Back
ACT 100% confidence via regex

GAZETTE NOTICE NO. 7326

GAZETTE NOTICE NO. 7326

THE ENERGY ACT

(Cap. 314)

ACT


NOTICE is given pursuant to section 11 (b) of the Energy Act No. 1 of 2019 that the Energy and Petroleum Regulatory Authority has reviewed and approved the applicable Kenya Pipeline Company’s (KPC) multi-year pipeline transport tariff for the tariff control period 2025/2026–2027/2028 as follows: Financial Year Applicable tariff (KSh/ m3/km) 2025-2026 5.44 2026-2027 5.53 2027-2028 5.83 The breakdown for local and export tariff is as follows: 2024/25 Approved Tariff Applicable Depot Tariffs 2025/26 2026/27 2027/28 Pipeline Tariff KSh./m3/km 5.44 5.44 5.53 5.83 Moi Airport (USD/m3) 25.29 21.99 22.17 23.45 JKIA (USD/m3) 25.29 21.99 22.17 23.45 Nairobi Terminal (KSh./m3) 2,791.85 2,851.80 2,874.13 3,040.60 Nakuru Terminal Local KSh./m3 3,467.62 3,529.08 3,562.06 3,751.17 Export USD/m3 31.42 27.22 27.47 28.93 Eldoret Terminal Local KSh./m3 4,175.37 4,238.42 4,282.55 4,495.37 Export USD/m3 37.83 32.69 33.03 34.67 Kisumu Terminal Local KSh./m3 4,171.37 4,234.41 4,278.48 4,491.16 Export USD/m3 37.79 32.66 33.00 34.64 Konza (Kshs./m3) Local KSh./m3 1,527.48 1,530.89 1,554.96 1,606.13 Export USD/m3 11.81 11.99 12.39 The effective date of the above set of tariffs is 15th April 2026 and subsequent adjustments for the next tariff control period will be on 15th July of every year. JOSEPH OKETCH, MR/8126752 Ag. Director-General.

Dated the 15th April, 2026.

JOSEPH OKETCH,

Ag. Director-General.

Extracted Entities (1)

previous_gazette_ref

7326

Details

Act / Legislation
THE ENERGY ACT
Reference
Cap. 314
Section
section 11 (b)
Signed By
JOSEPH OKETCH
Title
Ag. Director-General
Date Signed
15th April 2026
Page
43
Extraction Method
regex