Back
REGULATION
100% confidence
via regex
GAZETTE NOTICE NO. 465
GAZETTE NOTICE NO. 465
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
REGULATION
PURSUANT to regulation 21 of the Environmental (Impact
Assessment and Audit) Regulations, the National Environment
Management Authority (NEMA) has received an Environmental
Impact Assessment Study Report for the implementation of proposed
Lamu Queen Hotel, Manda Island.
The proposed project consists of the development of a tourist venture within the Island of Manda.
1. Disturbance of the mangrove • Proponent proposes to maintain ecosystem the road that separates the plpt from the mangrove forest to act as a buffer zone.
•Proponent proposes to maintain a mangrove nursery on the project site that will be used in replanting.
•Proponent proposes to engage measures to ensure no wastes are dumped in the forest.
2. Liquid wastes
• Proponent will install swall treatment works on the site.
•Proponent to reuse some of the treated water in watering gardens at the hotel and in the washrooms.
•The sludge that remains after treatment will be re-used as manure for the gardens.
4. Accumulation of sand/soil • Proponent will spread all the during excavation sand/soil on the beach shore near
30 metres high water tank.
•Proponent will use part of the sand/soil to fill up some of the trenches created during the excavation for foundation.
•Proponent proposes to plant mangrove trees on the spread out sand to aid in reduction of beach erosion.
5. Access route to the beach
• Proponent will reserve both sides of the project plot a path of 4 metres width.
•Proponent will place at both ends of reserved path a sign board to prepare people on the existence of an access route to the beach.
6.High brine water levels during • Pour such water into the ocean the desalination process since the chemical composition of the brine water is similar to that of the ocean water.
7.Dust
• Provide workers with protective gear, e.g. masks.
•Use sea water to sprinkle the site during site clearance.
8. Fire • Put or place fire extinguishers at strategic positions within the hotel premises to combat fires in case of any outbreaks.
•Ensure that an alarm/siren system is installed within the hotel premises to warn residents of any impending danger or disaster.
•Have a well equipped first aid kit within- the hotel to aid in fast handling of casualties.
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, National Environmental Management
Authority, Kapiti Road, off Moritbasa Road, P.O. -Box 67839-
00200, Nairobi.
25th January, 2008 THE KENYA GAZETTE 133
(b)Permanent Secretary, Ministry of Environment and Natural
Resources, N.H.I.F. Community, P.O.•Box 30521, Nairobi.
(c)District Environment Officer, Lamu District
The National-- Environmental Management Authority, invites members of the public to submit oral or written comments within thirty ..(30) days from the date of publication of this notice to the
Director-General, National Environmental Management Authority, to assist the authority in the approval process of the project.
Dated the 15th November, 2007.
B. M. LANGWEN, for Director-General;
-National Environment Management Authority.
Dated the 15th November, 2008.
B. M. LANGWEN,
for Director-General, -National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
465
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Signed By
- B. M. LANGWEN
- Title
- for Director-General, -National Environment Management Authority
- Ministry
- Ministry of Environment And Natural
- Date Signed
- 15th November 2008
- Page
- 32
- Extraction Method
- regex
Source Gazette
Vol. CX No. 7 (SUPPLEMENT)
Published 25th January 2008