Back
ESTABLISHMENT 100% confidence via regex

GAZETTE NOTICE NO. 9151

GAZETTE NOTICE NO. 9151

THE WATER ACT

(No. 43 of 2016)

ESTABLISHMENT


under the powers granted by section 72 (1) (b) and (2) of the Water Act, 2016, has approved the regular tariff adjustment for the area served by Bomet Water and Sanitation Company Limited (BOMWASCO). Bomet Water and Sanitation Company Limited (BOMWASCO) applied to the Water Services Regulatory Board (WASREB) for review of water services tariffs, for the period 2026/2027 to 2029/2030 as per section 72 (1) b of the Water Act 2016. Public consultation on the BOMWASCO application was carried out in accordance with the requirements of section 139 of the Water Act 2016. Having considered the application, the written and oral submissions by all stakeholders and the current data, WASREB has determined that a downward tariff review is justified for BOMWASCO to improve service delivery, operate sustainably and protect BOMWASCO consumer interests by meeting the conditions attached to the tariff. 19th June, 2026 THE KENYA GAZETTE WASREB hereby gives a one-month notice from the date of this communication to all existing and potential customers of BOMWASCO that the structure of approved tariffs for water services for the four financial years 2026/2027, 2027/2028, 2028/2029 and 2029/2030 shall be as follows: 9.0 Approved Tariff Structure 1.1 Water Tariff Structure for the period 2026/2027 to 2029/2030 Consumer Categories Consumption Block Approved Tariff (M3) (Kshs/M3) Domestic/Residential 1-6 110 7-20. 122 21-50 140 51-100 155 100-300 180 >300 220 Multi- Dwelling Units Flat Rate 122 Commercial/Industrial 1-50 140 51-100 155 101-300 180 >300 220 Government/Institutions 1-50 140 51-100 155 100-300 180 >300 220 Public Schools, Colleges, and Universities 1-600 125 601-1200 180 >1200m3 220 Unique Consumer Categories Water Kiosks 70 Bowsing Point 105 Bulk Water Supply 70 Customers with non-functional meters shall be billed based on the average of the last three months’ bills. 1.2 Sewerage Tariff Structure for the period 2026/2027 to 2029/2030 a) Consumers with a Water Connection i. Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories. ii. Disconnected water accounts shall be charged based on the average of the last three months’ sewer charges before the disconnection. b) Consumers without a Water Connection Sewerage consumers without a water connection shall be charged as follows: i. Single dwelling Domestic unit: Ksh. 300 Per Month ii. All other categories: as per the metered source of water, including boreholes, at the rates specified in (1.2 (a)) above. 1.3 Indexation The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services Regulatory Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2027. 1.4 Miscellaneous Charges These shall be as follows: Item/ Service Charge (Ksh.) Water Deposit Category of consumer Domestic 2,500 Retail shops less than 10m3 3,000 Retail shops more than 10m3 3,500 Bar, and restaurants less than 15 m3 4,000 Bar, restaurants more than 15 m3 6,000 Hotel class “A” and “B” less than 150 m3 12,000 Hotel class “A” and “B” more than 150 m3 15,000 Hotel class “C” and ‘D’ less than 150 m3 18,000 Hotel class “C” and ‘D’ more than 150 m3 20,000 Hospitals more than 150 m3 20,000 Health centres less than 150 m3 12,000 Schools and other institutions more than 200 m3 20,000 Schools less than 200 m3 10,000 Minor construction sites of more than 200 m3 15,000 Major construction sites more than 300 m3 50,000 Light industries less than 200 m3 30,000 3010 3010 Item/ Service Charge (Ksh.) Medium industrial between 200 m3 and 300 m3 50,000 Heavy industries of more than 300 m3 100,000 Water Kiosks 5,000 Customers with only sewer connection are to be charged a deposit equivalent to a water connection Other Charges Service New water connection fee – Connection size: ½ inch to 1 inch 4,000 New water connection fee – Connection size: 1.5 inches to 3 inches 7,500 New water connection fee – Connection size above 3inches 15,000 Water Reconnection fee – at meter point 1,000 Water Reconnection fee – at mains 5,000 and double deposit Tanker – 8000, 16,000 litres 2,500, 5,000, respectively, per tanker within the WSP area for all consumers Sale of water Per M3 at bowsing point (own tanker) 122 Replacement of stolen or damaged meters 100% of the market cost of the meter Meter testing on request 500 Special meter reading under customer’s request 500 Sewer Connection- Residential/ Domestic 5,000 Sewer Connection- Commercial, Government, Schools, Universities and Colleges 7,500 Sewer Connection- Industrial 15,000 Private sewer unblocking 2,500 Leak detection services 1,000 Sewer Reconnection fee 15,000 Printing of customer’s statement under own request 200 For cutting off the supply at the request of the consumer 200 For turning on the supply otherwise than in respect of a first connection 200 Exhauster Services (Company Exhauster) 4,000 for informal settlements, All Other Customers are to be charged based on distance as below; Distances Exhauster Graduated Rates Within Central Business District (CBD) 6,000 15-30 Kms Radius 10,000 31-60 Kms Radius 14,000 61-80 Kms Radius 20,000 81-90 Kms Radius 30,000 Over 90 Kms Radius 35,000 Private Exhausters (Dumping into the company’s sewer system) 15,000 per Truck per month Penalties Illegal water connection, -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of illegality Illegal water connection, (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality Overcharging (fraud) at water kiosk 15,000 Illegal sewer connection- Commercial, Industry, Construction 100,000 Illegal sewer connection- Domestic, Government, Schools, Universities & Colleges 30,000 Self-reconnection after cut-off for non-payment 5,000 and billing to be backdated from the date of cut-off Surcharge for tampering with meters (this to include meter removal, reversing of meter etc) 15,000 Surcharge for direct suction of water from the supply line using a pump 10,000 10.0 Cost Structure 10.1 Cost Summary Below is the summary of the projected Annual cost structure that makes up the total costs to be incurred by BOMWASCO during the tariff period: Expenditure Item 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029 2029/2030 Operations 118,920,214 170,359,408 220,677,783 235,476,148 244,412,258 259,247,862 Maintenance 5,346,845 5,453,782 5,562,858 5,674,115 5,787,597 5,903,349 Regulatory Levy 1,629,045 5,201,602 10,856,055 11,912,174 12,759,669 13,559,577 Total O&M Costs 125,896,104 181,014,792 237,096,696 253,062,437 262,959,524 278,710,788 Investment Costs - - - 12,082,500 26,158,000 28,358,650 Total Costs 125,896,104 181,014,792 237,096,696 265,144,937 289,117,524 307,069,438 Total Billing (KShs) 74,041,926 79,794,529 219,917,485 241,317,493 261,558,818 278,015,243 Collection Efficiency (%) 62% 77% 82% 87% 92% 95% Projected Revenue 45,933,313 61,288,252 180,332,338 209,946,219 240,634,113 264,114,480 O&M Cost Coverage 36% 34% 76% 83% 92% 95% Total Cost Coverage Without Subsidy 36% 34% 76% 79% 83% 86% Proposed Subsidy 63,000,000 63,000,000 62,726,650 62,157,148 56,577,586 52,148,884 Projected Revenue With Subsidy 108,933,313 124,288,252 243,058,988 272,103,367 297,211,699 316,263,364 19th June, 2026 THE KENYA GAZETTE Expenditure Item 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029 2029/2030 Total Cost Coverage With Subsidy 87% 69% 103% 103% 103% 103% 11.0 Conditions attached to the tariff approval. The conditions attached to this approval which shall form part of the license conditions of BOMWASCO are: 11.1 Service Delivery Conditions attached to the Tariff Target 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029 2029/2030 Water Coverage (%) 8% 8% 11% 14% 17% 20% Water quality standards (%) 90% 100% 100% Compliance with Standards Personnel Expenditure as % of O&M 52% 47% 33% 32% 31% 30% Non-Revenue Water 62% 50% 40% 38% 36% 34% Hours of Supply (Hrs.) 14 14 15 15 16 16 Staff per 1000 connections 24 22 21 21 20 20 Metering ratio (%) 71% 71% 100% 100% 100% 100% Collection Efficiency (%) 62% 77% 82% 87% 92% 95% Resale at Kiosk KSh. 10 per 20L Jerry Can KSh. 5 per 20L Jerry Can 11.2 Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff. 11.3 Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by WASREB 11.4 Reporting: The utility shall submit to WASREB a quarterly performance report in the format provided 11.5 Regulatory Levy: The utility is to pay a monthly regulatory levy based on 4% of turnover, which is inclusive of billing for other services and interest income earned. 11.6 Catchment Protection: The utility shall undertake measures to conserve/ protect the catchment areas of their source of water as part of Corporate Social Responsibility. 11.7 Subsidy: The county government of Bomet shall support the WSP by meeting operational and Investment costs annually as per the table below during the proposed tariff period Expenditure Item 2025/2026 2026/2027 2027/2028 2028/2029 2029/2030 Operational and Investment Subsidy 63,000,000 62,946,011 61,931,939 55,962,187 51,195,875 11.8 Investments: The utility shall undertake the investments in Appendix 1. 12.0 Penalty notice 12.1 Take note that failure of an Accounting Officer to administer this tariff and the conditions attached to it is an offence subject to section 196 (2) of the Public Finance Management Act 2012, 117 (1) (aa) of the County Governments Act 2012, Sections 147 and 158 of the Water Act 2016, and Regulations 46 (1), 101 and 105 of the Water Services Regulations 2025. 12.2 Failure to comply with the tariff and conditions attached to it amounts to a breach of licence conditions and shall attract sanctions pursuant to section 92 of the Water Act 2016, including: ix. Payment of a penalty x. Suspension or cancellation of the licence xi. Placement of the utility under Special Regulatory Regime xii. Prosecution. APPENDIX 1: PROPOSED INVESTMENTS BOMWASCO INVESTMENTS SCHEDULE – INTERNALLY GENERATED FUNDS S/No . Investments Description Qty. Unit Cost(Kshs.) 2027/202 8 2028/2029 2029/2030 1 Metering 1.1 Water Meter- New Connections AMR smart-enabled meters (DN 15 meters) 1227 5,500 6,748,500 4,000,000 270 5,500 1,485,000 AMR smart-enabled meters (DN 20 meters) 600 7,500 4,500,000 - 3,000,000 1.2 Water Meter- meter replacements Replacement of meters that have surpassed their economic life (6yrs) - 200 DN 15 meters each year 2890 5,500 - 10,400,000 1755 5,500 9,652,500 2 Non-Revenue Water Management 2.1 Bulk/ Production Master Meters and Works DN75 Single Jet AMR- Enabled Meter 9 80,000 720,000 - 480,000 6 80,000 480,000 Construction and installation of a series bulk 6 50,000 300,000 - 400,000 3012 3012 S/No . Investments Description Qty. Unit Cost(Kshs.) 2027/202 8 2028/2029 2029/2030 meters and production meter chambers ( 2 Chambers every year) 4 50,000 200,000 DN150 Single Jet AMR- Enabled Meter 3 150,000 150,000 - 300,000 2 150,000 300,000 2.2 DMA Master Meters and Works For the installation of meters within DMAs that will be created for the determination of the actual NRW position, and for the establishment of DMAs for effective NRW management to support revenue growth DN 200 Electromagnetic Water Meter 1 162,400 DN150 Single Jet AMR- Enabled Meter 3 150,000 150,000 - 300,000 2 150,000 300,000 DN100 Single Jet AMR- Enabled Meter 3 100,000 100,000 - 200,000 2 100,000 200,000 12 DMAs will be created for the four years, with 3 DMAs being created each year DMA creation and Isolation physical works 18 500,000 3,000,000 - 6,000,000 12 500,000 6,000,000 Pipe Wrenches 14" 10 3,500 35,000 - 21,000 8 3,500 28,000 Pipe Wrenches 12" 15 1,500 22,500 - 17,650 6 1,500 9,000 2.3 Cold Water Meter Testing and Calibration Portable Water Meter Test Kit 6 400,000 400,000 800,000 800,000 Water Meter Anti- Tampering Plastic Seals 4000 500 500,000 1,000,000 2.5 Pressure data loggers, Pressure Gauges & Pressure Reducing Valves Pressure data loggers with 2 output channels (max pressure 10 bars) 8 200,000 200,000 400,000 400,000 Pressure data loggers with 2 output channels (max pressure 20 bars) 6 300,000 300,000 600,000 600,000 Install Water Pressure Gauges 76 5,000 150,000 300,000 300,000 Tank ball valves 4" 6 35,000 70,000 140,000 140,000 TOTAL 12,082,500 26,158,000 28,358,650 Dated the 29th May, 2026. RICHARD CHERUIYOT, MR/7804409 Ag. C.E.O., Water Services Regulatory Board.

Dated the 29th May, 2026.

RICHARD CHERUIYOT,

Ag. C.E.O., Water Services Regulatory Board.

Extracted Entities (1)

previous_gazette_ref

9151

Details

Act / Legislation
THE WATER ACT
Reference
No. 43 of 2016
Section
section 72 (1) (b)
Signed By
RICHARD CHERUIYOT
Title
Ag. C.E.O., Water Services Regulatory Board
Date Signed
29th May 2026
Page
42
Extraction Method
regex