GAZETTE NOTICE NO. 6970
GAZETTE NOTICE NO. 6970
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of Environmental (Impact
Assessment and Audit) Regulations, the National Environment
Management Authority, (NEMA) has received an environmental impact assessment study report for the implementation of the proposed
Kilimanjaro Community Trust Fence.
The proposed development involves laying down five strands wire, whereby three will be live wires and two earth wires. The fence shall cover a distance of 25 kilometres in total.
The proposed fence shall extend from the southern end of the existing Kimama fence running at the lower edge of the Loitoktok farmland and ends near the International boundary of Kenya and
Tanzania making a length of 25 km. The Kilimanjaro community fence is located in Kajiado South Division, Rift Valley Province.
The following are the anticipated impacts and proposed mitigation measures.
Possible Environmental
Impacts
Suggested Mitigation Measures
Loss of vegetation Restrict clearing only to fence alignment section.
Use some trees which falls under fence line as posts.
Vegetation trampling Fence line to follow park-community land boundary as much as is possible.
Vegetation degradation due to restricted animal movement
Drive or walk along designated tracks.
Scientific management of the mega herbivores in the park.
Loss of soil micro organism
Human labor to be used during clearance, transportation of materials to site and installation.
Avoid use of heavy machineries.
Bar elephants access to watering points and salt licks
Provide alternative watering points and salt lick supplements.
Soil erosion Human labor to be used during clearance, transportation of materials to site and installation.
Allow regeneration of graminoid layer along the fence line after installation to cover the soil.
Soil compaction Minimized use of heavy vehicles for poles transportation.
Human labor to be used as much as is possible.
Air pollution and vegetation destruction
Pole treatment done outside the national park area and far from human settlements.
Choice of pole treatment area to be relatively open and void of important plant species.
Appropriate disposal of the treatment oil and chemicals.
Increased solid waste
(from the construction and implementing team)
Appropriate waste material disposal methods to be employed; bins to be used and later disposed to designated municipal disposal sites.
Cleared trees and construction material remnant.
Cleared trees and shrubs to be disposed as firewood and logs using the existing
Park Department legal procedures.
Possible Environmental
Impacts
Suggested Mitigation Measures
Fence vandalism by Establish community park policing.
poachers
Increase community conservation education awareness.
Establish alternative income generating projects that are conservation compatible to reduce dependency on the park resources.
Enhance the existing conservation compatible community projects.
Encourage community subsistence agriculture.
Electric shock Sensitization and creation of awareness.
Fence destruction source of park fire
Fix lightning arrestors strategically.
Regular maintain the fence maintenance track to act as fire break.
Skin injuries from fallen nails or wires and tree stumps
Awareness and proper advice to those involved.
Workers should not walk bare-footed during clearance and fence construction.
Provide protective working gears.
Provision of First aid kits whenever work is in progress.
Falling injuries in the dug post holes
No holes should be left dug overnight.
Workers advised on taking safety precautions.
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, the National Environment Management
Authority (NEMA), Popo Road, off Mombasa Road, P.O. Box
67839–00200, Nairobi.
(b) Permanent Secretary, Ministry of Environment and Mineral
Resources, N.H.I.F. Building, Community, P.O. Box 30521, Nairobi.
(c) Provincial Director of Environment, Rift Valley Province.
(d) District Environment Officer, Kajiado District.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the approval process of the project.
B. M. LANGWEN, for Director-General, MR7362441 National Environment Management Authority.
Dated the 24th June, 2011.
B. M. LANGWEN,
for Director-General, MR7362441 National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
6970
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- B. M. LANGWEN
- Title
- for Director-General, MR7362441 National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 24th June 2011
- Page
- 53
- Extraction Method
- regex
Source Gazette
Vol. CXIII No. 57
Published 24th June 2011