Back
EXTENSION
100% confidence
via regex
GAZETTE NOTICE NO. 5581
GAZETTE NOTICE NO. 5581
THE WATER ACT
(No. 8 of 2002)
EXTENSION
SANITATION COMPANY
WATER Services Regulatory Board (WASREB) has approved proposed water and sanitation tariffs for implementation by Kirinyaga
Water and Sanitation Company (KIRIWASCO) in line with Section73
(5) of the Water Act 2002.
By extension therefore, Tana Water Services Board (TWSB) gives a two months notice to all existing and potential water and sewerage customers of KIRIWASCO and its environs that the tariffs have been adjusted as per the Service Provision Agreement between TWSB and
KIRIWASCO as approved by WASREB.
APPROVED WATER TARIFFS
Tariff Structure for the Period 2011/2012
Customer Category Consumption block
(M
)
Approved Tariff
(Kshs/(M
)
Unmetered connection
Flat rate
500.00/Month
Domestic /
Residential
0-6 33.33
6-20 50.00
21-50 65.00
51-100 80.00
101-300 100.00
>300 130.00
Commercial
Unmetered connection Flat rate 500.00/Month
0-6 33.33
6-20. 50.00
21-50 65.00
51-100 80.00
101-300 100 .00
>300 130.00
Schools/Colleges
<600 50.00
600<1200 65.00
>1200 90.00
Water Kiosks 35.00
Tariff Structure for the Period 2012-2013
Customer Category Consumption block
(M
)
Approved Tariff
(Kshs/(M
)
Unmetered connection
Flat rate
500.00/Month
Domestic /
Residential
0-6 33.33
6-20 50.00
21-50 65.00
51-100 80.00
101-300 100.00
>300 130.00
Commercial
Consumption Block
( M
)
Unmetered connection
Flat rate
500.00/Month
0-6 33.33
6-20. 50.00
21-50 65.00
51-100 80.00
101-300 100.00
>300 130.00
Schools/Colleges <600 50.00
600<1200 65.00
>1200 90.00
Water Kiosks 35.00
Miscellaneous Charges
Meter Rent per Month
Meter size Approved Kshs
½ inches 50
Meter size Approved Kshs
¾ inches 50
1 inch 250
1 ½ inches 250
2 inches 250
3 inches 450
4 inches 800
Refundable Deposits
Category of Consumer Approved (Kshs)
Domestic 2,500
Retail shops more than 10m
3,000
Bar, restaurants more than 15m
5,000
Hotel class ―A‖ and ― B‖ less than
150m
10,000
Hotel class ―c‖ and ―d‖ more than
150m
20,000
Hospitals more than 150m
20,000
Health centres less than 150m
10,000
Schools and other institutions more than 200m
20,000
Schools less than 200m
10,000
Minor construction sites more than
200m
15,000
Major Construction sites more than
300m
50,000
Light industrial between 200m
30,000
Medium industrial between 200m and
300m
50,000
Heavy industries more than 200m
100,000
Application for commercial construction must be accompanied by approved building plan and a copy of the lease/title deed.
Other Charge
Service Type Approved (Kshs)
Connection fee ½ to 1 inch 2,500
Connection fee 1.5 inch to 3 inches
7,500
Connection fee above 3 inches 15,000
Reconnection fee – normal
500.00 and double deposit for every default up to a maximum
2.5 times of your bill
Reconnection fee- at mains
5,000 and double deposit or the cost of reconnection whichever is higher
Illegal connection –
Commercial, Industry, Construction(fraud)
15,000 and double deposit
Illegal connection(fraud) –
Domestic
15,000 and double deposit
Tanker – 8000 litres
2,500 per tanker supplied within the KIRIWASCO area of supply
Replacement of stolen or damaged meters
100% of the market cost of the meter
Meter testing on request 500
Sale of cubic Meter of water 100
M. M. NAIVASHA, Chief Executive Officer, Tana Water Services Board (TWSB).
Approved by:
ROBERT GAKUBIA, Chief Executive Officer, MR1944290 Water Services Regulatory Board (WASREB).
20th May, 2011 THE KENYA GAZETTE 1525
Dated the 20th May, 2011.
ROBERT GAKUBIA,
Chief Executive Officer, MR1944290 Water Services Regulatory Board (WASREB).
Extracted Entities (1)
previous_gazette_ref
5581
Details
- Act / Legislation
- THE WATER ACT
- Reference
- No. 8 of 2002
- Signed By
- ROBERT GAKUBIA
- Title
- Chief Executive Officer, MR1944290 Water Services Regulatory Board (WASREB)
- Date Signed
- 20th May 2011
- Page
- 49
- Extraction Method
- regex
Source Gazette
Vol. CXIII No. 46
Published 20th May 2011