GAZETTE NOTICE NO. 13428
GAZETTE NOTICE NO. 13428
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of Environmental (Imp act
Assessment and Audit) Regulations, the National Environment
Management Authority, (NEMA) has received an environmental impact assessment study report for the construction of the proposed proposed expansion works for Eldoret water treatment plant and transmission mains extension.
The proposed project is part of the water and sanitation improvement program, which has the following objectives:
28th October, 2011 THE KENYA GAZETTE
• Expansion of the existing Chebara water treatment Plant to increase gross treatment capacity from the present 19,000m3/d to utilize the ultimate abstraction capacity of the existing
Moiben Dam, i.e. 28,300m3/d @ 98% probability Safe Yield;
• Extension of Water Supply to Chebara and Chebiemit Trading
Centres which are located adjacent to the existing Moiben Dam and Chebara Treatment Works;
• Extension of Transmission and Distribution Mains in Eldoret town.
The proposed project is in Eldoret Municipality is situated in the
Uasin Gishu District of the Rift Valley Province in Western Kenya.
The following are the anticipated impacts and proposed mitigation measures:
Environmental issue Mitigation Measures
Vibration, Noise, air pollution and dust generation by traffic and machinery during construction
Strict control under construction contract to limit these impacts to acceptable levels
Watering to be enforced to keep dust levels low
Exercise shall be carried during normal working hours
Set and enforce speed limits for construction vehicles
Loss of some flora and fauna in the Treatment
Works and Storage
Tank construction sites and along routes of pipelines
Habitat loss will be minimized and monitored.
Where possible, no trees will be removed.
Replanting with indigenous plants and trees to be implemented where possible once construction is completed.
Increased soil erosion in the steeper areas within the construction sites and pipeline routes
Soil erosion induced by excavation activities to be reduced by sowing of grass.
Steep slopes at the treatment works site to be protected by technical measures e.g. gabions.
Shoring and support to be provided for deep pipeline trenches
Pollution by stored construction materials, oil, paints and other solid wastes
Strict control by Supervising Engineer to ensure acceptable storage practices
Wastes to be properly contained in designated areas on the sites prior to disposal
Wastes to be regularly cleared from site and disposed of in approved manner
Staff to be regularly trained and sensitized on appropriate waste management
Disposal of excavated material for structures and pipes
Excavations to be reinstated to original condition as provided for under the contract to achieve balanced cut and fill
Surplus material to be disposed of as directed e.g. in abandoned quarries
Workforce accidents by unsafe working practices
Periodic awareness workshops for workforce on safe working practices, Workers to be provided with proper protective safety kits.
Supervising Engineer to ensure the EMP is strictly followed
Strict control by Supervising Engineer to limit safety hazards
Pollution by Water
Treatment Chemicals
Storage and safety of workers
Dedicated storage area at Water
Treatment Works Site to be provided, with appropriate Personal and
(Environment) Protective Equipment
(PPE).
Public health risk and risk of pathogens for potential downstream users by effluent discharge
Downstream fencing of 100 m downstream from discharge point, provision of disinfecting facility, if found necessary.
Pollution by Disposal of
Chemical Sludge
Sludge to be dried on sludge drying beds.
Sludge from Chlorination and pH
Correction Tanks to be removed in Soak away Pits
All chemical sludge will be buried on site, and the pH of the soil monitored continuously.
There will be no disposal of sludge into the Moiben River.
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, the National Environment Management
Authority (NEMA), Popo Road, off Mombasa Road, P.O. Box
67839–00200, Nairobi.
(b) Permanent Secretary, Ministry of Environment and Mineral
Resources, N.H.I.F. Building, Community, P.O. Box 30521, Nairobi.
(c) Provincial Director of Environment, Ritf Valley Province
Province.
(d) District Environment Officer, Uasin Gishu District.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the approval process of the project.
WILKISTER MAGANGI , for Director-General, MR8247465 National Environment Management Authority.
Dated the 28th October, 2011.
WILKISTER MAGANGI,
for Director-General, MR8247465 National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
13428
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- WILKISTER MAGANGI
- Title
- for Director-General, MR8247465 National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 28th October 2011
- Page
- 60
- Extraction Method
- regex
Source Gazette
Vol. CXIII No. 106
Published 28th October 2011