Back
REGULATION 100% confidence via regex

GAZETTE NOTICE NO. 1263

GAZETTE NOTICE NO. 1263

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

REGULATION


PURSUANT to regulation 21 of the Environmental (Impact Assessment and Audit) Regulations, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the implementation of proposed development of residential houses. The proposed project consists of construction of three (3) modern villa houses on 0.1822 hectare plot. The project is to be located along Shanzu Road, off Lower Kabete •Estate, Kyuna Estate plot L. R. No. 7158/384. The project anticipates the following impacts and mitigation measures: Possible Impacts Mitigation Measures 1. Drainage system — Ensure that storm water drainages are separated from the public sewerage system. —Check points should be accessible for unblocking. —Install drainage systems properly to ensure the drainage are free from any blocking materials. —Ensure effective wastage management. 2. Surface run-off — Ensure that no wasted water is directed to surface run-off drainage. —Installation of oil/grease interceptors at appropriate points. —Ensure that no surface drains are connected into the public sewers. 3. Solid waste management —. Provide solid waste collectio facilities at strategic locations and provide solid waste segregation containers. —A selection yard should be slabbed and compartmented to provide space for every category of solid waste. —Contact the municipal council for site of disposal of the construction material remains. 4. Public and Occupational — Provide workers with appropriate health and safety protective clothing. —Provide workers with a we stocked first-aid kit. —Sensitive residents on fire risks. —Install and maintain fire-fighting equipment and machinery. 5. Air Dust and Noise pollution — Provide barriers' such as walls and trees around site boundaries to provide some buffer against noise propagation. —Use of ear protectors for the workers. —Construction activities to be restricted to the day time. —Sprinkle water to reduce dust. 6. Oil spills — Provide handling, storage and disposal of oil and oil wastes. —Provide oil interceptors along drains leading to car washes 7.Increase in traffic — Provide bill boards at the site/entrance to notify motorists in the area. 8.Destruction of the physical — Provide soil erosion control environment, soil erosion structures on the steep sides. —Control earth works, compact loose soils and ensure management of excavation activities. —Landscape properly the disturbed areas after completion of works. — Use indigenous trees to replant areas where vegetation is unnecessarily removed. The full report of the proposed project is available for inspection during working hours at: (a)Director-General, National Environment Management Authority, Kapiti Road, off Mombasa Road, P.O. Box 67839- 00200, Nairobi. (b)Permanent Secretary, Ministry of Environment and Natural Resources, N.H.I.F. Building, P.O. Box 30521, Nairobi, (c)Provincial Director of Environment, Nairobi Province. (d)District Environment Officer, Nairobi West District. The National Environment Management Authority, invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director-General, National Environment Management Authority, to assist the Authority in the approval process of the project. B. M. LANGWEN, for Director-Oeneral National Environment Management Authority.

Dated the 29th February, 2008.

B. M. LANGWEN,

for Director-Oeneral National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

1263

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Signed By
B. M. LANGWEN
Title
for Director-Oeneral National Environment Management Authority
Date Signed
29th February 2008
Page
39
Extraction Method
regex