GAZETTE NOTICE NO. 4930
GAZETTE NOTICE NO. 4930
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
Pursuant to regulation 21 of Environmental (Impact Assessment and Audit) regulations, the National Environmental Management
Authority (NEMA) has received an Environmental Impact Assessment
Study Report for the implementation of the proposed upgrade of a petrol station.
The proposed project entails repairing the canopy over the pumps, the sales office, rehabilitating the drainage system, replacing the underground fuel tanks, repairing the drive ways, walkways, acceleration and deceleration lanes, repairing the Interceptor Tank and the washrooms.
The project is located on plot No. Ngenda/Kimunyu/997 at
Ichaweri next to the entrance to the late Hon. Jomo Kenyatta‘s home.
It is along Kenyatta road 3.5Km to Gatundu Town. The property is approx. 1Km from Mutomo Market and owned by Hon. Mama Ngina
Kenyatta. The plot has structures that will be renovated, repaired and some upgraded to meet the site engineers specifications to support the petrol station operations. The entire plot measures approx. 19.13Acres.
The following are the anticipated impacts and proposed mitigation measures:
Possible Impact Mitigation measures
Air pollution
Control speed and operation of construction vehicles.
Prohibit idling of vehicles.
Spray water on excavated areas.
Maintenance of construction plant and equipment.
Sensitize construction workers.
All bare areas should be landscaped after construction.
Workers should be provided with dust masks if working in sensitive areas.
Noise pollution Maintain plant equipment.
Construction should be carried out only during daytime i.e 0800 – 1700 HRS.
Workers to wear ear muffs if working in noisy section.
Management to ensure that noise from the station is kept within reasonable levels.
6th May, 2011 THE KENYA GAZETTE 1391
Possible Impact Mitigation measures
Traffic density Proper signage put in place to notify neighbours of the activity and presence of heavy vehicles and to direct traffic.
Presence of boards directing patrons to the site.
Strict adherence to traffic rules.
Soil erosion and compaction
Provide soils conservation structures on the areas prone to soil erosion to reduce impact of erosion.
There should be designated pathways and driveways for movement to avoid unnecessary compaction.
All bare areas should be well landscaped after completion.
Solid waste Construction debris should be collected by a licensed private contracted waste collection company.
Excavation waste should be re-used or backfilled.
Waste generated should be collected by a privately contracted waste collection company and the contractor should ensure the construction of a central waste collection point with bulk storage facilities.
The site should have waste receptacles with bulk storage facilities at convenient points to prevent littering during occupation
Oil leaks and spills
Machinery should be well maintained to prevent oil leaks.
Contractor should have a designated area where maintenance is carried out and that is protected from rain water.
All oil products should be stored in a site store and handled carefully.
Loss of vegetation
Designate access pedestrian routes and parking zones that are cabro paved
Provide signs marked do not Walk/ Park on the grass.
The flora and fauna should be restored after construction by landscaping and maintaining the introduced plants.
Occupational
Health and
Safety
Provide Personal Protective Equipment.
Train workers on personal safety and how to handle equipments and machines.
Report any accidents / incidences and treat and compensate affected workers.
Provide sufficient and suitable sanitary conveniences which should be kept clean.
The site will be fenced off using iron sheets during renovation.
Security
The site will be fenced off using iron sheets during renovation.
Demolish all temporary kiosks on site.
Round the clock security for the facility.
Adequate lighting and an alarm system installed at strategic points.
Ecological considerations
(flora & fauna)
The flora and fauna should be restored after construction by landscaping and maintaining the introduced plants.
Possible Impact Mitigation measures
Fire preparedness Fire fighting drills carried out regularly.
Fire fighting emergency response plan.
Ensure all firefighting equipment is regularly maintained, serviced and inspected.
Fire hazard signs and directions to emergency exit, route to follow and assembly point in case of any fire incidence.
The full report of the proposed project is available for inspection during working hours at:
(e) Director-General, the National Environment Management
Authority (NEMA), Kapiti Road, off Mombasa Road, P.O.
Box 67839–00200, Nairobi.
(f) Permanent Secretary, Ministry of Environment and Mineral
Resources, N.H.I.F. Community, P.O. Box 30521, Nairobi.
(g) Provincial Director of Environment, Central Province.
(h) District Environment Officer, Thika District.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the approval process of the project.
B. M. LANGWEN, for Director-General, MR1681643 National Environment Management Authority.
Dated the 6th May, 2011.
B. M. LANGWEN,
for Director-General, MR1681643 National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
4930
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- B. M. LANGWEN
- Title
- for Director-General, MR1681643 National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 6th May 2011
- Page
- 30
- Extraction Method
- regex
Source Gazette
Vol. CXIII No. 41
Published 15th February 2005