Back
OTHER 89% confidence via regex

GAZETTE NOTICE NO. 11325

PURSUANT to clause 1 of part III of the Schedule of Tariffs 2008, notice is given that all prices for electrical energy specified in part II of the said schedule will be liable to a fuel cost charge of plus 821 cents per kWh. for all meter readings taken in September, 2011. Information used to calculate the fuel cost charge: 16th September, 2011 THE KENYA GAZETTE Power Station Fuel Price in Sh./Kg. (Ci) August, 2011 Fuel Displacement Charge/Fuel Charge August, 2011 Sh./kWh. Variation from July, 2011 Prices Increase/(Decrease) Units in August, 2011 in kWh. (Gi) Kipevu I Diesel Plant 66.93 1.41 24,748,000 Kipevu II Diesel Plant (Tsavo) 69.43 2.77 35,948,900 Kipevu III Diesel Plant 64.50 0.45 61,670,000 Embakasi GT 1 71.36 — 3,300,938 Rabai Diesel 81.79 6.06 31,913,000 Iberafrica Diesel 78.31 (0.98) 33,819,177 Iberafrica Diesel–Additional Plant 78.26 (1.01) 35,075,390 Mumias Sugar Company 3.15 0.09 2,865,000 Orpower4 3.43 (0.02) 31,647,670 UETCL Import 16.40 0.30 3,086,900 UETCL Export 16.40 0.30 (3,320,750) Emergency Power (Embakasi 6) 100.47 — 29,894,010 Garissa Diesel 103.92 2.88 1,546,947 Lamu Diesel 107.53 3.20 574,706 Lodwar Diesel 143.48 8.28 315,066 Mandera Diesel 151,71 13.85 414,432 Marsabit Diesel 138.96 13.61 221,937 Wajir Diesel 146.07 (0.44) 438,535 Moyale Diesel 140.09 8.95 206,492 Mpeketoni 130.47 6.35 128,060 Hola 127.30 3.23 164,297 Merti 127.55 7.64 16,033 Habaswein 110.74 4.84 53,411 Elwak 126.74 15.25 41,186 Baragoi 97.82 4.88 13,096 Mfangano 105.87 — 6,078 Total units generated and purchased including hydros, excluding export (G) = 643,341,295 kWh. L. K. NJAGI, Company Secretary.

Extracted Entities (1)

previous_gazette_ref

11325

Details

Signed By
L. K. NJAGI
Title
Company Secretary
Date Signed
16th September 2011
Page
14
Extraction Method
regex