Back
RESTORATION 100% confidence via regex

GAZETTE NOTICE NO. 5752

GAZETTE NOTICE NO. 5752

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

RESTORATION


PURSUANT to section 59 of the Environmental Management and Coordination Act Cap. 387, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Victory Farms Limited, proposes to establish a commercial, sustainable and socially responsible tilapia cage system with an estimated production of 30,000 metric Tons per annum in new 390 acres concession block within Lake Victoria’s Nyatike West (Kadem) and Nyatike South (Karungu) Sub-Counties in Migori County. The following are the anticipated impacts and proposed mitigation measures: Impacts Mitigation Measures Disturbance of lake bed sediments • Carefully dismantle structures to minimize sediment disturbance. • Remove anchors and moorings using controlled methods. • Schedule removal during calm weather conditions. • Supervise activities to prevent debris loss into the water. Accidental spillage of fuel and oils • Drain all fuels and lubricants prior to removal. • Use spill prevention measures and keep spill kits on-site. • Use designated access routes to avoid shoreline degradation. Solid waste accumulation • Segregate reusable, recyclable, and waste materials. • Sell or reuse scrap materials where possible. • Dispose non-recyclable waste through licensed contractors. • Maintain clean and safe temporary storage areas. Microplastic pollution • Retrieve all nets completely from the water. • Inspect site for residual fragments. • Recycle or dispose through licensed waste handlers. 17th April, 2026 THE KENYA GAZETTE Impacts Mitigation Measures Soil and water contamination • Identify and inventory all hazardous substances. • Store temporarily in labelled, secure containers. • Dispose at licensed hazardous waste disposal facilities. • Characterize waste according to standard waste management procedures. • Engage licensed waste disposal contractor. • Maintain waste transfer records. Traffic congestion • Use roadworthy, licensed transport vehicles. • Secure loads properly to prevent spillage. • Plan transport during non-peak hours where possible. Aesthetic degradation • Remove all project materials and debris from lake and shoreline. • Restore disturbed shoreline areas. • Rehabilitate any compacted ground. • Conduct post-decommissioning water quality assessment to confirm restoration. Exposure to hazardous materials • Provide appropriate PPE and flotation devices. • Conduct safety briefings and supervision. • Ensure trained personnel handle dismantling operations. The full report of the proposed project is available for inspection during working hours at: (a) Principal Secretary, Ministry of Environment, Climate Change and Foresty, NHIF Building, 12th Floor, Ragati Road, Upper Hill, Upper Hill, P.O. Box 30126–00200, Nairobi. (b) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (c) County Director of Environment, Migori County. A copy of the EIA report can be downloaded at www.nema.go.ke The National Environmental Management Authority, invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director- General, NEMA to assist the Authority in the decision making process for this project. Kindly quote Ref. No. NEMA/ENVIS/SR/00283 Comments can also be e-mailed to dgnema@nema.go.ke MAMO B. MAMO, MR/8097711 Director-General.

Dated the 17th April, 2026.

MAMO B. MAMO,

Director-General.

Extracted Entities (1)

previous_gazette_ref

5752

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Section
section 59
Signed By
MAMO B. MAMO
Title
Director-General
Date Signed
17th April 2026
Page
40
Extraction Method
regex