GAZETTE NOTICE NO. 1668
GAZETTE NOTICE NO. 1668
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
ACT
PURSUANT to section 59 of the Environmental Management and
Co-ordination Act, Cap. 387, the National Environment Management
Authority (NEMA) has received an Environmental Impact Assessment
Study Report for the above proposed project.
6th February, 2026 THE KENYA GAZETTE
The proponent L&K Developers Limited, proposes to construct a residential complex comprising of ground plus 6No. floors. Ground floor will comprise 180No. car parking spaces and pool equipment, 1st to 6th floor will comprise of 96No. two bedroom units and 48No.
three bedroom units totaling to 144No. residential units, other associated facilities and amenities on plot no. Nairobi/Block 188/1695 and 1696 located along the Nothern by-pass in Marurui area of Nairobi
City County.
The following are the anticipated impacts and proposed mitigation measures:
Impacts Mitigation Measures
Air pollution Use of dust screens/nets around the construction site to contain and arrest dust.
Regular sprinkling of water on work areas to prevent fugitive dust violations.
Ensure no burning of waste such as paper and bottles on non-designated areas.
Regular covering and watering of all exposed stockpiles on site.
Regular and prompt maintenance of construction machinery and equipment to minimize generation of hazardous gases.
Noise pollution Construction works shall be carried out during the day.
The contractor shall use noise shields on noisy equipment such as corrugated iron sheet structures.
All noisy activities shall be scheduled concurrently during the construction to reduce the exposure period.
Operation of the noisy machinery shall be carried out when necessary and switched off when not in use.
Provide and enforce the use of Personal
Protective Equipment (PPE) by the workers at all times during the construction phase.
Monitor noise levels as per NEMA & NCC guidelines.
Oil pollution Proper storage, handling, and disposal of new/used oil and related oil wastes.
Routine maintenance of the construction equipment to avoid oil leaks.
Maintenance of the construction equipment to be carried out in the contractor's yard (off the site).
Solid waste Engage the services of the NEMA waste contractor to handle the waste.
Covering of the trucks when transporting building materials and waste.
Segregation of the waste at source before disposal to designated areas.
Use of an integrated solid waste management system through a hierarchy of options:
source reduction, recycling, composting and reuse.
Efficient use of the materials to reduce waste and recycling/reuse where feasible.
Monitor waste as per the waste management regulations.
Impacts Mitigation Measures
Liquid waste Channel all liquid waste to the NCWSC were line serving the area
Conduct routine inspection and monitoring of the internal drainage system to identify and repair any leakages and blockages.
Provision of adequate sanitary facilities to the workers during the construction.
Regular inspection and maintenance of the internal sewer system.
Energy demand Use of solar energy as an alternative source of energy.
Install and routine maintenance of energy efficient fixtures and fittings.
Turn off the machinery and equipment when not in use.
Put off all the lights immediately when not in use.
Increased traffic Ferry building materials during off-peak hours.
Employ traffic marshals to control traffic in and out of site.
Provide billboards at the site/entrance to notify motorists and the general public about the proposed project.
Enforce speed limits for construction vehicles especially along the adjacent roads.
Develop a traffic management plan to ensure that the site vehicles do not interfere with the regular traffic along the access roads.
Insecurity Engage services of security guards
Install and regular maintenance of the CCTV cameras
Place hotline numbers on strategic places
Sensitize residents on security precautions
Sensitize the residents on “Nyumba Kumi
Initiative”
Storm water drainage
Proper design and maintenance of the drainage structures.
Construct internal drains within the property for storm water management.
Proper installation of cascades to break the impact of water flowing in the drains.
Rainwater harvesting to reduce surface runoff.
The proponent will ensure drainage facilities are fitted with adequate functional oil water separators and silt traps.
464 464
Impacts Mitigation Measures
Health and safety of workers
Register the construction site as a workplace with DOSHS.
Provide PPE to the workers and ensure that they wear them at all times.
Provide first aid kit for the workers on the site.
All workers to be adequately insured against accidents.
All workers shall be sensitized before construction begins on how to control accidents related to construction.
Keep a record of the public emergency service telephone numbers including Police, Fire brigade, and Ambulance at strategic points.
Ensure that the workers are registered with
SHA / NSSF and remit appropriate fees.
Prepare a comprehensive contingency plan before construction begins on accident response.
The full report of the proposed project is available for inspection during working hours at:
(a) Director-General, NEMA, Popo Road, off Mombasa Road, P.O. Box 67839–00200, Nairobi.
(b) County Director of Environment, Nairobi City County.
A copy of the report can be downloaded at www.nema.go.ke
The National Environment Management Authority invites members of the public to submit oral or written comments within thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision making process regarding this project.
Comments can also be emailed to dgnema@nema.go.ke
MAMO B. MAMO, Director-General, MR/8091293 National Environment Management Authourity.
Dated the 6th February, 2026.
MAMO B. MAMO,
Director-General, National Environment Management Authourity.
Extracted Entities (1)
previous_gazette_ref
1668
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Section
- section 59
- Signed By
- MAMO B. MAMO
- Title
- Director-General, National Environment Management Authourity
- Date Signed
- 6th February 2026
- Page
- 52
- Extraction Method
- regex
Source Gazette
Vol. CXXVIII No. 22 (SUPPLEMENT)
Published 6th February 2026