GAZETTE NOTICE NO. 745

PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2023, notice is given that all prices for electrical energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.58 cents per kWh for all meter readings taken in December, 2023. Information used to calculate the WRMA levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh Hydropower Plant Units Purchased in November 2023 (kWh) Gitaru 77,383,180 Kamburu 39,771,820 Kiambere 58,776,400 Kindaruma 19,648,060 Masinga 145,930 Tana 12,875,300 Wanjii 5,291,540 Sagana 938,952 Turkwel 32,661,000 Gogo 336,418 Sondu Miriu 21,139,660 Sangoro 11,540,166 Regen-Terem 2,933,430 Chania 112,018 Gura 1,154,242 Metumi 1,944,140 Total units purchased from hydropower plants with capacity equal to or above 1MW = 286,652,256 kWh Total units generated and purchased (G) excluding exports in November, 2023 = 1,111,490,701kWh DANIEL K. BARGORIA, PTG 1271/23-24 Director-General.

Extracted Entities (1)

previous_gazette_ref

745

Details

Signed By
DANIEL K. BARGORIA
Title
PTG 1271/23-24 Director-General
Page
27
Extraction Method
regex