GAZETTE NOTICE NO. 3466
GAZETTE NOTICE NO. 3466
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of the Environmental (Impact
Assessment and Audit) Regulations, the National Environment
Management Authority (NEMA) ha's received an environmental impact assessment study report for the implementation of proposed up- grading of Outer Ring Road (C59).
The project is located on Outer Ring Road (C59).
The project anticipates the following Impacts and mitigation measures.
Possible impacts Mitigation measures
1. Land degradation and loss • Soil conservation measures.
of soil
•Rehabilitation of quarries and borrow pits stock pits and spoilt areas.
•Soil and grassing.
•Tree planting.
2. Water degradation and • Provision of portable water.
pollution
Water drainage structures.
Pollution control measures.
Management of waste water.
Dust control measures.
Tuning of machines and engines.
Noise control measures.
Maintenance of plant, equipment and vehicles.
Rehabilitation of quarrying and materials sites.
Sensitization programme
Compensation.
Sensitization of the local community.
•Appropriate compensation.
•Provide protective wear and gear.
8. Human health and disease • HIV/AIDS awareness prevention and HIV/AIDS and training.
•ProVision of potable water for 4 consumption.
•First Aid.
•Health clinic.
9. Road accidents and safety • Place proper road safety signs and measures.
•
•
•
3.Air pollution •
•
4.Noise pollution •
•
5.Loss and treat to •
Biodiversity
•
6.Loss of land •
7.Blasting nuisance and hazards
•
•Road education for the local community.
B. M. LANGWEN, for Director General
National Environment Management Authority.
•Enforcement of Traffic Act.
10. Generation of waste • Solid waste management.
25th April, 2008 THE KENYA GAZETTE 997
Passible impacts Mitigation measures
•Liquid waste management.
1 I. Scraps and other debris • Water management as a result of and spoil on site facility decommissioning.
•Demobilization.
•All buildings, machinery, equipment, structures and partitions that will not be used for other purposes must be removed and recycled or used say in other projects.
•Where recycling, reuse of the machinery, equipment, implements, structures, partitions and other demolition waste is not possible, the materials should be taken disposed in approved dumpsites.
The full report of the proposed project is available for inspection during working hours at:
(a) The Director-General National Environment Management
Authority, Kapiti Road, off Mombasa Road, P.O. Box
67839-00200, Nairobi.
(h) The Permanent Secretary, Ministry of Environment and
Natural Resources, National Hospital Insurance Fund
Building, Community, 4th Floor, P.O. Box 30521, Nairobi.
(•) The District Environment Office, Nairobi East Division.
The National Environment Management Authority invites members of the public to submit oral or written comments within sixty
(60) days from the date of publication of this notice to the Director-
General, National Environment Management Authority, to assist the authority in the approval process of the project.
Dated the 18th July, 2007.
M. 0. MBEGERA, for Director-General, National Environment Management Authority.
Dated the 18th July, 2008.
M. O. MBEGERA,
for Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
3466
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- M. O. MBEGERA
- Title
- for Director-General, National Environment Management Authority
- Ministry
- Ministry of Environment
- Date Signed
- 18th July 2008
- Page
- 72
- Extraction Method
- regex
Source Gazette
Vol. cx No. 36
Published 25th April 2008