Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 3467

GAZETTE NOTICE NO. 3467

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of the Environmental (Impact Assessment and Audit) Regulations, the National Environment Management Authority (NEMA) has received an environmental impact assessment study report for the implementation of proposed road up-grading. The project anticipates the following impacts and mitigation measures. Possible impacts Mitigation measures 1. Human displacement from • The affected community members road reserves and should be informed early enough. diversions •Compensation to affected property on market rater or • otherwise mutually agreed. 2. Contamination of soil by • Vehicle, machinery and equipment fuels and lubricants. maintenance and refueling will be carried out so that spilled materials do not seep into soil. •Fuel storage and refilling areas will he located at least 300 metres from drainage strut:0es and important water bodies. •Oil traps will he provided lbr service areas, full station areas, parking areas and within drainage systems for bridges. 3. Degradation of borrow • All borrow/quarry areas will be • and quarry areas refilled, re-vegetated and landscaped. •Ilaphazard borrowing and quarrying should he avoided. •Degraded and barren areas, river beds and wetlands to he used fir borrowing material. •Land could . he selected through community consultation and sites subsequent developed into productive purposes. 2nd May, 2008 Possible impacts Mitigation measures 4. Contamination of water • Traps will be provided at fueling sources by points to prevent water •petrochemicals contamination. •Embankment slopes leading to water bodies will be modified and screened so that contaminated do not enter the water body. 5. Sanitation and water from • Side drains in settlement areas will workmen camps discharge through a primary setting tank mainly a septic tank •Camps will have on site sanitation facilities so that nb water pollution takes place. 6. Accidents during transport• Delivery of hazardous substances must be done under certification by respective departments according to Waste Regulations, 2006. •Such vehicles must be marked with appropriate signs in block capital with red print, plying during off-peak hours. •Any spillage' will be reported to respective agency, which will be responsible for contingency measures of cleaning the spill within shortest possible time. 7. HIV/AIDS and STIS • HIV/AIDS awareness creation to the workers. •Provision of VCT services in the nearby health centres. •Offer guidance and counseling to the workers. •Provide recreational facilities in the camps to occupy workers free time. •Provide condoms to the workers. •Provide ARVs to affected workers. The full report of the proposed project is available for inspection during working hours at : (a) The Director-General National Environment Management Authority, Kapiti Road, off Mombasa Road, P.O. Box 67839-00200, Nairobi. (h) The Permanent Secretary, Ministry of Environment and Natural Resources, National Hospital Insurance Fund Building, Community, 4th Floor, P.O. Box 30521, Nairobi. (c) District Environment Office, Wajir District. The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the, date of publication of this notice to the Director-General, National Environment Management Authority, to assist the authority in the approval process of the project. Dated the I 5th August, 2008. M. 0. MBEGERA. ' for Director-General, National Environment Management Authority.

Dated the 5th August, 2008.

30521,

Nairobi.

Extracted Entities (1)

previous_gazette_ref

3467

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
30521
Title
Nairobi
Date Signed
5th August 2008
Page
54
Extraction Method
regex