Back
OTHER 74% confidence via regex

GAZETTE NOTICE NO. 1039

PURSUANT to clause 1 of part III of the Schedule of Tariffs 2008, notice is given that all prices for electrical energy specified in part II of the said schedule were liable to a fuel cost charge of plus 418 cents per kWh. for all meter readings taken in December, 2010. Information used to calculate the fuel cost charge: Power Station Fuel Price in Sh./Kg. (Ci) November, 2010 Fuel Displacement Charge November, 2010 Sh./kWh. Variation from October, 2010 Prices Increase/(Decrease) Units in November, 2010 in kWh. (Gi) Kipevu I Diesel 43.12 (2.48) 18,822,000 Kipevu II Diesel Plant (Tsavo) 41.97 (0.30) 34,794,1000 Kipevu Gas Turbine I & II — — — Rabai Diesel (With Steam Unit) 53.10 2.75 35,901,000 Iberafrica Diesel 51.08 (0.51) 28,152,171 Iberafrica Diesel–Additional Plant 50.97 (0.46) 32,081,1000 Mumias Sugar Company 2.74 — 8,494,000 Orpower4 3.22 0.30 29,269,880 UETCL Import 11.07 0.06 2,705,100 UETCL Export 11.07 0.06 (1,833,300) Emergency Power (Embakasi 4) 67.36 3.76 15,654,100 Emergency Power (Embakasi 5) 67.36 3.76 7,774,930 Garissa Diesel 73.86 (0.23) 1,330,746 Lamu Diesel 77.07 (4.13) 580,994 Lodwar Diesel 100.92 — 301,774 Mandera Diesel 109.70 0.93 335,402 Marsabit Diesel 95.76 4.76 207,470 Wajir Diesel 97.82 1.34 405,044 Moyale Diesel 101.66 — 139,286 Mpeketoni 97.85 1.91 110,845 Hola 97.01 — 115,579 Merti 99.63 1.93 12,303 Habaswein 95.97 4.31 45,038 Elwak 102.20 0.05 29,406 Baragoi 86.19 (3.75) 11,868 Total units generated and purchased including hydros, excluding export (G) = 604,466,790 kWh. L. K. NJAGI, Company Secretary.

Extracted Entities (1)

previous_gazette_ref

1039

Details

Signed By
L. K. NJAGI
Title
Company Secretary
Page
56
Extraction Method
regex