GAZETTE NOTICE NO. 5754
GAZETTE NOTICE NO. 5754
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
ACT
PURSUANT to section 59 of the Environmental Management and
Co-ordination Act, the National Environment Management Authority
(NEMA) has received an Environmental Impact Assessment Study
Report for the above proposed project.
17th April, 2026 THE KENYA GAZETTE
The proponent, MIC Garden Group Limited, proposes to develop a
21 storey (2 No. basements, ground floor, mezzanine floor plus 21 No.
floors) multi dwelling residential apartment comprising of (190 No.
one bedroom units, 76 No. two bedroom units, 3No. two bedroom duplexes, 5No. three bedroom duplexes, 5 No. four bedroom duplexes)
169No. parking spaces, associated amenities and facilities on plot No.
Nairobi/block 23/134 along Vihiga Close, off Vihiga Road in
Kileleshwa area, in Dagoretti North Sub-County, Nairobi City County.
The following are the anticipated impacts and proposed mitigation measures:
Impacts Proposed mitigation measures
Air, noise pollution and vibration
• Water sprinkling on driveways.
• Switch off engines not in use.
• Construction work to be confined to between 8a.m. to 6p.m.
• Provide and enforce use of PPE e.g ear muffs, aprons, glove
• Proper servicing of machinery and equipment (oiling and greasing)
• Monitor noise levels as per NEMA guidelines. .
Health and safety (risks of accidents and
Injuries to workers)
• Education and awareness to all workers.
• Procure services of a health and safety officer.
• Provide First Aid Kits on site.
• Proper signage and warning to public
• Provide clean water and food to the workers.
• The contractor to abide by all conditions including health safety and workforce welfare.
• Personnel to stick to standard operation procedures.
• Personnel to wear complete protective gear.
• Provision of fire-fighting equipment
• Comply with Kenyan safety policy and safe working procedures, laws and regulations.
Solid waste generation
• Ensure waste materials are disposed off to County and NEMA approved sites.
• Use of the 3rs – Reduce, Re-use, Re- cycle.
• Solid waste to be collected in designated areas for appropriate disposal.
• Waste segregation at source
• Engage a NEMA and county licensed waste handler.
Excessive water use • Harvesting of rain water
• Training and awareness to workers on importance of water conservation and best practices.
• Encourage use of alternatives for dust control such as non-toxic biodegradable dust suppressants or polymers that require less water - Efficient water use in concrete mixing.
Solid waste generation
• Provide waste disposal bins at strategic points well protected from adverse weather conditions and animals.
• Regular inspection and maintenance of
Impacts Proposed mitigation measures the waste disposal systems.
• Engage a NEMA licensed waste handler to transport and dispose waste.
• Use of the 3rs – Reduce, Re-use, Re- cycle.
• Encourage waste segregation at source.
Liquid waste generation
• Availability of NCWSC trunk sewer line in the area.
• Proper connection to the existing sewer line.
• -Regular inspection and maintenance of the waste disposal systems.
• Use of separate storm water drainage channel.
Increased loading on
Infrastructure
• Provision of adequate parking within the facility.
• Have paved driveways.
• Encourage rainwater harvesting and water storage tanks.
• Provide adequate storm water management system.
Social conflict
• Encourage good relation with the neighbours through provision of employment opportunities to the community members (skilled and semi skilled).
• Formation of residents association/Register with the existing association.
• Improved livelihood.
• Strict adherence to provided ESMP.
Insecurity • secure the premise with a perimeter wall.
• Installation of CCTV cameras at strategic points.
• Have entry points manned 24 hours.
• Construction of gate house.
Building safety/ Land and Building use
• Assess the condition of buildings to ascertain usefulness Ascertain the
Planning development policy.
Accidents/Injuries • Securing the Site by fencing off.
Un-disconnected services e.g. power, Water, telephone, sewer
• Ensure disconnection of all services.
• Remove all surface and underground cables and wiring.
Solid waste generation
(Demolition waste)
• Ensure waste materials are disposed of on County and NEMA approved sites.
• Ensure re-use of materials that can be re-used.
• -Use of the 3rs -Reduce, Re-use, Re- cycle.
Noise and vibration • Ensure use of serviced equipment.
• Switch off engines not in use.
• Demolition work to be confined to between 8 a.m. to 5 p.m.
• Ensure use of earmuffs by workers.
The full report of the proposed project is available for inspection during working hours at:
2056 2056
(a) Principal Secretary, Ministry of Environment, Climate
Change and Foresty, NHIF Building, 12th Floor, Ragati
Road, Upper Hill, Upper Hill, P.O. Box 30126–00200, Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi.
(c) County Director of Environment, Nairobi City County.
A copy of the EIA report can be downloaded at www.nema.go.ke
The National Environmental Management Authority, invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA to assist the Authority in the decision making process for this project. Kindly quote ref. No.
NEMA/ENVIS/SR/00493
Comments can also be e-mailed to dgnema@nema.go.ke
MAMO B. MAMO, MR/8118083 Director-General.
Dated the 17th April, 2026.
MAMO B. MAMO,
Director-General.
Extracted Entities (1)
previous_gazette_ref
5754
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Section
- section 59
- Signed By
- MAMO B. MAMO
- Title
- Director-General
- Ministry
- Ministry of Environment, Climate
- Date Signed
- 17th April 2026
- Page
- 42
- Extraction Method
- regex
Source Gazette
Vol. CXXVIII No. 68 (SUPPLEMENT)
Published 17th April 2026