Back
REGULATION
100% confidence
via regex
GAZETTE NOTICE NO. 2770
GAZETTE NOTICE NO. 2770
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of Environmental (Impact
Assessment and Audit) Regulations, the National Environmental
Management Authority (NEMA) has received an Environmental
Impact Assessment Study Report for the implementation of the proposed LPG bulk storage and filling depot.
The proposed project entails construction of modern, medium size
LPG storage and filling plant in Kisumu.
The project site is located in Kisumu North District in Nyahera
Division, at Kanyakwar Sub-location, East Kisumu Location. It lies within 0° 60' 0" South, 34° 45' 0" East coordinates. The proponent purchased about ten plots at Kanyakwar viz Kisumu/Kanyakwar
B/17/675 – 685. The plot is located on the Kisumu Vihiga highway opposite the new Mosque and Farm Engineering.
The following are the anticipated impacts and proposed mitigation measures:
Possible Impact Mitigation measures
Soil erosion and sedimentation
Installation of soil traps on lower edges.
Installation of traps for stored loose construction materials such as sand.
Water pollution and quality
Water sprinkler system.
Ensure effective drainage into the septic tank.
Regular maintenance checks on drainage
2nd March, 2012 THE KENYA GAZETTE system.
Roof catchments installed.
Installation of water saving tap models.
Install 200m liters water tank.
Dust Regular watering of access routes to reduce dust.
Provision of dust masks to workers.
Emissions
Use of mufflers on heavy equipment and vehicles.
Reduction in use of machinery to necessary requirement only.
Regular check of gas leak detection system, pipeline seams, pneumatic cut off system and remote operating valves for automatic cut-off of the system to cub greenhouse gas emissions.
Noise
Operation during daylight hours only.
Provision of ear muffs to site workers.
Construction of high perimeter wall around the site.
Biodiversity-devegetation Minimal excavation.
Devegetation of bare areas.
Planting indigenous trees.
Solid waste disposal Ensure appropriate waste baskets available in offices.
Outsource a NEMA registered waste disposal agent to collect and dispose of solid waste.
Social concerns Fencing off the project site and limiting movement and attraction of unwanted characters during construction.
Constant body search of visitors for combustible substances i.e. mobile phones, matchboxes, lighters, etc.
Outsourcing for security personnel.
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839 - 00200, Nairobi.
(b) Permanent Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30521, Nairobi
(c) Provincial Director of Environment, Nyanza Province.
(d) District Environmental Officer, Kisumu East and West
Districts.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the approval process of the project.
Z. O. OUMA, for Director-General, MR/9095296 National Environment Management Authority.
Dated the 2nd March, 2012.
Z. O. OUMA,
for Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
2770
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- Z. O. OUMA
- Title
- for Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 2nd March 2012
- Page
- 64
- Extraction Method
- regex
Source Gazette
Vol. CXIV No. 17
Published 2nd March 2012