Back
EXTENSION
100% confidence
via regex
GAZETTE NOTICE NO. 11788
GAZETTE NOTICE NO. 11788
THE WATER ACT
(No. 8 of 2002)
EXTENSION
MURANG‘A SOUTH WATER AND SANITATION COMPANY
LIMITED (MUSWASCO)
NEW WATER AND SEWERAGE TARIFF
WATER Services Regulatory Board (WASREB) has approved newly proposed water and sewerage tariffs for implementation by
Murang‘a South Water and Sanitation Company in line with Section73
(5) of the Water Act, 2002.
By extension therefore, Tana Water Services Board (TWSB) gives a two months notice to all existing and potential water and sanitation customers of Murang‘a South Water and Sanitation Company that the tariffs have been adjusted as per the Service Provision Agreement between TWSB and Murang‘a South Water and Sanitation Company as approved by WASREB
1.0 Water Tariff Structure for Year 2012/ 2013 and 2013/14
Type of customer
Domestic/Residential
Consumption Block
0-6m
Flat rate 210.00
7-20 m
55.00
21-50 m
70.00
51-100 m
85.00
101-300 m
105.00
>300 m
135.00
Commercial
Consumption block
0-6 m
Flat rate 222.00
7-20 m
57.00
21-50 m
72.00
51-100 m
87.00
101-300 m
107.00
>300 m
137.00
Government Institutions
Consumption Block
0-6m
Flat rate 210.00
7-20 m
55.00
21-50 m
70.00
51-100 m
85.00
101-300 m
105.00
>300 m
135.00
Schools/Colleges/Institutions
<600m
50.00
600 <1200 m
80.00
>1200m
100.00
Water Kiosks 35.00
2.0 Miscellaneous Charges
2.1 Meter Rent per Month.
Meter Rent
Meter size Approved (Kshs)
½ inch 50
¾ inch 50
1 inch 250
1 ½ inches 250
2 inches 250
2 ½ inches 450
3 inches 450
4 inches 800
>4 inches 1500
2.2 Deposits
Water Deposit
Connection Type Approved (KSh.)
Domestic consumer (single dwelling) 1500
Domestic consumer (single connection serving more than one single dwelling including flats) consuming more than 200 cubic meters 10,000
Water Kiosks where anticipated monthly consumption is
Less than 50m
1,000
Between 50m and 100m
2,000
Between 100m and150m
2,500
More than 150m
3,000
Retail shops, workshops and offices consuming more than 10 cubic meters
3,000
Bar, restaurant and lodgings more than 15 cubic meters
5,000
Hotel class ‗A‘ and ‗B‘ less than 150 cubic meters 10,000
Hotel class ―C‖ and ‗‘D‘‘ more than 150m
15,000
Hospitals more than 150m
20,000
Minor construction site (temporary connection) less than 200 cubic meters
10,000
Large construction site (temporary connection) more than 200 cubic meters
50,000
Light industries less than 200 cubic meters 10,000
Medium industries between 200and 300cubic meters
15,000
Heavy industries more than 300 cubic meters 20,000
Health centres/dispensaries less than 150 cubic meters
5,000
Schools/colleges and other institutions more than
200 cubic meters
10,000
Schools less than 200 cubic meters 5,000
Topping up of consumer deposit after disconnection based on actual average consumption for domestic consumers
The actual cost subject to a minimum cost of
2,500.00
2.3 Other charges
Type of Service Approved Rate
(KSh.)
For special reading of a meter 200
For cutting off supply at the request of customer 200
For turning on the supply otherwise than in respect of a first connection
For turning on the supply after a disconnection for non-payment
Water Bowser (own transport) per cubic meter 100
Water Bowser by WSP 2,500
For testing of a meter at the request of the consumer where it is not found to register correctly to any degree exceeding 5 percent
The actual cost subject to a minimum charge of 500.00
Penalties Approved (KSh.)
Self reconnection after cut off for non payment
5,000.00 and billing to be backdated from date of cut off
Surcharge for illegal connection –
Domestic
10,000.00 and regularize connection
Surcharge for illegal connection –
Commercial/school/college /hospital
40,000.00 and regularize connection
Surcharge for illegal connection –
Construction site
100,000.00 and regularize connection
Surcharge for illegal connection –
Industry
500,000.00 and regularize connection
Illegal connection - sewerage Charges equal to those of illegal connections of water per category
Surcharge for tampering with meters
(this to include meter removal, reversing of meter, etc)
5,000.00
Surcharge for direct suction of water from the supply line using a pump
10,000.00
Surcharge for meter loss or damage Cost of the meter
MOSES M. NAIVASHA, Chief Executive Officer, Tana Water Services Board (TWSB).
Approved by:
ROBERT GAKUBIA, Chief Executive Officer, MR/0430715 Water Services Regulatory Board (WASREB.
17th August, 2012 THE KENYA GAZETTE
Dated the 17th August, 2012.
ROBERT GAKUBIA,
Chief Executive Officer, Water Services Regulatory Board (WASREB.
Extracted Entities (1)
previous_gazette_ref
11788
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 8 of 2002
- Signed By
- ROBERT GAKUBIA
- Title
- Chief Executive Officer, Water Services Regulatory Board (WASREB
- Date Signed
- 17th August 2012
- Page
- 70
- Extraction Method
- regex
Source Gazette
Vol. CXIV No. 76
Published 17th August 2012