GAZETTE NOTICE NO. 1574
GAZETTE NOTICE NO. 1574
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
DESIGNATION
PURSUANT to regulation 21 of Environmental (Impa ct
Assessment and Audit) regulations, the National Environmental
Management Authority (NEMA) has received an Environmental
Impact Assessment Study Report for the implementation of the proposed Iluluwe project (Formerly Athi Springs)..
The project will involve construction of apartments, Villas, town houses, sports club, cottages, retail center, 18 holes golf course, club house and golf front homes. In support of the proponent‘s vision lots of 3, 50 and 200 acres of land, currently defining the various development phases shall be subdivided into ¼ acres and 1/8 acre lots and which sub plots shall be offered for sale under a controlled development scheme. Provision of more than 70 acres will also be made for a sports club, theme park, shopping mall, office park, ICT
Park, hotel and conference, schools, petrol station, hospital, church and community center which developments shall be undertaken in structured phases within the regulatory framework contemporaneously with the residential and infrastructural development.
The proposed site is situated about 46 km from Nairobi and 15 Km from Athi river town. The project will be on L.R 13208/2.The total area is 1000 Acres.
The following are the anticipated impacts and proposed mitigation measures:
Anticipated
Environmental
Impacts
Mitigation Measures
Air And Dust
Pollution
Carry out vegetation clearance on a phased basis.
Spray stockpiled materials and open ground areas with water
Material trucks should be covered during delivery to the site.
Source raw materials within vicinity
Maintain vehicles, while machines must not be left idling.
Implement appropriate traffic signals and signs.
Water Quality
(Effluent
Discharge)
Fuels and raw materials should be stored properly, away from water bodies
Conduct periodical water quality monitoring.
Ensure that golf course is lined to prevent ground water contamination
Use approved fertilizer and pesticides and according to manufacturers‘ instructions
Soil Erosion And
Compaction
Install appropriate drainage systems
Provide adequate screens
Avoid the traversing of bare soil by vehicles
Designate a main access route for heavy machinery;
Ensure designation of a maintenance area for vehicles and other equipment.
Noise And
Excessive
Vibration
Allocate designated access roads
Use silenced machinery and instruments and site the same appropriately.
Supply workers with ear plugs and ear muffs.
Employ temporary noise barriers.
Observe construction hours of 8:00 a.m. to
6:00 p.m.
Provide traffic signage and signals.
Effect On
Landscaping
And Aesthetics
Conduct planned vegetation clearance and re-vegetation and retain vegetation screens.
Ensure that local building materials and muted colors are used.
Socio-Economic
Impacts
Develop a CSR programme to involve the locals.
Dedicate vending sites where waste receptacles are provided.
Educate food vendors on food safety and poisoning
Purchase goods and supplies from suppliers within the area.
Improve and maintain road network to provide access
Increase In
Water And
Energey Use
Ensure that there is adequate water available
Use of rain water harvesting methods and the maximizing of recycled water in the irrigation activities.
Install energy saving bulbs and Utilize solar panels.
Increase In Solid
Waste
Ensure waste is collected by NEMA approved waste collection company
All the refuse generated should be properly transported and disposed.
Provide garbage receptacles.
Security Ensure employment of persons from the nearby communities.
Ensure that buildings are properly secured; and that there is adequate security
Occupational
Health And
Safety
Ensure plans are approved by Municipal
Council of Mavoko
Provide all employees with safety and protective gear.
THE KENYA GAZETTE 10th February, 2012
372 372
Designate and communicate the OHS roles and responsibilities of employees
Ensure that all machinery used on the site is properly maintained and inspected before use.
Install several suitable, approved fire extinguishers
Place a fully equipped first aid kit on the project site.
Place warning signs for hazardous or flammable substances.
Place information signs around the project site in case of emergency
Keep emergency logs including emergency contacts.
Ensure chemicals are stored safely and
MSDS are made available.
Ensure compliance to the Occupational
Health and Safety Act of 2007
The full report of the proposed project is available for inspection during working hours at:
(a) Director General, NEMA, Popo Road, off Mombasa
Road, P.O. Box 67839 - 00200, NAIROBI
(b) Permanent Secretary, Ministry of Environment and
Natural Resources, NHIF Building, Community, P.O.
Box 30521, Nairobi
(c) Provincial Director of Environment, Eastern Province.
(d) District Environmental Officer, Machakos District.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director General, NEMA, to assist the Authority in the approval process of the project. (EIA/5/2/796)
B. M. LANGWEN, For: Director-General, MR/8806074 National Environment Management Authority.
Dated the 10th February, 2012.
B. M. LANGWEN,
For: Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
1574
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- B. M. LANGWEN
- Title
- For: Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment
- Date Signed
- 10th February 2012