GAZETTE NOTICE NO. 10710

PURSUANT to clause 1 of part III of the Schedule of Tariffs 2008, notice is given that all prices for electrical energy specified in part II of the said schedule will be liable to a fuel cost charge of plus 539 cents per kWh. for all meter readings taken in July, 2012. Information used to calculate the fuel cost charge: Power Station Fuel Price in Sh./Kg. (Ci) June, 2012 Fuel Displacement Charge/Fuel Charge June, 2012 Sh./kWh. Variation from May, 2012 Prices Increase/(Decrease) Units in June 2012 in kWh. (Gi) Kipevu I Diesel Plant 64.74 (1.73) 15,446,000 Kipevu II Diesel Plant (Tsavo) 72.91 (2.74) 14,427,800 Kipevu III Diesel Plant 63.90 (1.22) 27,058,000 Embakasi GT 2 95.50 (5.51) 1,240,019 Rabai Diesel (without steam turbine) 70.73 (4.50) 75,560 Rabai Diesel (with steam turbine) 70.73 (4.50) 24,640,440 Iberafrica Diesel 79.39 (0.38) 25,363,440 Iberafrica Diesel–Additional Plant 79.22 (0.35) 25,725,500 Mumias Sugar Company 2.88 0.01 11,274,000 Orpower4 2.97 0.03 36,202,620 UETCL Import 16.90 (0.31) 3,182,450 UETCL Export 16.90 (0.31) (1,932,050) Olkaria Wellhead OW37 4.93 — 571,260 Emergency Power (Embakasi 6) 112.09 (5.43) 12,527,280 Emergency Power (Embakasi 7) 112.10 (5.43) 5,668,030 Emergency Power (Muhoroni) 114.26 (5.55) 1,729,480 Garissa Diesel 95.55 (4.66) 1,556,655 Lamu Diesel 98.52 (5.11) 496,415 Lodwar Diesel (thermal) 135.24 (7.53) 321,652 Mandera Diesel 147.53 (3.59) 364,506 Marsabit Diesel (thermal) 131.09 (7.09) 217,159 THE KENYA GAZETTE 3rd August, 2012 2826 2826 Power Station Fuel Price in Sh./Kg. (Ci) June, 2012 Fuel Displacement Charge/Fuel Charge June, 2012 Sh./kWh. Variation from May, 2012 Prices Increase/(Decrease) Units in June 2012 in kWh. (Gi) Wajir Diesel 135.96 (3.81) 437,113 Moyale Diesel (thermal) 134.94 — 3,315 Mpeketoni 130.34 0.06 138,675 Hola 130.66 1.80 164,807 Merti (thermal) 132.61 0.55 15,295 Habaswein (thermal) 143.59 5.76 60,989 Elwak 144.30 (1.57) 38,718 Baragoi 131.06 — 13,914 Mfangano 130.53 — 10,720 Lokichogio 144.17 — 12,408 Emergency Power Energy Charge Recovery 0.76 — 19,924,790 WARMA Water use Charge for hydro plants above 1mW– Recovery for June, 2012 0.05 — 341,500,813 Total units generated and purchased including hydros, excluding export (G) = 641,598,403 kWh. L. K. NJAGI, MR1944256 Company Secretary.

Extracted Entities (1)

previous_gazette_ref

10710

Details

Signed By
L. K. NJAGI
Title
MR1944256 Company Secretary
Date Signed
3rd August 2012
Page
21
Extraction Method
regex