GAZETTE NOTICE NO. 5345
GAZETTE NOTICE NO. 5345
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
Pursuant to regulation 21 of Environmental (Impact Assessment and Audit regulations, the National Environment Management
Authority (NEMA) has received an Environmental Impact Assessment study report for the implementation of the proposed filling station.
The project will involve the construction of a filling station comprising of ; 3 dispensing pumps (1 for petrol, 1 for diesel and 1 for kerosine), 3 udergrond storage tanks, a canopy, tire centre, office block
(lubricants shop, reception, office and toilets).
The proposed project will be located along Nakuru –Kericho
Highway at a place called Chesinende on l.r no kericho/chesinende/234 in kipkerion division, kericho district
The following are the anticipated impacts and proposed mitigation measures;
Potential Impact Mitigation measures
Waste generation and disposal
Solid waste should be managed according to the waste management regulations.
The proponent should contract a licensed waste collector.
Air and Noise pollution
Contractor will give prior notice of activities and time durations to neighboring building occupants.
Dust masks should be provided to workers to limit inhalation of the dust.
Switch off engines when not being used
Most of the construction work to be done manually to reduce noise impact
Fencing the site to avoid spread of dust
Employees likely to be exposed to high noise levels to be provided with ear protectors
The contractor should obtain a noise permit from NEMA.
Measures will be put in place to ensure use of serviced and greased equipment and earmuffs by operators
Sprinkle water on dusty surfaces
Place the concrete in well ventilated area
Ensure the workers wear proper PPEs
(including dust masks)
Accidents Workers should be provided with the necessary PPEs such as helmets
Warning signs should be provided at the site warning people of potential/possible accidents.
Materials like iron bars should be properly lowered and not thrown or shot down from heights liable to cause damage, harm or injury to workers or passers-by.
Blockage of storm drainage system
Ensure that storm drainage system remains clear during construction
Soil from the site which is not in use should be properly disposed
Noise and vibrations
Construction activities must be carried between 0800hrs and 1700hrs.
Use light vibrators
Regular servicing of machines and equipment
Lubrication of machines
Compliance with noise and Vibration regulations
Occupational health and safety
Provision of PPEs to workers during construction time
The PPEs should include
Overalls/Aprons, helmet, dust masks, wielding shield/goggles, ear muffs or plugs (where necessary), and appropriate footwear
Provide first aid facilities emergency plan at the site
Fencing off the developing project to avoid risks to the general public
Supervision of the project should be done throughout the project implementation period
Fire risks Install fire extinguishers at the filling station
Clearly mark fire exit points and the fire assembly area
Provide sand buckets at strategic locations
Workers should be trained on fire fighting skills by a qualified trainer
Fire drills should be conducted at least once a year
A fire fighting team should be established
Warning and informational signs should be displayed appropriately
Conduct fire audit once a year
Formulate and bring to the notice of all workers and clients fire safety policy and rules
Regular testing and servicing of fire-fighting equipment and appliances.
Full compliance with the Fire Risk reduction
Rules, 2007
Oil spills Pumps should be inspected regularly
Pump valves should be well fitted
Dispenser pipes and underground tanks should be of approved quality standard
Regular monitoring to detect leakages from tanks and pipes
Install an oil interceptor in the drainage system
Recovery of waste oil for proper disposal by authorized agent
Use oil absorbent material to clean oil spills especially at the service bay
Regular checking/monitoring of the drainage lines, interceptor and the water pump to ensure that are working effectively without any overflow or failures.
Ensure that the underground tanks are compliant with Kenya standards
(KS2000:2002)
Conduct pressure tests before commissioning of the station to ensure that the product lines
(pipe works) comply with KS 1969:2006, KS
1967: 2006 and 1968:2006.
Solid waste management
Provision of rubbish bins
Segregation of wastes at the source
Waste should be disposed at the designated site
Solid waste should be managed according to the waste management regulations.
The proponent should contract a licensed waste collector.
Liquid waste management
Maintain cess pit; dispose of sludge by
NEMA licensed companies.
Ensure manhole lid is always closed.
Conduct careful analysis of soils and subsurface geology and incorporate correct placement to avoid ground water contamination provision of a reliable water supply
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, the National Environment Management
Authority (NEMA), Kapiti Road, off Mombasa Road, P.O.
Box 67839–00200, Nairobi.
(b) Permanent Secretary, Ministry of Environment and Mineral
Resources, N.H.I.F. Community, P.O. Box 30521, Nairobi.
(c) Provincial Director of Environment, Rift Valley Province.
(d) District Environment Officer, Kericho District.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the approval process of the project.
B. M. LANGWEN, for Director-General, MR1944132 National Environment Management Authority.
Dated the 13th May, 2011.
B. M. LANGWEN,
for Director-General, MR1944132 National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
5345
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- B. M. LANGWEN
- Title
- for Director-General, MR1944132 National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 13th May 2011
- Page
- 47
- Extraction Method
- regex
Source Gazette
Vol. CXIII No. 44
Published 13th May 2011