GAZETTE NOTICE NO. 2699
PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2023, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.45 cents per kWh for all meter readings taken in
March, 2024.
Hydropower Plant Units Purchased in February 2024 (kWh)
Gitaru 68,224,120.00
Kamburu 35,202,690.00
Kiambere 54,740,860.00
Kindaruma 16,414,720.00
Masinga 12,493,900.00
Tana 8,903,220.00
Wanjii 5,127,450.00
Sagana 627,863.18
Turkwel 31,993,000.00
Gogo 799,972.73
Sondu Miriu 15,287,236.80
Sangoro 7,552,241.70
Regen-Terem 1,083,090.00
Chania 171,680.00
Gura 795,418.00
Metumi 1,468,670.00
Information used to calculate the WRMA levy:
Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh
Total units purchased from hydropower plants with capacity equal to or above 1MW = 260,886,132kWh.
Total units generated and purchased (G) excluding exports in February, 2024 = 1,107,061,599kWh
DANIEL K. BARGORIA, MR/6208869 Director-General.
Extracted Entities (1)
previous_gazette_ref
2699
Details
- Signed By
- DANIEL K. BARGORIA
- Title
- Director-General
- Page
- 35
- Extraction Method
- regex
Source Gazette
Vol. CXXVI No. 29
Published 3rd January 2024