GAZETTE NOTICE NO. 7331
GAZETTE NOTICE NO. 7331
THE WATER ACT
(Cap. 372)
APPROVAL
under the powers granted by section 72 (1) (b) and (2) of the Water Act, 2016, has approved the regular tariff adjustment for the area served by Kericho Water and Sanitation Company Limited (KEWASCO).
Kericho Water and Sanitation Company Limited (KEWASCO) applied to the Water Services Regulatory Board (WASREB) for review of water services tariffs, for the period 2025/2026 to 2029/2030 as per section 72 (1) b of the Water Act 2016.
Public consultation on the KEWASCO application was carried out in accordance with the requirements of section 139 of the Water Act 2016.
Having considered the application, the written and oral submissions by all stakeholders and the current data, WASREB has determined that an upward tariff review is justified for KEWASCO to improve service delivery, operate sustainably and protect consumer interests by meeting the conditions attached to the tariff.
2494 2494
WASREB hereby gives a one-month notice from the date of this communication to all existing and potential customers of KEWASCO that the structure of approved tariffs for water services for the five financial years 2025/2026, 2026/2027, 2027/2028, 2028/2029 and 2029/2030 shall be as follows:
1.0 APPROVED TARIFF STRUCTURE
1.1 Water Tariff Structure for the period 2025/2026 to 2029/2030
Consumer Categories Consumption Block (m3) Approved Tariff (KSh./m3)
Domestic/Residential 1-6 85
7-20. 115
21-50 125
51-100 135
101-300 145
>300 150
Multi- Dwelling Units Flat Rate 115
Commercial/Industrial 1-50 125
51-100 135
101-300 145
>300 150
Government/Institutions 1-50 125
51-100 135
101-300 145
>300 150
Public Schools, Colleges, and Universities 1-600 100
601-1200 115
>1200m3 120
Unique Consumer Categories Water kiosks 50
Bowsing Points 115
Customers with non-functional meters shall be billed based on the average of the last three months’ bills.
1.2 Sewerage Tariff Structure for the period 2025/2026 to 2029/2030
(a) Consumers with a Water Connection
(i) Sewerage will be charged at 75% of the water volumes, billed at the tariff for water specified (in 1.1) above for all customer categories.
(ii) Disconnected water accounts shall be charged based on the average of the last three months’ sewer charges before the disconnection.
(b) Consumers without a Water Connection
Sewerage consumers without a water connection shall be charged as follows:
(i) Single dwelling Domestic unit: KSh. 300 Per Month
(ii) All other categories: as per the metered source of water, including boreholes, at the rates specified in (1.2 (a)) above.
1.3 Indexation
The utility’s approved tariffs for water and sewerage shall be eligible for annual indexation, as per the regulations of the Water Services Regulatory
Board (WASREB). The inflation adjustment shall come into effect every July of the tariff period commencing July 2027.
1.4 Miscellaneous Charges
These shall be as follopws:
Item/Service Charge (KSh.)
Water Deposit
Category of consumer
Domestic 2,500
Retail shops less than 10m3 3,000
Retail shops with more than 10m3 3,500
Bar and restaurants with less than 15 m3 4000
Bar and restaurants more than 15 m3 6,000
Hotel class “A” and “B” with less than 150 m3 12,000
Hotel class “A” and “B” with more than 150 m3 15,000
Hotel class “C” and ‘D’, with less than 150 m3 18,000
Hotel class “C” and ‘D’ more than 150 m3 20,000
Hospitals and Health centres with more than 150 m3 20,000
Hospitals and Health centres with less than 150 m3 12,000
Schools and other institutions have more than 200 m3 20,000
Schools and other institutions with less than 200 m3 10,000
Minor construction sites of more than 200 m3 15,000
Major construction sites with more than 300 m3 50,000
Light industries with less than 200 m3 30,000
Medium industries between 200 m3 and 300 m3 50,000
Heavy industries of more than 300 m3 100,000
Water Kiosks 5,000
Customers with only sewer connection are to be charged a deposit equivalent to a water connection
Other Charges
Service
15th May, 2026 THE KENYA GAZETTE
Item/Service Charge (KSh.)
New water connection fee – Connection size: ½ inch to 1 inch 2,500
New water connection fee – Connection size: 1.5 inches to 3 inches 7,500
New water connection fee – Connection size above 3inches 15,000
Water Reconnection fee – at meter point 1,000
Water Reconnection fee – at mains 5,000 and double deposit
Tanker – 8000 and 16,000 litres 2,500 and 5,000, respectively, per tanker within the WSP area for all consumers
Sale of water per M3 at Browsing Point (own tanker) 115
Replacement of stolen or damaged meters 100% of the market cost of the meter
Meter testing on request 500
Special meter reading at the customer’s request 500
Sewer Connection- Residential/ Domestic 5,000
Sewer Connection- Commercial, Government, Schools, Universities, and
Colleges
7,500
Sewer Connection- Industrial 15,000
Private sewer unblocking 2,500
Leak detection services 1,000
Sewer Reconnection fee 15,000
Printing of the customer’s statement on their own request 200
For cutting off the supply at the request of the consumer 200
For turning on the supply otherwise than in respect of a first connection 200
Exhauster Services (Company Exhauster) 4,000 for informal settlements. All Other Customers are to be charged based on distance as below
Private Exhausters (Dumping into the company’s sewer system) 15,000 per Truck per month
Penalties
Illegal water connection -Commercial, Industry, Construction (Fraud) 100,000 plus estimated consumption during the period of illegality
Illegal water connection (Fraud) – Domestic 30,000 plus estimated consumption during the period of the illegality
Overcharging (fraud) at the water kiosk 15,000
Illegal sewer connection- Commercial, Industry, Construction 100,000
Illegal sewer connection- Domestic, Government, Schools, Universities and
Colleges
30,000
Self-reconnection after cut-off for non-payment 5,000, and billing to be backdated from the date of the cut-off
Surcharge for tampering with meters (this includes meter removal, reversing of meter, etc.)
5,000
Surcharge for direct suction of water from the supply line using a pump 10,000
2.0 COST STRUCTURE
2.1 Cot Summary
Below is the summary of the projected Annual cost structure that makes up the total costs to be incurred by KEWASCO during the tariff period:
Expenditure Item 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029 2029/2030
Operations 226,186,687.00 261,002,120.07 302,970,474.95 322,304,386.50 339,334,647.55 357,206,149.54
Maintenance - 13,352,950.00 15,741,787.50 18,411,265.63 22,657,332.03 30,753,141.60
Regulatory Levy 9,764,506.00 11,531,667.30 16,658,150.40 18,038,266.53 19,934,701.34 22,052,575.27
Total O&M Costs 235,951,193.00 285,886,737.37 335,370,412.85 358,753,918.65 381,926,680.91 410,011,866.41
Investment Costs - 2,000,000.00 22,445,713.00 48,732,256.79 55,327,508.39 60,329,417.78
Debt Repayment - - - - 29,225,360.18 29,225,360.18
Total Costs 235,951,193.00 287,886,737.37 357,816,125.85 407,486,175.45 466,479,549.48 499,566,644.37
Total Billing (KShs) 258,868,651 288,291,682 416,453,760 450,956,663 498,367,533 551,314,382
Collection Efficiency (%) 90% 90% 90% 95% 95% 95%
Projected Revenue 232,981,786 259,462,514 374,808,384 428,408,830 473,449,157 523,748,663
O&M Cost Coverage 99% 91% 112% 119% 124% 128%
Total Cost Coverage 99% 90% 105% 105% 101% 105%
3.0 CONDITIONS ATTACHED TO THE TARIFF APPROVAL
The conditions attached to this approval which shall form part of the license conditions of KEWASCO are:
3.1 Service Delivery Conditions attached to the Tariff
Service Delivery Conditions
Target 2024/2025 2025/2026 2026/2027 2027/2028 2028/2029 2029/2030
Water Coverage (%) 38% 57% 58% 59% 60% 61%
Water quality standards (%) 100%
Personnel Expenditure as % of O&M 60% 46% 42% 41% 40% 39%
Non-Revenue Water 61% 59% 58% 56% 52% 48%
Hours of Supply (Hrs.) 18 19 20 21 22 23
Staff per 1000 connections 7 10 9 9 9 8
Metering ratio (%) 100% 100% 100% 100% 100% 100%
Collection Efficiency (%) 80% 90% 95% 95% 95% 95%
O&M Cost Coverage 104% 91% 112% 119% 124% 128%
2496 2496
Total Cost Coverage 99% 90% 105% 105% 101% 105%
Resale at kiosk KSh. 5.00 per 20l jerry can
3.2 Annual budgets: The WSP shall adhere to the budgetary levels set in the tariff.
3.3 Surpluses: The surpluses realised during the tariff period shall be used to implement priority service delivery capital projects approved by
WASREB
3.4 Reporting: The utility shall submit to WASREB a quarterly performance report in the format provided
3.5 Regulatory Levy: The utility is to pay a monthly regulatory levy based on 4% of turnover, which is inclusive of billing for other services and interest income earned.
3.6 Investments: The utility shall undertake the investments in Appendix 1.
4.0 PENALTY NOTICE
4.1 Take note that failure of an Accounting Officer to administer this tariff and the conditions attached to it is an offence subject to section
196 (2) of the Public Finance Management Act 2012, 117 (1) (aa) of the County Governments Act 2012, Sections 147 and 158 of the Water Act
2016, and Regulations 46 (1), 101 and 105 of the Water Services Regulations 2025.
4.2 Failure to comply with the tariff and conditions attached to it amounts to a breach of licence conditions and shall attract sanctions pursuant to section 92 of the Water Act 2016, including:
(i) Payment of a penalty
(ii) Suspension or cancellation of the licence
(iii)Placement of the utility under Special Regulatory Regime
(iv) Prosecution.
APPENDIX 1: PROPOSED INVESTMENTS
KEWASCO INVESTMENTS SCHEDULE – INTERNALLY GENERATED FUNDS
Targetted
Investment
Project
Area Guide Size
Sample
Descri- ptions
Unit Unit Cost Quanti ty
Project Cost
(KSh.)
Fy 25-
26 Fy 26-27 Fy 27-28 Fy 28-
Fy 29-
30 Sum
A. New
Connection s and
Meter
Replaceme nts
Kericho
West
Kipsitet 6" (Bulk) - No 419440 2 838,880 - 419,440 419,440 - - 838,880
Meter 3/4"
(Plastic, R160)
- No 8000 60 480,000 - - 480,000 - - 480,000
Meter 1/2"
(Plastic, R160)
- No 4000 1,200 4,800,000 400,000 800,000 1,600,00
2,000,0
4,800,000
Kipkelio n
Fort
Ternan
6" (Bulk) - No 419440 2 838,880 - 419,440 419,440 - - 838,880
Meter 4" (Bulk) - No 240924 5 1,204,620 - - 1,204,620 - - 1,204,620
Meter 3" (Bulk) - No 181468 10 1,814,680 - - 907,340 907,340 - 1,814,680
Meter 2" (Bulk) - No 146188 20 2,923,760 - - 730,940 2,192,82
- 2,923,760
Meter 1" (Bulk) - No 55224 25 1,380,600 - - 1,380,600 - - 1,380,600
Meter 3/4"
(Plastic, R160)
- No 8000 80 640,000 - - 640,000 - - 640,000
Meter 1/2"
(Plastic, R160)
- No 4000 2,000 8,000,000 - 400,000 1,200,000 2,000,00
4,400,0
8,000,000
Kericho
East
Timbilil 12" (Bulk) - No 1074836 1 1,074,836 - 1,074,83
- - - 1,074,836
Meter 4" (Bulk) - No 240924 10 2,409,240 - 1,204,620 1,204,62
- 2,409,240
Meter 3" (Bulk) - No 181468 20 3,629,360 - 907,340 907,340 1,814,6
3,629,360
Meter 2" (Bulk) - No 146188 35 5,116,580 - 1,461,880 2,923,76
730,940 5,116,580
Meter 1" (Bulk) - No 55224 35 1,932,840 - 552,240 1,104,48
276,120 1,932,840
Meter 3/4"
(Plastic,R1
60)
- No 8000 40 320,000 - 320,000 - - - 320,000
Meter 1/2"
(Plastic,R1
60)
- No 4000 1,500 6,000,000 400,000 800,000 2,000,00
2,800,0
6,000,000
CBD Meter 4" (Bulk) - No 240924 2 481,848 - 481,848 - - 481,848
Meter 3" (Bulk) - No 181468 5 907,340 - 907,340 - - 907,340
Meter 2" (Bulk) - No 146188 12 1,754,256 0 730940 1023316 - 1,754,256
Meter 1" (Bulk) - No 55224 17 938,808 - 938,808 - 938,808
Meter 3/4"
(Plastic,R1
60)
- No 8000 120 960,000 - 960,000 - - 960,000
15th May, 2026 THE KENYA GAZETTE
Targetted
Investment
Project
Area Guide Size
Sample
Descri- ptions
Unit Unit Cost Quanti ty
Project Cost
(KSh.)
Fy 25-
26 Fy 26-27 Fy 27-28 Fy 28-
Fy 29-
30 Sum
Meter 1/2"
(Plastic,R1
60)
- No 4000 2,000 8,000,000 800000 1600000 2,000,00
3,600,0
8,000,000
Litein Area
Bulk
Meter
4" (Bulk) - No 240924 1 240,924 - 240,924 - - - 240,924
Meter 3" (Bulk) - No 181468 2 362,936 - 362,936 - - 362,936
Meter 2" (Bulk) - No 146188 8 1,169,504 0 730940 438564 - 1,169,504
Meter 1" (Bulk) - No 55224 10 552,240 - 552,240 - - 552,240
Meter 3/4"
(Plastic,R1
60)
- No 8000 50 400,000 - 400,000 - - - 400,000
Meter 1/2"
(Plastic,R1
60)
- No 4000 1,000 4,000,000 0 400,000 1,200,000 2,400,00
4,000,000
Sub -
Total
4,468,932 8,272 63,172,132 - 5,274,64
20,634,704 21,641,0
15,621, 63,172,132
B. NRW
Reduction
Activities
- Procurement and
Installation of 4"
Pressure Reducing
Valves (PRVs)
-
- No 7 180,00
1,260,000 360,000 900,000 - - 1,260,000
- Procurement and
Installation of Sluice
Valves (6") PN16
-
- No 10 75,000 750,000 150,000 600,000 - - 750000
- Procurement and
Installation of Sluice
Valves (4") PN16
-
- No 20 42,000 840,000 - 420,000 420,000 - - 840000
- Procurement and
Installation of Sluice
Valves (3") PN16
-
- No 30 24,000 720,000 - 240,000 480,000 - - 720000
- Procurement and
Installation of Sluice
Valves (2") PN16
-
- No 40 15,000 600,000 - 300,000 300,000 - - 600000
- Procurement and
Installation of Gate
Valves (1") PN16
-
- No 75 3,500 262,500 - 262,500 - - - 262500
- Procurement and
Installation of
Single-Orifice Air
Valves (4") PN16
-
- No 5 35,000 175,000 - 175,000 - - - 175000
- Procurement and
Installation of
Single-Orifice Air
Valves (3") PN16
-
- No 10 28,000 280,000 - 280,000 - - - 280000
- Procurement and
Installation of
Single-Orifice Air
Valves (2") PN16
-
- No 15 15,000 225,000 - 225,000 - - - 225000
- Procurement and
Installation of
Single-Orifice Air
Valves (1") PN16
-
- No 20 10,000 200,000 - 200,000 - - - 200000
- Purchase and installations of 20
No. (4" & 3") Ball valves
-
- No 12 70,000 840,000 420,000 420,000 - - 840000
- Test and service production meters
-
- LS 1 600,00
600,000 - 600,000 - - - 600000
- Investigate and regularize illegal connections
-
- LS 1 960,00
960,000 - 960,000 - - - 960000
- Rehabilitation of 7.6 Minor LS 1 6,060,6,060,096 - 909,014 1,212,019 1,515,022,424,06060096
2498 2498
Targetted
Investment
Project
Area Guide Size
Sample
Descri- ptions
Unit Unit Cost Quanti ty
Project Cost
(KSh.)
Fy 25-
26 Fy 26-27 Fy 27-28 Fy 28-
Fy 29-
30 Sum
Km in CBD
-
Investme nts_BoQ
\Pipeline
Rehabilit ation
Works_
Tariff
Review
2025\CB
D_Reha bilitation s_Tariff
Review
2025.xls x
096 4 38
- Rehabilitation of 7.8
Km in Kericho East
-
Minor
Investme nts_BoQ
\Pipeline
Rehabilit ation
Works_
Tariff
Review
2025\Ke richo
East_Re habilitati ons_Tari ff
Review
2025.xls x
LS 1 7,190, 7,190,316 - 1,078,54
1,438,063 1,797,57
2,876,1
7190316
- Rehabilitation of
17.22 Km in Kericho
West
-
Minor
Investme nts_BoQ
\Pipeline
Rehabilit ation
Works_
Tariff
Review
2025\Ke richo
West_Re habilitati ons_Tari ff
Review
2025.xls x
LS 1 11,257
,218
11,257,218 - 1,688,58
2,251,444 2,814,30
4,502,8
11257218
- Rehabilitation of 4.3
Km in Kericho West
-
Minor
Investme nts_BoQ
\Pipeline
Rehabilit ation
Works_
Tariff
Review
2025\Ki pkelion_
Rehabilit ations_T ariff
Review
2025.xls x
LS 1 5,980, 5,980,590 - 897,089 1,196,118 1,495,14
2,392,2
5980590
- Rehabilitation of 6.2
Km in Litein
-
Minor
Investme nts_BoQ
\Pipeline
Rehabilit ation
LS 1 7,285, 7,285,600 - 1,092,84
1,457,120 1,821,40
2,914,2
7285600
15th May, 2026 THE KENYA GAZETTE
Targetted
Investment
Project
Area Guide Size
Sample
Descri- ptions
Unit Unit Cost Quanti ty
Project Cost
(KSh.)
Fy 25-
26 Fy 26-27 Fy 27-28 Fy 28-
Fy 29-
30 Sum
Works_
Tariff
Review
2025\Lit ein_Reh abilitatio ns_Tarif f Review
2025.xls x
Sub -
Total
NRW
Reductio n
Activitie s
- 45,486,320 - 10,258,5
10,674,764 9,443,45
15,109, 45,486,320
C. Sewer
Improveme nt
Rehabilitation of the sewer system to improve service.- CBD
- LS 1 2,425, 2,425,000 1,212,50
1,212,500 2,425,000
- Procure ment of
Sewer line
Rodding
Machine
No 1 200,00
200,000 200,000 200,000
Sub
Total
- 2 2,625, 2,625,000 - 1,412,50
1,212,500 - - 2,625,000
D. Last mile
Connectivi ty
Kericho
West
Lastmile
Pipeline
Extensio n
- Minor
Investme nts_BoQ
\Kericho
West_Ki pchimch im-
Telanet
Tank_M ain water project.x lsx
LS 1 10,876
,678
10,876,678 2,175,336 3,806,83
4,894,5
10,876,678
Kericho
East
- Minor
Investme nts_BoQ
\Kericho
East_Bel gut
Lastmile connecti vity water project.x lsx
LS 1 9,729, 9,729,460 1,945,892 3,405,31
4,378,2
9,729,460
Kipkelio n
- Minor
Investme nts_BoQ
\Kipkeli on_Lond iani_Las tmile connecti vity water project.x lsx
LS 1 11,211
,220
11,211,220 2,242,244 3,923,92
5,045,0
11,211,220
CBD -- Minor
Investme nts_BoQ
\CBD_K ericho
Town
Lastmile
Connecti vity
Water
LS 1 12,650
,758
12,650,758 2,530,152 4,427,76
5,692,8
12,650,758
2500 2500
Targetted
Investment
Project
Area Guide Size
Sample
Descri- ptions
Unit Unit Cost Quanti ty
Project Cost
(KSh.)
Fy 25-
26 Fy 26-27 Fy 27-28 Fy 28-
Fy 29-
30 Sum
Project.x lsx
Litein - Minor
Investme nts_BoQ
\Litein_
Lastmile connecti vity water project.x lsx
LS 1 9,083, 9,083,327 1,816,665 3,179,16
4,087,4
9,083,327
Sub
Total
- 5 53,551
,444
53,551,444 - - 10,710,289 18,743,0
24,098, 53,551,444
E. Revenue
Improveme nts
Procurement and
Integration of ERP
System
- LS 1 24000
24,000,000
Sub
Total
- 1 24,000
,000
24,000,000 2,000, 5,500,00
5,500,000 5,500,00
5,500,0
24,000,000
- TOTAL 188,834,896 2,000, 22,445,7
48,732,257 55,327,5
60,329, 188,834,89
Dated the 7th May, 2026.
RICHARD CHERUIYOT, MR/7795512 Ag. CEO, Water Services Regulatory Board.
Dated the 7th May, 2026.
RICHARD CHERUIYOT,
Ag. CEO, Water Services Regulatory Board.
Extracted Entities (1)
previous_gazette_ref
7331
Details
- Act / Legislation
- THE WATER ACT
- Reference
- Cap. 372
- Section
- section 72 (1) (b)
- Signed By
- RICHARD CHERUIYOT
- Title
- Ag. CEO, Water Services Regulatory Board
- Date Signed
- 7th May 2026
- Page
- 49
- Extraction Method
- regex
Source Gazette
Vol. CXXVIII No. 83 (SUPPLEMENT)
Published 15th May 2026