Back
REGULATION
100% confidence
via regex
GAZETTE NOTICE NO. 4894
GAZETTE NOTICE NO. 4894
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of the Environmental (Impact
Assessment and Audit) Regulations, the National Environment
Management Authority (NEMA) has received an environmental impact assessment study report for the implementation of proposed
AVIA Energy Limited.
The proposed project entails construction and utilization of bulk
LPG gas storage plant. The project is located on plot No. 209/12925, Mombasa Road, Nairobi.
The project anticipates the following impacts and mitigation measures.
Possible impacts Mitigation measures
1.Dust • Water sprinkling of the ground.
2.Noise • Restrict construction activities to day time hours.
3.Destruction of the physical' • Landscaping.
environment.
4.Health and safety hazards • Document emergency response procedures.
•Use of personal protective gear.
5.Contamination of water • Provision of sanitary facilities.
resources by sewage
6.Emission of particulate • Ensure there are no leaks in the pipe matter in the air network..
•Provide personal protective equipment to the staff.
7. Noise
• Implement a regular maintenance programme on equipment.
•Provision of personal protective gear, ear protectors to employees.
•Ensure that the noise levels are not beyond 90 decibels.
8. Contamination of soil and • Develop, rollout and implement a ground water soil and ground water protection protocol to ensure minimal impact to the sub .surface and groundwater.
This should include:
—Soil analysis and groundwater monitoring.
—Corrective action planning.
•Provide an oil interceptor, drainage system.
Possible impacts Mitigation measures
•Monitor the presence of BTEX and
TPH elements in the soil.
9. Hazardous waste
• Develop, rollout and implement a management hazardous waste management progrtname which should include:
—Waste characterization.
—Waste handling criteria.
—Performance evaluation.
—Documentation and reporting.
—Compliance.
—Waste management training.
The full report of the proposed project is available for inspection during working hours at:
(a) The Director-General, National Environment Management
' Authority, Kapiti Road, off Mombasa Road, P.O. Box
67839-00200, Nairobi.
(h) The Permanent Secretary, Ministry of Environment and
Natural Resources, National Hospital Insurance Fund
Building, Community, 4th Floor, P.O. Box 30521, Nairobi.
(c)Provincial Director of Environment, Nairobi Province.
(d)District Environment Officer, Nairobi East District.
The National Environment Management. Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, National Environment Management Authority, to assist the authority in the approval process of the project.
Dated the 19th May, 2008.
B. M. LANGWEN, for Director-General, National Environment Management Authority.
Dated the 19th May, 2008.
B. M. LANGWEN,
for Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
4894
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- B. M. LANGWEN
- Title
- for Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment
- Date Signed
- 19th May 2008
- Page
- 35
- Extraction Method
- regex
Source Gazette
Vol. CX No. 45
Published 6th June 2008