Back
REGULATION
100% confidence
via regex
GAZETTE NOTICE NO. 13919
GAZETTE NOTICE NO. 13919
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of Environmental (Impact
Assessment and Audit) Regulations, the National Environmental
Management Authority (NEMA) has received an Environmental
Impact Assessment Study Report for the implementation of the proposed installation of on-surface pre-fabricated 210m
Industrial
Diesel Oil (IDO) storage tanks) on Plot No. 209/8849, Lunga Lunga road industrial area next to Kenya Pipeline Corporation (KPC) depot, Nairobi County.
The Proponent (Lunga Lunga Petroleum Company Limited) of the proposed installation of on-surface pre-fabricated 210m
Industrial
Diesel Oil (IDO) storage tanks) proposing to install a three cylindrical steel tanks of 210m capacity for storage of Industrial Diesel Oil (
IDO). The Tanks will be fabricated elsewhere and installed on site.
The following are the anticipated impacts and proposed mitigation measures:
Possible Impact Mitigation measures
General waste and solid wastes
All solid waste will be collected at a central location on site and will be stored temporarily before collection by
CCN trucks
No dumping within the surrounding area is to be permitted
The Station refuse areas should be secured and enclosed to minimize the risk of accidents and attracting scavengers.
Separation of the wastes on site to enable recycling and resource recovery as the 3R principles.
Site Traffic & Safety Place prominent signage alerting oncoming traffic (both human and vehicle) to the site
Provide safety visibility measures for vehicles coming out of the facility.
Train installation workers on Occupation
Health and safety and basic first aid training
Waste water Periodic checks and regular maintenance should be carried out on the functioning of the wastewater system
Document volume of waste to aid in determining improvements with regard to waste management.
Timely Servicing of machineries on site to avoid cases on leaks
Install oil/ fuel leak detectors on site
Construction of gully and collector pit.
Construction of drainage lines and oil interceptor
Air quality / Dust Control Vehicles should switch off engine during while at site
Warning signs against smoking should be displayed on site
28th September, 2012 THE KENYA GAZETTE
Mitigatory measures such as wetting down, as well as the erection of shade netting screens to prevent offsite movement of dust may also be required.
Any construction machineries found to be emitting excessive smoke should be stopped from the operations for some mechanical attention before it could continue
Provision of dust masks to workers when working in dusty environment
Runoff, Spill & Leak prevention
Regular inspection of the drainage system and recovery of volumes during the rainy season to minimize risk of flushing.
Pipes carrying waste water and fuel should be repaired and maintained in case of breakages.
Health and safety management
Provide first aid facility
Develop employee training programme on health and safety
Establish health safety plan frame work of procedures to protect the health and safety of all personnel during operations
Occupational health risk to workers and general public
The proponent shall prepared Method
Statements covering the procedures and response plan for the main activities, which could generate emergency situations through accidents or neglect of responsibilities.
The proponent shall ensure that his employees are aware of the procedure for dealing with spills and leaks.
The proponent shall assemble and clearly list the relevant emergency telephone contact numbers
The proponent shall comply with all standard and legally required health and safety regulations as promulgated under the Occupational Health and Safety Act
2007 and associated regulations
The proponent must provide and maintain personal protective equipment and facilities to employees at all times during operation of the tanks
Official training in the correct fit, use, care, storage and limitations of all
Personal Protective Equipment must be given to the employees
The proponent shall provide a standard first aid kit at the site office of each camp
Fire and Accident
Prevention
An inventory should be kept for all fire protection measures.
‗No smoking‘ sign should be prominently displayed.
A supply of relevant (in case of fuel powder) First Aid cylinders should be maintained and regularly serviced.
Regular training of the personnel in relation to fire emergency and accidents.
Firefighting equipment should be kept in easily accessible places and be regularly checked.
Excavations /earth movements
Excavations should be limited to the tank plat form
Contingency plans should be designed for the rapid control of spilled material as near to the source as possible.
De-mobilization The site is to be cleared of all construction materials, including litter prior to hand over
Fences/barriers associated with the construction phase must be removed from the site
Fences, barriers and demarcations associated with the construction phase must be removed from the site
Rehabilitation Activities of
Environmental Cases indentified must continue throughout the defect liability period
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi.
(b) Permanent Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30521, Nairobi.
(c) County Director of Environment, Nairobi County.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process of the plan.
Z. O. OUMA, for Director-General, MR/0462432 National Environment Management Authority.
Dated the 28th September, 2012.
Z. O. OUMA,
for Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
13919
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- Z. O. OUMA
- Title
- for Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 28th September 2012
- Page
- 78
- Extraction Method
- regex
Source Gazette
Vol. CXIV No. 93
Published 28th September 2012