Back
NOTIFICATION
100% confidence
via regex
GAZETTE NOTICE NO. 1248
GAZETTE NOTICE NO. 1248
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
NOTIFICATION
PURSUANT to regulation 21 of Environmental (Impact
Assessment and Audit) Regulations, the National Environment
Management Authority, (NEMA) has received an environmental impact assessment study report for the implementation of the proposed
LPG filling plant.
The proposed project involves the installation of 1No. storage tank and a cylinder filling shed.
The LPG filling plant will be located off Athi River–Namanga
Road, in Kitengela area, Kajiado District. The site is on L.R. No.
Noonkopir trading centre/429.
The following are the anticipated impacts and proposed mitigation measures.
Anticipated Impacts Proposed Mitigation Measures
Changes in hydrology/impended drainage
Proper installation of drainage structures.
Install cascades to break the impact of water flowing in the drains.
Ensure efficiency of drainage structures through proper design and maintenance.
Provide gratings to the drainage channels.
Regular checks on any sludge along drainage channels.
Visual checks of oil interceptors and drainage channels for any leaks.
Soil erosion Control any earthworks.
Rehabilitate degraded environment to avoid siltation and wash offs.
Compact loose soils.
Landscaping.
Ensure management of excavation activities.
Control activities especially during rainy conditions.
Provide soil erosion control and conservation structures where necessary.
Proper disposal of excavated loose soil
(black cotton soil).
Air pollution through dust and gaseous emissions
Prohibit idling vehicles.
Water should be sprayed during the construction phase of excavated areas.
Regular maintenance of construction plant and equipment.
Engage sensitive construction workers.
Proper use of PPEs.
Maintain plant equipment (if present/used).
Construction activities to be restricted to daytime.
Workers in vicinity of or involved in high level noise to wear respective safety and protective gear i.e. earplugs and earmuffs.
Appropriate selection of machinery.
Oil pollution Proper storage, handling and disposal of new oil and used oil and related wastes.
Maintain plant and equipment to avoid leaks.
Provide oil interceptors along the drains leading from LPG filling area.
Water resource Management of water usage.
Recycling of water at the construction phase where possible.
Use of water conservation signs at the wash rooms and install water conserving taps.
Public health and occupational safety
Ensure proper solid waste disposal and collection facilities.
Ensure effective wastewater management.
4th February, 2011 THE KENYA GAZETTE 379
Anticipated Impacts Proposed Mitigation Measures
Design of sewerage system should be as provided in the plans.
Provide First Aid kits on the site.
Sensitize residents/workers on environmental management.
Ensure there is no poding to eliminate breading of mosquitoes during construction.
Workers should be trained on occupational health and safety and First
Aid administration.
Vegetation Landscaping and planting all disturbed areas.
Planting flowers/grassing should be done just before the rains or irrigated on dry spells.
Fire safety training/emergency response procedures
(ERPs)
To enhance health and safety preparedness among stakeholders.
Ensure equipment is in good working condition.
Put up emergency response contacts.
Put up ERP notification instructions.
Put up simple instructions on how to handle fires, product spills, LPG incidents, armed robbery and product contaminations.
Fire outbreak Install fire-fighting equipment as provided by County Council fire department.
Sensitize the residents on fire risks, i.e.
conduct regular fire drills.
Adapt effective emergency response plans.
Provide emergency numbers at strategic points.
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, the National Environment Management
Authority (NEMA), Kapiti Road, off Mombasa Road, P.O.
Box 67839–00200, Nairobi.
(b) Permanent Secretary, Ministry of Environment and Mineral
Resources, N.H.I.F. Community, P.O. Box 30521, Nairobi.
(c) Provincial Director of Environment, Rift Valley Province.
(d) District Environment Officer, Kajiado.
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the approval process of the project.
A. M. KARIUKI, for Director-General, MR1232073 National Environment Management Authority.
Dated the 4th February, 2011.
A. M. KARIUKI,
for Director-General, MR1232073 National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
1248
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- A. M. KARIUKI
- Title
- for Director-General, MR1232073 National Environment Management Authority
- Ministry
- Ministry of Environment And Mineral
- Date Signed
- 4th February 2011
- Page
- 52
- Extraction Method
- regex
Source Gazette
Vol. CXIII No. 12
Published 4th February 2011