GAZETTE NOTICE NO. 3342
GAZETTE NOTICE NO. 3342
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(Cap. 387)
ACT
PURSUANT to Section 59 of the Environmental Management and
Coordination Act, the National Environment Management Authority
(NEMA) has received an Environmental Impact Assessment Study
Report for the above proposed project.
The proponent, Beacon of Hope Foundation, proposes to develop a
3B level hospital comprising of ground plus two floors including reception, 2No. triage rooms, 4No. consultation rooms, pharmacy, dental clinic, physiotherapy room, delivery ward, radiology, casualty room, labor ward, maternity ward, minor theatre, lift shaft, staircase and ramp, associated facilities and amenities on plot L.R. No.
Ngong/Ngong/3347, Ongata Rongai, along Gitaka Road off Magadi
Road Kajiado County.
The following are the anticipated impacts and proposed mitigation measures:
Impacts Proposed Mitigation Measures
Soil erosion • Control earthworks.
• Install drainage structures to control flow of storm water.
• Ensure and management of excavation activities.
Loss of vegetation • Only area earmarked for development should be cleared.
• Plant trees, shrubs and flowers on remaining open spaces.
Changes in hydrology/ impended drainage/deep
• Proper Installation of drainage structures.
• Install cascades to break the impact of water flowing in the drains.
Impacts Proposed Mitigation Measures excavations • Ensure efficiency of drainage structures through proper design and maintenance.
• Provide gratings to the drainage channels.
• A geotechnical survey shall be conducted and the recommendations thereof followed.
There shall be no blasting during excavation.
• A methodology for excavation shall be generated as required by NCA.
Air pollution • Stockpiles of earth should be sprayed with water or covered during dry seasons.
• Provide dust masks for personnel in dusty areas.
• Sensitize construction workers on pollution control measures.
• Cover all trucks hauling soil, sand and other loose materials.
Noise pollution • Install suitable barriers to shield compressors and other small stationary equipment where necessary.
• Display signs to indicate construction activities.
• Maintain all equipment.
• The working hours should be in line with
NEMA licensing conditions.
• Adhere to provisions of Noise Prevention and Control Rules 2005, Legal Notice no.
24 regarding noise limits at the workplace as well as NEMA Noise Excessive
Vibration Pollution Control Regulations, 2000.
Public health, occupational health and safety
• Train staff/workers on occupational health and safety.
• Provide full protective gear & workmen’s compensation cover in addition to the right tools and operational instructions & manuals during construction.
• Design of sewerage system should be as provided in the plans and should be constructed to approved size and design, standard and of approved materials.
• Ensure use of standard construction materials and to the specifications. Avoid undesirable, substandard, hazardous or unauthorized materials during construction and maintenance.
• Sensitized staff on social/health issues such as drugs.
Road traffic disruption
• No overloading of trucks and good driving practices to be practiced.
• Suitable junction/access point to be provided.
• Use of appropriate and legible signage.
• Employment of formal flagmen/ women to ensure the public safety.
• Follow the recommendations of the traffic management plan.
Security and social impacts
• Provision of security guards, CCTV cameras, security lights and other security apparatus during the entire project cycle.
• Construction work timings shall only in line with the NEMA licensing conditions.
1020 1020
Impacts Proposed Mitigation Measures
Increased water usage
• Make use of roof catchments to provide water i.e. for general purpose.
• An alternative water source shall be provided. The proponent shall drill a borehole at the proposed site.
• Management of water usage. Avoid unnecessary wastage.
• Recycling of water at the construction phase where possible.
Increased generation of waste
• Adopt waste minimization at source.
• Monitoring the fate of disposed wastes to ensure they are legally land filled at a recognized controlled site.
• Adhering to waste management regulations of 2006
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi.
(b) County Director of Environment, Kajiado County.
A copy of the EIA report can be downloaded at www.nema.go.ke
The National Environmental Management Authority, invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA to assist the Authority in the decision making process for this project.
Comments can also be e-mailed to dgnema@nema.go.ke
MAMO B. MAMO, MR/8111040 Director-General.
Dated the 6th March, 2026.
MAMO B. MAMO,
Director-General.
Extracted Entities (1)
previous_gazette_ref
3342
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- Cap. 387
- Section
- section 59
- Signed By
- MAMO B. MAMO
- Title
- Director-General
- Date Signed
- 6th March 2026
- Page
- 75