Back
ACT 100% confidence via regex

GAZETTE NOTICE NO. 4184

GAZETTE NOTICE NO. 4184

THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT

(No. 8 of 1999)

ACT


PURSUANT to section 59 of the Environmental Management and Coordination Act, 1999, the National Environment Management Authority (NEMA) has received an Environmental Impact Assessment Study Report for the above proposed project. The proponent, Tatu City Limited, proposes to construct 20 and 30 storey residential towers (A and B) with ground floors for commercial spaces, business activities and residential apartments consisting of a total of 374 units (85 studios, 94 one-bedroom units, 125 two-bedroom units, 49 three-bedroom units, 4 four-bedroom units, 12 duplexes and 1 s. penthouse), 247 parking spaces, concierge services, residents garden, infinity pool, fitness club, business lounge, shops, restaurants, bar, art gallery, banks, kids play area, hotels and offices and other associated facilities and amenities located on L.R. No. 28867/1, Plot No. 1AA-B11 at Tatu central, CBD of the Tatu City, Ruiru in Kiambu County. The following are the anticipated impacts and proposed mitigation measures: Possible Impacts Mitigation measures Vegetation disturbance • Ensure proper demarcation and delineation of the project area to be affected by construction work. • Clearing areas earmarked for the proposed development only. • Land scapping: planting of trees, shrubs and flowers on the remaining spaces. • Designate acess routes and parking within the site. Soil Erosion • Proper management of excavation acitivites. • Excavated materials should be removed promptly from the site to avoid erosion. • Installation of drainages to control storm water flow onsite. • Controlling earthworks. Increased Storm Water, Runoff. • Storm water management plan that minimize impervious area infiltration. • Ensuring construction vehicles are restricted to existing graded roads to avoid soil compaction within the site. • Ensure any compacted areas are ripped to reduce run-off. • Levelling the proposed project site to reduce run-off velocity. High Demand of Raw Material • Source building materials from local suppliers who use environmentally friendly processes in their operations. • Ensure damage or loss of materials at the construction site is kept minimal through proper storage. Dust Emission • Ensure strict enforcement of on-site speed limit regulations. • Cover stockpiles of sand, soil and similar materials. The full report of the proposed project is available for inspection during working hours at: (a) Principal Secretary, Ministry of Environment, Climate Change and Foresty, NHIF Building, 12th Floor, Ragati Road, Upper Hill, Upper Hill, P.O. Box 30126–00200, Nairobi. (b) Director General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi. (c) County Director of Environment, Kiambu County. A copy of the EIA report can be downloaded at www.nema.go.ke The National Environmental Management Authority, invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the Director General, NEMA to assist the Authority in the decision making process for this project. Comments can also be e-mailed to dgnema@nema.go.ke MAMO B. MAMO, Director-General, MR/7808961 National Environment Management Authority.

Dated the 19th March, 2026.

MAMO B. MAMO,

Director-General, National Environment Management Authority.

Extracted Entities (1)

previous_gazette_ref

4184

Details

Act / Legislation
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
Reference
No. 8 of 1999
Section
section 59
Signed By
MAMO B. MAMO
Title
Director-General, National Environment Management Authority
Date Signed
19th March 2026