Back
REGULATION
100% confidence
via regex
GAZETTE NOTICE NO. 13758
GAZETTE NOTICE NO. 13758
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of Environmental (Impact
Assessment and Audit) Regulations, the National Environment
Management Authority, (NEMA) has received an environmental impact assessment study report for the construction of the proposed development of a temple and a community housing.
The proposed development will entail construction of a temple, motor vehicle parking area, two bedroom apartment units contained in twelve (12) blocks, three bedroom apartment units contained in ten
(10) blocks and Shops contained in one block.
The proposed project is located on plot L.R No. 209/16781 and
L.R No. 209/16782, Langata area along the proposed Southern by-pass within Nairobi County. The site is next to ongoing construction of residential housing flats by National game park development.
The following are the anticipated impacts and proposed mitigation measures:
Environmental issue Mitigation Measures
Water body pollution prevention
Avoid accumulation of solid wastes on the site.
The waste storage section should be located away from any water body i.e.
about a hundred meters
Accident to the construction employees
Provide adequate personal protective equipments to the employees.
Enforce the use of such garments.
Put up warning signs within the site.
Put in place safety nets during the construction.
Proper handling and storage of materials used in the upper floors to eradicate cases of falling objects.
Use well serviced tools, implements and machines on site.
Noise pollution prevention
Use of necessary gadgets by workers on site.
Use well serviced equipments/machines/trucks as noise would affect the nearby ecosystem.
Idle machines should always be shut down.
Use low voices by workers during construction.
Undertake construction activity during day time only.
Accidents to demolishing team.
Provide personal protective garments.
Issue the team with reflective garments.
Deploy an expert to control and guide the workers.
Loss of job opportunities Promise to recall the worker if another project is to be conducted.
Reward workers and compensate team where necessary.
Destruction of aesthetic beauty
Introduction of flowers and tree species in the site.
Care of some of the existing plants which would be left untouched.
Waste management plan Preparation of a waste management policy.
Provision of waste bucket within the rooms and the compounds.
Put up a monitoring system for the waste produced
No burning on wastes on site.
Regular emptying of waste bin and main bins to avoid overflowing.
Enhance the sorting up of different constituents of the waste.
Generation of solid waste materials.
Contract an expert to guide site clearance and garbage collection activities.
Disposed wastes in a legal dumpsite.
Killing of micro organisms
The transportation trucks should carry the recommended load.
Avoid use of extra heavy machines.
Limit the space used on the ground near the building.
THE KENYA GAZETTE 28th October, 2011
4204 4204
Dust pollution Ensure that closed up machines are used during mixing.
Sprinkle water to harness dust along drive ways.
Provision of nose masks to the workers.
Undertake the construction activity during day time only.
Enforce the use of the provided personal protective garments.
Liquid waste disposal problem.
Regular monitoring of inspection chambers and drainage channel lines.
All waste water be directed to the drainage lines.
Avoid materials that block the drainage system.
Encourage recycling and reuse of waste water.
Ensure that water taps are tightly closed.
Ensure that no waste water flows to the nearby ecosystem
Water problems Avoid unnecessary wastage of water.
Water holding containers be well placed, covered and with no leakages.
Provide storage tanks at various points
If water scarcity persists, dig a borehole to supplement the available water
Accidents during working hours.
Provide workers with highly reflective garments.
Provide workers with personal protective garments.
Put signage to indicate work in progress.
Ensure workers operating the machines are properly instructed and skilled.
Regular servicing of machines.
Train workers on manual handling techniques.
Accidents from the vehicles delivering materials.
Ensure that all vehicles are insured and road worthy.
Set relatively low and controllable speed limit within the site.
Encourage vehicle owners to servicing their vehicles and checking breaking system regularly.
Solid waste from domestic activities
Contract NEMA registered garbage collector.
Regular collection of solid waste by the contracted collector.
Utilize the closed up central bins provided and ensure it is regularly emptied
Provision of waste buckets to all the tenants and along the walkways.
Proper sorting of wastes so as to separate liquid from solid wastes.
Increased pressure on water resources.
Encourage recycling and re-use of water.
Discourage unnecessary wastage of water.
Dig a borehole to supplement the available water
Increased pressure on energy resources
Encourage the use of energy saver bulbs.
Switching off lights hen not in use.
Provide an emergency generator which should be installed in a sound proof area
Noise generation from the The prayer halls should be equipped with
Temple during prayer sessions numerous low volume speakers‘ rather than a few high volume speakers. This will make each worshiper to hear the preaching without necessarily causing nuisance to the immediate neighbours and ecosystem
Sound proof materials should also be introduced along the walls to absorb excessive noise within prayer halls
Any celebrations of the Temple be done inside the halls to avoid unnecessary high voices which would affect the immediate ecosystem
Security in the site Maintain the security officer (watchman) within the site.
Provision of security light.
Ensure that there is a person monitoring people who enter through the gate.
Health and Safety management
Preparation of an emergency action plan
Servicing the available fire extinguishers
The outside security lights should not resemble the landing lights of Wilson
Airport
Fire accident Encourage to handle and store flammable materials safely and keeping them out of reach of children e.g.
cooking gas.
Clearly label fire exit route.
Provide and regularly be servicing fire fighting equipments.
Wiring in the building should be done by qualified electrician and one who is recommended by Kenya Power and
Lightening Company.
Noise and vibration pollution
Switching off machines when not in use.
Use well serviced and enclosed machines.
Ensure work is scheduled during the normal working hours i.e. 8.00 am –
5.00pm.
Construction workers should converse in low tones.
Make sound proof walls in the Temple prayer halls
Plant/put living plants trees within the precincts of the Temple to arrest noise
Put low noise making loud speakers in the Temple prayer hall
Environmental enhancement
Assessing the level of compliance to the environment by conducting
Environmental Audit
Identification of the shortfalls and working on them
Introduce some trees and flowers in vases
Carrying out
Environmental Audit
Assessing the level of compliance to the environment
Identification of the shortfalls and working on them
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, the National Environment Management
Authority (NEMA), Popo Road, off Mombasa Road, P.O. Box
67839–00200, Nairobi.
(b) Permanent Secretary, Ministry of Environment and Mineral
Resources, N.H.I.F. Building, Community, P.O. Box 30521, Nairobi.
28th October, 2011 THE KENYA GAZETTE
(c) Provincial Director of Environment, Nairobi Province.
(d) District Environment Officer, Langata District.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the approval process of the project.
WILKISTER MAGANGI , for Director-General, MR8247465 National Environment Management Authority.
Dated the 28th October, 2011.
WILKISTER MAGANGI,
for Director-General, MR8247465 National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
13758
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- WILKISTER MAGANGI
- Title
- for Director-General, MR8247465 National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 28th October 2011
- Page
- 63
- Extraction Method
- regex
Source Gazette
Vol. CXIII No. 106
Published 28th October 2011