GAZETTE NOTICE NO. 6004

PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2023, Notice is hereby given that all prices for Electrical Energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) Levy of Plus 1.54 Cents per kWh for all meter readings taken in April, 2026 Hydropower Plant Units Purchased in March, 2026 (kWh) Gitaru 72,734,250 Kamburu 36,097,960 Kiambere 90,128,200 Kindaruma 18,130,750 Masinga 10,711,560 Tana 14,898,950 Wanjii 5,435,150 Sagana 950,305 Turkwel 55,100,000 Gogo 368,938 Sondu Miriu 18,858,248 Sangoro 11,280,110 Information used to calculate the WRMA Levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5.00 Kenya cents per KWh Total units purchased from hydropower plants with capacity equal to or above 1MW = 334,694,420kWh Total Units Generated and Purchased (G) Excluding exports in March, 2026 = 1,302,550,365kWh JOSEPH OKETCH, (DR. ENG.) MR/8081505 Ag. Director-General.

Extracted Entities (1)

previous_gazette_ref

6004

Details

Signed By
JOSEPH OKETCH
Title
(DR. ENG.)
Page
32
Extraction Method
regex