Back
OTHER 89% confidence via regex

GAZETTE NOTICE NO. 3567

PURSUANT to Clause 5 of Part III of the Schedule of Tariffs, 2023, Notice is given that all prices for Electrical Energy specified in Part II -(A) of the said Schedule will be liable to a Water Resource Management Authority (WRMA) Levy of Plus 1.22 cents per kWh for all meter readings taken in March, 2026. Hydropower Plant Units Purchased in February 2026 (KWh) Gitaru 56,695,520 Kamburu 29,583,690 Kiambere 65,594,470 Kindaruma 13,648,820 Masinga 13,515,620 Tana 3,714,390 Wanjii 2,342,790 Sagana 452,672 Turkwel 41,859,000 Gogo 439,197 Sondu Miriu 12,411,243 Sangoro 4,457,375 Information used to calculate the WRMA Levy: Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW = 5.00 Kenya cents per KWh Total units purchased from hydropower plants with capacity equal to or above 1MW = 244,714,787kWh Total Units Generated and Purchased (G) Excluding exports in February 2026 = 1,199,384,361kWh DANIEL KIPTOO BARGORIA, MR/8081507 Director-General. 1072 1072

Extracted Entities (1)

previous_gazette_ref

3567

Details

Signed By
DANIEL KIPTOO BARGORIA
Title
Director-General
Date Signed
13th March 2026
Page
35
Extraction Method
regex