Back
REGULATION
100% confidence
via regex
GAZETTE NOTICE NO. 1262
GAZETTE NOTICE NO. 1262
THE LOCAL GOVERNMENT ACT
(Cap. 265)
REGULATION
IN EXERCISE of the powers conferred by section 148 of the
Local Government Act, the County Council of Murang'a has, with the approval of the Minister for Local Government, adopted the following by-laws with effect from the date of this notice-
(a)The County Council of Murang'a (Taxi/Matatu/Minibus) by- laws, 2007.
(b)The County Council of Murang'a (Pertniting, Licensing and
Control of Sand Quarries and Minerals) By-laws, 2007, (c)The County Council of Murang'a (Single Business Permit) By- laws, 2007.
(d)The County Council of Murang'a (Commercial and Private
Schools) By-laws, 2007.
(e)The County Council of Murang'a (Mortuary) By-laws, 2007.
(f)The County Council of Murang'a (Barter Market) By-laws, 2007.
(g)The County Council of Murang'a (Produce Cess) By-laws, 2007.
Dated the 30th January, 2008.
1. N. GITHUI, Clerk to the Council.
GAZETTE NOTICE No, 1263
THE ENVIRONMENTAL MANAGEMENT AND
CO-ORDINATION ACT
(No. 8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY,, ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED DEVELOPMENT OF RESIDENTIAL
HOUSES ON PLOT L.R. NO. 7158/384 ALONG SHANZU ROAD, OFF KYUNA LANE/CLOSE, OFF LOWER 'KABETE ROAD, KYUNA ESTATE
INVITATION OF PUBLIC COMMENTS
PURSUANT to regulation 21 of the Environmental (Impact
Assessment and Audit) Regulations, the National Environment
Management Authority (NEMA) has received an Environmental
Impact Assessment Study Report for the implementaroposed development of residential houses.
The proposed project consists of construction of three (3) modern villa houses on 0.1822 hectare plot.
•
The project is to he located along Shanzu Road, off Lower Kabete
Estate, Kyuna Estate plot L. R. No. 7158/384.
The. project anticipates the following impacts and mitigation measures:
Possible Impacts Mitigation Measures.
I. Drainage system — Ensure that storm water drainages- are separated from the public sewerage system.
Possible Inipacts
Mitigation Measures
—Check points should be accessible for unblocking.
—Install drainage systems properly to ensure the drainage are free from any blocking materials.
—Ensure effective wastage management.
2. Surface run-off
— Ensure that no wasted water is directed to surface run-off drainage.
—Installation of oil/grease interceptors at appropriate
, .
points.
—Ensure that no surface drains are connected into the public sewers.
3.Solid waste management
— Provide solid waste collection facilities at strategic locations and provide solid waste segregation containers.
A selection yard should be slabbed and 'compartmented to provide space for every category of solid waste.
Contact the municipal council for site of disposal of the construction material remains. -
4.Public and Occupational — Provide workers with health and safety appropriate protective clothing.
—Provide workers with a well stocked first-aid kit.
—Sensitive residents on fire risks.
-- Install and maintain fire-fighting equipment and machinery. •
5. Air Dust and Noise pollution — Provide barriers such as walls and trees around site boundaries to provide some buffer against noise propagation.
—Use of ear protectors for the workers.
—Construction activities to b restricted to the day time.
—Sprinkle water to reduce dust.
6. Oil spills
— Provide handling, storage and disposal of oil and oil wastes.
—Provide oil interceptors along drains leading to car washes
7.Increase in traffic
— Provide bill boards at the site/entrance to notify motorists in the area.
8.Destruction of the physical — Provide- soil erosion control
, environment, soil erosion structures on the steep sides.
-Control earth works, compact loose soils and ensure management of excavation activities.
—Landscape properly the disturbed areas after completion of works.
—Use indigenous trees to replant areas where vegetation is unnecessarily removed.
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, National Environment Management
Authority, Kapiti Road, off Mombasa Road, P.O. Box 67839-
00200, Nairobi.
61: 362 THE KENYA GAZEIIE 22nd February, 2008
(b)Permanent Secretary, Ministry of Environment and Natural
Resources, N.H.I.F. Building, P.O. Box 30521, Nairobi.
(c)Provincial Director of Environment, Nairobi Province.
(d)District Environment Officer, Nairobi West District.
The National Environment Management Authority, invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, National Environment Management Authority, to assist the Authority in the approval process of the project.
B. M. LANGWEN, for Director-General, National Environment Management Authority.
ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED JIPE ROMBO ELECTRIC FENCE AT THE
TSAVO WEST NATIONAL PARK
INVITATION OF PUBLIC COMMENTS
PURSUANT to regulation 21 of the Environmental (Impact
Assessment and Audit) Regulations, the National Environment
Management Authority (NEMA) has received an Environmental
Impact Assessment Study Report for the implementation of proposed
Jipe Rombo Electric Fence at the Tsavo West National Park.
The proposed project consist of resolving persistent human wildlife conflicts in Taveta Division, minimizing damage to crops and property by wild animals and to act as a deterrent to would be poachers.
he project will be located at Tsavo West National Park.
he project anticipates the following impacts and mitigation measures:
Possible Impacts Mitigation Measures
1.Loss of vegetation cover and — Restrict clearing only. to fence soil erosion alignment section.
Allow regeneration of graminoid layer along the fence line after installation to cover the soil.
2.Vegetation degradation due to — Undertake scientific the restricted animal management of the mega movement herbivorous.
Translocation if the carrying capacity is exceeded.
Carry out monitoring of wildlife habitat.
3.Malfunctioning of the fence Hire and train fence technicians to ensure that the fence is checked for effective always.
Install clearly labelled warning signs written "Hatari" to the electric wires to caution.
4.Lack of funds to maintain the — Provide a fence maintenance fence kitty (Endowment Fund) that will receive allocations annually.
Form community fence committees to ensure community participation in the project.
5.Fence vandalism interfering Sensitize the adjacent with its effectiveness communities to the park to appreciate and participate in fence maintenance.
— Encourage community policing.
Possible Impacts Mitigation Measures
Train game scouts to assist in patrolling.
6.Block elephant access to Provide alternative watering water outside the park points by desilting the existing earth dams in the park.
Construction of additional watering points to supplement the existing.
Translocation of elephants.
The full report of the proposed project is available for inspection during working hours at:
(a)Director-General, National Environment Management
Authority,'Kapiti Road, off Mombasa Road, P.O. Box 67839-
00200, Nairobi.
(b)Permanent Secretary, Ministry of Environment and Natural
Resources, N.H.I.F. Building, P.O. Box 30521, Nairobi.
(c)Provincial Director of Environment, Coast Province.
(d)District Environment Officer, Taita Taveta District.
(e)www.nema.go.ke. , The National Environment Management Authority, invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, National Environment Management Authority, to assist the Authority in the approval process of the project.
B. M. LANGWEN, for Director-General, *AZE'TTE NOTICE No. 1265
National Environment Management Authority.
THE ENVIRONMENTAL MANAGEMENT AND CO-
ORDINATION ACT
(No. 8 41999)
THE NATIONAL ENVIRONMENT MANAGEMENT
AUTHORITY
ENVIRONMENTAL IMPACT ASSESSMENT STUDY
REPORT FOR THE PROPOSED WATER SUPPLY AND
SANITATION PROGRAM NZOIA CLUSTER PHASE 11
(KAKAMEGA, BUSIA, NAMBALE)
INVITATION OF PUBLIC COMMENTS
I
Pursuant to Regulation 21 of Environmental (Impact Assessment and Audit) Regulations, the National Environment Management
Authority (NEMA) has received an Environmental Impact Assessment
Study Report for the implementation of proposed Water Supply and
Sanitation Program Nzoia Cluster Phase II (Kakainega, Busia, Nambale).
The proposed project consists of construction of new intake works on River Yala, new water treatment plant, rehabilitation of water treatment facilities, laying of raw and treated water pipelines, new water storage reservoirs, water kiosks, rehabilitation and drilling of new boreholes, expansion of sewer line networks, rehabilitation and expansion of sewerage stabilization ponds and on-site sanitation works.
The intake of the project is transversing the districts of Kakamega, Busia and Nambale towns.
The project anticipates the following impacts and mitigation measures:-
Possible Impacts
Mitigation Measures
1. Habitat losg.
•
Replanting of indigenous plants could be implemented after the project.
2. Air quality.
•
A water bowser would be used to minimize dust on all murrain (dirt) roads.
k
Dated the 30th January, 2008.
1. N. GITHUI,
Clerk to the Council.
Extracted Entities (1)
previous_gazette_ref
1262
Details
- Act / Legislation
- THE LOCAL GOVERNMENT ACT
- Reference
- Cap. 265
- Section
- section 148
- Signed By
- 1. N. GITHUI
- Title
- Clerk to the Council
- Ministry
- Ministry of Environment And Natural
- Date Signed
- 30th January 2008
- Page
- 39
- Extraction Method
- regex
Source Gazette
Vol. cx No. 16 (SUPPLEMENT)
Published 22nd February 2008