GAZETTE NOTICE NO. 5345

GAZETTE NOTICE NO. 5345

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


Pursuant to regulation 21 of Environmental (Impact Assessment and Audit regulations, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment study report for the implementation of the proposed filling station. The project will involve the construction of a filling station comprising of ; 3 dispensing pumps (1 for petrol, 1 for diesel and 1 for kerosine), 3 udergrond storage tanks, a canopy, tire centre, office block (lubricants shop, reception, office and toilets). The proposed project will be located along Nakuru –Kericho Highway at a place called Chesinende on l.r no kericho/chesinende/234 in kipkerion division, kericho district The following are the anticipated impacts and proposed mitigation measures; Potential Impact Mitigation measures Waste generation and disposal  Solid waste should be managed according to the waste management regulations.  The proponent should contract a licensed waste collector. Air and Noise pollution  Contractor will give prior notice of activities and time durations to neighboring building occupants.  Dust masks should be provided to workers to limit inhalation of the dust.  Switch off engines when not being used  Most of the construction work to be done manually to reduce noise impact  Fencing the site to avoid spread of dust  Employees likely to be exposed to high noise levels to be provided with ear protectors  The contractor should obtain a noise permit from NEMA.  Measures will be put in place to ensure use of serviced and greased equipment and earmuffs by operators  Sprinkle water on dusty surfaces  Place the concrete in well ventilated area  Ensure the workers wear proper PPEs (including dust masks) Accidents  Workers should be provided with the necessary PPEs such as helmets  Warning signs should be provided at the site warning people of potential/possible accidents.  Materials like iron bars should be properly lowered and not thrown or shot down from heights liable to cause damage, harm or injury to workers or passers-by. Blockage of storm drainage system  Ensure that storm drainage system remains clear during construction  Soil from the site which is not in use should be properly disposed Potential Impact Mitigation measures Noise and vibrations  Construction activities must be carried between 0800hrs and 1700hrs.  Use light vibrators  Regular servicing of machines and equipment  Lubrication of machines  Compliance with noise and Vibration regulations Occupational health and safety  Provision of PPEs to workers during construction time  The PPEs should include Overalls/Aprons, helmet, dust masks, wielding shield/goggles, ear muffs or plugs (where necessary), and appropriate footwear  Provide first aid facilities emergency plan at the site  Fencing off the developing project to avoid risks to the general public  Supervision of the project should be done throughout the project implementation period Fire risks  Install fire extinguishers at the filling station  Clearly mark fire exit points and the fire assembly area  Provide sand buckets at strategic locations  Workers should be trained on fire fighting skills by a  qualified trainer  Fire drills should be conducted at least once a year  A fire fighting team should be established  Warning and informational signs should be displayed appropriately  Conduct fire audit once a year  Formulate and bring to the notice of all workers and clients fire safety policy and rules  Regular testing and servicing of fire-fighting equipment and appliances.  Full compliance with the Fire Risk reduction Rules, 2007 Oil spills  Pumps should be inspected regularly  Pump valves should be well fitted  Dispenser pipes and underground tanks should be of approved quality standard  Regular monitoring to detect leakages from tanks and pipes  Install an oil interceptor in the drainage system  Recovery of waste oil for proper disposal by authorized agent  Use oil absorbent material to clean oil spills especially at the service bay  Regular checking/monitoring of the drainage lines, interceptor and the water pump to ensure that are working effectively without any overflow or failures.  Ensure that the underground tanks are compliant with Kenya standards (KS2000:2002)  Conduct pressure tests before commissioning of the station to ensure that the product lines (pipe works) comply with KS 1969:2006, KS 1967: 2006 and 1968:2006. Solid waste management  Provision of rubbish bins. Potential Impact Mitigation measures  Segregation of wastes at the source  Waste should be disposed at the designated site  Solid waste should be managed according to the waste management regulations.  The proponent should contract a licensed waste collector. Liquid waste management  Maintain cess pit; dispose of sludge by NEMA licensed companies.  Ensure manhole lid is always closed.  Conduct careful analysis of soils and subsurface geology and incorporate correct placement to avoid ground water contamination  provision of a reliable water supply The full report of the proposed project is available for inspection during working hours at: (a) Director-General, the National Environment Management Authority (NEMA), Kapiti Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (b) Permanent Secretary, Ministry of Environment and Mineral Resources, N.H.I.F. Community, P.O. Box 30521, Nairobi. (c) Provincial Director of Environment, Rift Valley Province. (d) District Environment Officer, Kericho District. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, NEMA, to assist the Authority in the approval process of the project. B. M. LANGWEN, for Director-General, MR1944132 National Environment Management Authority.

Dated the 20th May, 2011.

B. M. LANGWEN,

for Director-General, MR1944132 National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

5345

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
B. M. LANGWEN
Title
for Director-General, MR1944132 National Environment Management Authority
Date Signed
20th May 2011