GAZETTE NOTICE NO. 2771
GAZETTE NOTICE NO. 2771
THE ENVIRONMENTAL MANAGEMEN T AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of Environmental (Impact
Assessment and Audit) Regulations, the National Environmental
Management Authority (NEMA) has received an Environmental
Impact Assessment Study Report for the implementation of the proposed TET Tea Factory.
The project comprises construction of a single line CTC factory with a provision for future expansion, administration block, parking area, installation of underground fuel tanks, overhead water tanks and other associated civil works (waste and storm water, and water reticulation drainages).
The proposed TET Tea factory is located at Kimulot location, Kimulot Division of Konoin West District. It neighbours George
Williamson Tea Co, the defunct Koruma Estate which is under the jurisdiction and management of Unilever Tea Ltd at the North, and at the south is Kimulot trading centre. The project site is accessible through a murram road 12 km connecting the highway (Konoin -Sotik road).
The following are the anticipated impacts and proposed mitigation measures:
Possible Impact Mitigation measures
Noise Buffering materials
Effluent discharge Artificial wetlands
Dust Install dust absorbers
Suspended particulate matter
Install dust precipitators
Solid waste Mob up all building wastes, provide sound waste management program
Afforestation Establish afforestation program
Encourage the local communities to plant more trees for sale
Establish a community tree nursery
Fire hazards and accidents
Develop occupational health and safety mechanism
Install fire fighting equipments
Occupational Health and
Safety Issues
Develop lightning policy and evacuation procedure
Install lightning arrestors
Develop documentation procedures
Maintaining and analyzing data
Develop occupational health and safety program
Establish the factory’s SOPs
Water Management Harvest rain water for later use
Install push taps for hand-washing
9th March, 2012 THE KENYA GAZETTE basins
Fit spring loaded hand triggers on water hoses
Monitor usage of water by reading the meter every week
Measure for different departments
Evaluation of alternatives Widen the road right from the turn off
Use the immediate turn off from
Kimulot Trading centre
Locate to the Eastwards
Providing parking bay
Policy framework Establish policy
Establish system and procedures
Train emergency team, fire brigade, first aid team and local community
Arrange for fire drills, install exits and designate an assembly point
Install fire engine complete with water tank and pipes, fire extinguishers
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839 - 00200, Nairobi.
(b) Permanent Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30521, Nairobi
(c) Provincial Director of Environment, Rift Valley Province.
(d) District Environmental Officer, Konoin District.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the approval process of the project.
B. M. LANGWEN, for Director-General, MR/8843232 National Environment Management Authority.
Dated the 9th March, 2012.
B. M. LANGWEN,
for Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
2771
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMEN T AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- B. M. LANGWEN
- Title
- for Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 9th March 2012
- Page
- 78
- Extraction Method
- regex
Source Gazette
Vol. CXIV No. 18
Published 9th March 2012