam Charge 2.75 (0.29) 82,835,450 Sosian Menengai Geothermal Steam Charge 2.75 2.75 26,598,100 Import From UETCL 14.03 (1.49) 17,430,710 Export to UETCL 14.03 (1.49) (3,862,970) Lodwar Diesel (Thermal) 229.11 (35.54) 1,719,735 Mandera Diesel (Thermal) 220.10 (7.62) 1,879,032 Marsabit Diesel (Thermal) 214.03 (22.20) 627,210 Wajir Diesel 211.44 (13.68) 1,744,183 Moyale Diesel (Thermal) - - - Merti (Thermal) 242.74 (23.53) 56,472 Habaswein (Thermal) 252.33 22.01 211,187 Elwak (Thermal) 241.89 (30.52) 254,347 Baragoi 295.22 (3.40) 36,612 MFANGANO (Thermal) 271.76 (15.70) 58,440 12th April, 2024 THE KENYA GAZETTE Power Station Fuel Price in March 2024 KSh./Kg. (Ci) Fuel Displacement Charge/ Fuel Charge in March 2024 KSh./kWh Variation from February, 2024 Prices Increase/(Decrease) Units in March, 2024 in kWh (Gi) Lokichogio 274.30 (16.27) 113,962 TAKABA (Thermal) 261.41 (6.10) 146,237 Eldas 231.77 (24.65) 69,863 Rhamu 254.25 (13.89) 198,831 Laisamis 225.91 (47.56) 41,131 North Horr 295.64 (23.03) 41,280 Lokori 296.62 (7.99) 37,143 Daadab 209.14 (16.27) 220,000 Faza Island 268.91 (29.77) 212,831 Lokitaung 337.17 - 11,196 Kiunga 369.73 - 28,968 Kakuma 228.01 (28.51) 477,979 Banisa 259.39 (16.20) 57,379 Lokiriama 223.42 - 2,448 Kotulo 232.49 (7.95) 33,592 Karmoliban 325.50 (3.70) 77,769 Kholondile 219.71 - 13,210 Sololo 243.58 (23.82) 62,353 Maikona 301.70 - 10,494 Sarif 219.44 219.44 2,484 Hulugo 220.16 - 13,157 Eeu Imports Moyale - - 537,600 Total units generated and purchased (G) excluding exports in March, 2024 1,176,518,190kWh DANIEL K. BARGORIA, MR/6208869 Director-General.

Extracted Entities (1)

previous_gazette_ref

4453

Details

Signed By
DANIEL K. BARGORIA
Title
Director-General
Date Signed
12th April 2024
Page
28
Extraction Method
regex