GAZETTE NOTICE NO. 15072
GAZETTE NOTICE NO. 15072
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of Environmental (Impact
Assessment and Audit) Regulations, the National Environmental
Management Authority (NEMA) has received an Environmental
Impact Assessment Study Report for the implementation of the proposed Rehabilitation and Augmentation of Nyahururu Cluster
Water and Sanitation Project.
The Proponent (Northern Water Services Board) of the proposed
Rehabilitation and Augmentation of Nyahururu Cluster Water and
Sanitation Project is proposing to carry out construction and supervision of Nyahururu Clusters Water and Sanitation project.
The following are the anticipated impacts and proposed mitigation measures:
Possible Impact Mitigation measures
Conflicts with existing sanitation amenities
• Involve the community groups on suitable site.
• Selection and level of responsibility.
Potential access conflicts • Ensure sites are easily accessible by a majority of the beneficiary at all times.
• Ensure proximity to appropriate services (main water pipes, sewer line and drainage.
26th October, 2012 THE KENYA GAZETTE
Potential social and economic disruptions
• Future ownership of the facilities to remain Public.
Acceptability of the proposed interventions
• Undertake public consultations to sensitize and register the stakeholders’ opinion.
Potential social and economic disruptions
• Where land is required for acquisition, appropriate resettlement action plan (RAP) shall be undertaken in accordance with regulations and procedures.
• Any necessary compensation shall be made in good time and adequately.
Acquisition of public land • Residents encroaching on require public spaces be asked to give way.
Environmental pollution from disposal of waste.
• Waste materials from sites’ clearance be disposed off into approved dumping grounds.
Potential blockage of drainage systems from the solid refuse.
• Protect local drains from accumulation of solid wastes.
• Provide signage and information for public safety around the construction areas.
Effects to health of the immediate residents
• Isolate construction locations from children on health grounds.
Potential high noise and vibration
• Where necessary, low noise and emission machinery shall be applied and for short durations.
• Where necessary, low noise and emission machinery shall be applied and for short durations.
Potential disruption of public amenities
• Identify affected public amenities for necessary protection and management.
Potential disruption of housing and business structures on the road reserves
• Ensure minimal disruption to housing and business structures unless they have encroached onto road reserves.
Potential risks to water quality from catchment degradation
• Initiate a process for catchment rehabilitation in collaboration with relevant authorities and the local communities.
Loss in dam capacity from siltation and invasive weeds
• Address urgently the risks of siltation of the dam from the land use practices in the area.
Potential for interference with recharge to Manguo swamp and Ewaso Narok
River downstream.
• Monitor on continuous basis the effects of the galleries to downstream surface flows and condition of Manguo swamp.
Risks of interfering with immediate shallow wells
• Undertake full EIA study upon identification of specific borehole locations on the area for approval by
NEMA and no objection from other stakeholders.
Possible un-sustainability of the communal watering points (water kiosks).
• With the support of relevant authorities to gradually stop illegal water connections and vending to enhance sustainability of the water kiosks.
Water losses from inefficient use and leaking taps at user points.
• Ensure all water pipelines and taps are maintained leak-proof at all times.
Nuisance from spilt water along pipelines and at draw points.
• Maintain records on water (bulk meter readings) for communal water kiosks, volume dispensed per day and sales volumes.
Potential discharge of raw sewage into open grounds and drains
• All manholes should remain covered at all times to control leakages and dum Provide appropriate monitoring devices
(flow measurements and sampling points).
• Monitoring to include the receiving
Ewaso Narok System. ping of solid waste materials as well as All screenings shall be contained for appropriate disposal, preferably through burning. Safety risks.
Potential occupational health and safety by the ponds operators.
• Provide ponds operators with appropriate personal protection gear and enforce application.
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi.
(b) Permanent Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30521, Nairobi.
(c) County Director of Environment, Laikipia County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of the plan.
B. M. LANGWEN, for Director-General, MR//0518928 National Environment Management Authority.
Dated the 26th October, 2012.
B. M. LANGWEN,
for Director-General,.
Extracted Entities (1)
previous_gazette_ref
15072
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- B. M. LANGWEN
- Title
- for Director-General,
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 26th October 2012
- Page
- 72