Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 1507

GAZETTE NOTICE NO. 1507

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of the Environmental (Impact Assessment and Audit) Regulations, the National Environment. Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the implementation of proposed Cement Manufacture Company. The proposed project involves the mixing of the imported clinker with the correct amounts of gypsum, clay and pozzolona to produce cement. The project is to be located on L.R. No. 12648/15 and 12648/17, Machakos District, Athi River Division, Athi River. The project anticipates the following impacts and mitigation measures: Possible impacts Mitigation measures I "Noise Pollution • Working with noise abatement equipment. •Regular service of equipment. •Switch off vehicles engines when not in use. 2. Disposal of excavated soil and • All excavated areas to be properly soil and land degradation back-filled and compacted and revegetated. Number of complaints 6 3 2 Number of complaints 5 36 Number of complaints 10 19 7th March, 2008 THE KENYA GAZETTE 471 Possible impacts Mitigation measures 5.Health and safety concerns 6.Damage to public roads and pavements 7.Air quality • 3.Increase in ground water • pollution • 4.Sanitation • •Construction of conservation measures at the stock-piled sites. Apply ecological reshaping by filling holes, soil leveling and planting trees and grass around the construction blocks. Establish contingency measures measures to deal with spillages of oil and hazardous materials. Any disused burrow pits to be filled or drained. Use clean water treated from Mavoko Council and empty wastes into the COuncil's main pipes. •Where sewer not available, septic tanks and exhauster services should be used. •First aid box to be on site. •Provide and apply Material Safety Data Sheets (MSDA). •Provide personal protective equipments such as head gear, goggles, gas masks etc. •Install appropriate sizes of culverts and embankments to provide adequate drainage. •Use of covered/secure sheds for raw materials/product storage. •Install vibrating feeders under storage yard to reduce dust emissions. impact assessment study report for the implementation of proposed Tongwe Mara Camp on L.R. No. CIS Mara/Talek/96 at Narok. The proposed project will comprise of the construction of thirty (30) tented camp. The intake of the project is located outside the Maasai Mara Game Reserve, about 6 kilometres from the Talek Town, in Koiyaki Group Ranch, Narok Sotah District. The project anticipates the following impacts and mitigation measures: Mitigation measures •The proponent is entitled to apply for the waste disposal licences. •There will be need for stringent treatment of effluent. •Dust emissions during construction may be reduced using biodegradable hydrant and sprinkling of water on the surface. •Ensure minimal obstruction to storm water flow and prevent surface run-off from entering the sewers •Provide fixed and permanent monitoring points for sampling and install a gauging systetn for monitoring volumes of waste water. Possible impacts 1.Water quality 2.Air quality 3.Waste water collection The full report of the proposed project is available for inspection during working hours at: (a)Diiector General, National Environment Management Authority, Kapiti Road, off Mombasa Road. P.O .Box 67839-00200. Nairobi. (b)Permanent Secretary, Ministry of Environment and Natural Resources. N.H.I.F. Building. P.O. Box 30521, Nairobi. (c)Provincial Director of Environment, Eastern Province. (d)District Environment Officer, Machakos District. The. National Environment Management Authority, invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General. National Environment Management Authority. to assist the Authority in the approval process of the project. B. M. LANGWEN. for Director-General. National Environment Management Authority. GAzErni Now): No. 1739 THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT (No. 8 of 1999) THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED TONGWF. MARA CAMP ON L.R. NO. CIS MARA/TALEK/96 AT NAROK INvrrATioN OF Pt nLtc CONIMENTS PURSUANT to regulation 21 of the Environmental (Impact Assessment and Audit) Regulations. the National Environment Management Authority (NEM A) has received an environmental •Wastewater pre-treatment systems (if any) should be isolated and fenced off for restricted access. •Use of serviced and greased equipment to reduce noise. 4. Noise pollution •Ensure use of ear muffs by operators 5. Biological diversity • Lawns and gardens to be planted with diverse vegetation species. •The riparian strip will also be enriched with indigenous tree species. •Adhere to eco-tourism principles The full report of the proposed project is available for inspection during working hours at: (a)Director-General. National Environmental Management Authority, Kapiti Road, off Mombasa Road, P.O. Box 67839- 00200, Nairobi. (b)Permanent Secretary, Ministry of Environment and Natural Resources, N.H.I.F. Building, P.O. Box 30521, Nairobi. (c)Provincial Director of Environment, Rift Valley Province. (d)District Environment Officer, Narok North District. The National Environmental Management Authority, invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, National Environmental Management Authority, to assist the authority in the approval process of the project. B. M. LANGWEN, for Director-General, National Environment Management Authority. 472 THE KENYA GAZE I 1E 7th March, 2008

Dated the 7th March, 2008.

B. M. LANGWEN,

for Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

1507

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
B. M. LANGWEN
Title
for Director-General, National Environment Management Authority
Date Signed
7th March 2008
Page
42
Extraction Method
regex