Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 11222

GAZETTE NOTICE NO. 11222

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of Environmental (Impact Assessment and Audit) Regulations, the National Environment Management Authority, (NEMA) has received an environmental impact assessment study report for the implementation of the proposed seismic survey for blocks L 10A & 10B. The proponent proposes to conduct an offshore two dimensional (2-D) and three dimensional (3-D) seismic survey programme in exploration blocks L-10A and L-1OB off the Kenyan coast. The seismic survey programme will be undertaken to help determine whether there may be commercial deposits of oil and gas that can be produced from these two blocks. The L-10A and L-10B Blocks are located offshore Mombasa in the south of Kenya, and adjoin Kenya’s marine border with Tanzania .The southern block L-10B is approximately 20 km north of Pemba Island, Tanzania. The following are the anticipated impacts and proposed mitigation measures: Environmental issue Mitigation Measures Mortality of cetacean or Implement the Marine Mammals permanent damage to hearing and other sensitive parts. Disruption to sensitive cetacean from introduction of submarine noise which could interfere with echo-location, feeding, communication and other behaviour. Management Plan which is to include: Baseline surveys Avoidance of key periods in the life cycle of some of the species Surveillance throughout seismic activities Use of suitably trained marine mammal observers (MMOs). soft starts with shut down if animals observed within close range (i.e. less than 500 m) Direct physical contact with cetaceans by passing streamer, tail buoy or air guns and/or impact cetaceans from contact with hull or propellers Implement the Marine Mammals Management Plan specifically: Surveillance throughout seismic activities Towed passive acoustics Shut down if animals observed within close range (i.e. less than 500 m) Impact to cetaceans from accidental oil spill. Implement contractor Fuel Management Plan which will include details of refuelling procedures in port and bunkering operations at sea Disruption to sensitive turtles from introduction of submarine noise Implement the Marine Mammals Management Plan which will adequately address concerns over impacts to turtles. Direct physical contact with turtles by passing streamer, tail buoy or air guns, hull or propellers Observation of turtles and reporting of any impacts by MMO. If entanglement occurs with the equipment review design to assess whether modification can be made to reduce the risk of entanglement. Potential impact to turtles from accidental oil spill. Potential damage to corals from accidental oil spill or wastewater discharges Implement contractor Fuel Management Plan which will include details of refuelling procedures in port and bunkering operations at sea. Physical damage to corals from the streamers or tail buoy if sections are lost during operations Controlled through the Contractor’s Streamer Recovery Plan. This plan will detail the response procedures for finding and recovering a lost streamer and prevent it impacting any coast fishers or coral reefs. Degradation of marine water quality from discharge of macerated food and effluent Implement wastewater and waste management plans which comply with MARPOL 73/78 (including Regulation 8(1) (b) of Annex IV on Sewage and putrescible wastes disposal). Degradation of marine water quality from accidental oil spill Implement Fuel Management Plan which will include details of refuelling procedures in port and bunkering operations at sea. Disruption to fishing activities by damage to vessels or fishing equipment if tangled in streamer cable, tail buoy or air guns Implement Community Consultation Plan to ensure that fishers avoid the areas of operation and ensure that boat has procedures to spot and communicate with any fishers that it encounters. During consultation provide clear explanation of how Grievance Mechanism will be implemented. Interruption to fishing, shipping and recreational activities during seismic survey operations Implement Community Consultation Plan, which includes a Grievance Mechanism, to inform the fishers as to when the survey operations will be undertaken and where so as to ensure that fishers avoid the areas of operation THE KENYA GAZETTE 9th September, 2011 3472 3472 (particularly the 2D survey area). Community Consultation will identify the most efficient communication mechanisms for this information. Ensure that the support vessels for the seismic operations will have qualified staff on board who will be responsible for implementing procedures to take fishers out of the area if any are spotted and ensure that communications with the any fishers that are encountered are in the local language. Potential accidental oil spill impacting fish Contractor Fuel Management Plan which will include details of refuelling procedures in port and bunkering operations at sea. Perceived/actual loss of livelihood. Implement Community Consultation Plan, which includes a Grievance Mechanism, to inform the fishers as to when the survey operations will be being undertaken and where so as to ensure that fishers avoid the areas of operation (particularly the 2D survey area). The full report of the proposed project is available for inspection during working hours at: (a) Director-General, the National Environment Management Authority (NEMA), Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (b) Permanent Secretary, Ministry of Environment and Mineral Resources, N.H.I.F. Building, Community, P.O. Box 30521, Nairobi. (c) Provincial Director of Environment, Coast Province. (d) District Environment Officer, Mombasa District. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the approval process of the project. Z. O. OUMA, for Director-General, MR8054810 National Environment Management Authority.

Dated the 9th September, 2011.

Z. O. OUMA,

for Director-General, MR8054810 National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

11222

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
Z. O. OUMA
Title
for Director-General, MR8054810 National Environment Management Authority
Date Signed
9th September 2011
Page
67
Extraction Method
regex