GAZETTE NOTICE NO. 522
GAZETTE NOTICE NO. 522
THE ENVIRONMENTAL MANAGEMENT AND CO- ORDINATION ACT
(No. 8 of 1999)
ACT
PURSUANT to section 59 of the Environmental Management and
Co-ordination Act, 1999, the National Environment Management
Authority (NEMA) has received an Environmental Impact Assessment
Study Report for the above proposed project.
The proponent, Superior Ridge Limited, proposes to develop
residential apartments with a total of 719No. maisonettes of three and
four bedrooms to be constructed in 7 phases; (phase 1: 113No.units,
phase 2: 126No.units, phase 3: 52No. units, phase 4: 130No. units,
phase 5: 148No. units, phase 6: 81No. units on 0.5 acre plots, phase 7:
69No. self-build plots (maisonettes) with associated facilities
amenities on plot L.R.No. 12648/93 off Mombasa Road, Mavoko Sub-
County, Machakos County.
The following are the anticipated impacts and proposed mitigation
measures:
Impacts Mitigation Measures
Soil erosion • Control earthworks.
• Install drainage structures to control flow of
storm water.
• Ensure and management of excavation
activities.
Loss of vegetation • Only area earmarked for development should
be cleared.
• Plant trees, shrubs and flowers on remaining
open spaces.
Changes in
hydrology/
impended
drainage/deep
excavations
• proper installation of drainage structures
• Install cascades to break the impact of water
flowing in the drains
• Ensure efficiency of drainage structures
through proper design and maintenance.
• Provide gratings to the drainage channels.
• A geotechnical survey shall be conducted and
the recommendations thereof followed. There
shall be no blasting during excavation.
• A methodology for excavation shall be
generated as required by NCA.
Air pollution • Stockpiles of earth should be sprayed with
water or covered during dry seasons.
• Provide dust masks for personnel in dusty
areas.
• Sensitize construction workers on pollution
control measures.
• Cover all trucks hauling soil, sand and other
loose materials.
Noise pollution • Install suitable barriers to shield compressors
and other small stationary equipment where
necessary.
• Display signs to indicate construction
activities.
• Maintain all equipment.
• The working hours should be in line with
NEMA licensing conditions.
17th January, 2025 THE KENYA GAZETTE
Impacts Mitigation Measures
• Adhere to provisions of Noise Prevention and
Control Rules 2005, Legal Notice no. 24
regarding noise limits at the workplace as
well as EMCA (Noise Excessive Vibration
Pollution Control Regulations), 2009.
Public health,
occupational
health and safety
• Train staff/workers on occupational health
and safety.
• Provide full protective gear and workmen’s
compensation cover in addition to the right
tools and operational instructions and manuals
during construction.
• Design of sewerage system should be as
provided in the plans and should be
constructed to approved size and design,
standard and of approved materials.
• Ensure use of standard construction materials
and to the specifications. Avoid undesirable,
substandard, hazardous or unauthorized
materials during construction and
maintenance.
• Sensitized staff on social/health issues such as
drugs.
Road traffic
disruption
• No overloading of trucks and good driving
practices to be practiced.
• Suitable junction/access point to be provided.
• Use of appropriate and legible signage.
• Employment of formal flagmen/ women to
ensure the public safety.
• Follow the recommendations of the traffic
management plan.
Insecurity and
social impacts
• Provision of security guards, CCTV cameras,
security lights and other security apparatus
during the entire project cycle.
• Construction work timings shall only in line
with the NEMA licensing conditions.
Increased water
usage
• An alternative water source shall be provided.
The proponent shall drill a borehole at the
proposed site.
• Management of water usage. Avoid
unnecessary wastage.
• Recycling of water at the construction phase
where possible.
• Make use of roof catchments to provide water
i.e. for general purpose.
Increased
generation of
waste
• Adopt waste minimization at source.
• Monitoring the fate of disposed wastes to
ensure they are legally land filled at a
recognized controlled site.
• Adhering to waste management regulations of
2006.
The full report of the proposed project is available for inspection
during working hours at:
(a) Principal Secretary, Ministry of Environment, Climate
Change and Foresty, NHIF Building, 12th Floor, Ragati
Road, Upper Hill, Upper Hill, P.O. Box 30126–00200,
Nairobi.
(b) Director General, NEMA, Popo Road, off Mombasa Road,
P.O. Box 67839–00200, Nairobi.
(c) County Director of Environment, Machakos County.
A copy of the EIA report can be downloaded at www.nema.go.ke
The National Environmental Management Authority, invites
members of the public to submit oral or written comments within
thirty (30) days from the date of publication of this notice to the
Director General, NEMA to assist the Authority in the decision
making process for this project.
Comments can also be e-mailed to dgnema@nema.go.ke
MAMO B. MAMO,
Director-General,
MR/6520770 National Environment Management.
Dated the 17th January, 2025.
MAMO B. MAMO,
Director-General, National Environment Management.
Extracted Entities (1)
previous_gazette_ref
522
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO- ORDINATION ACT
- Reference
- No. 8 of 1999
- Section
- section 59
- Signed By
- MAMO B. MAMO
- Title
- Director-General, National Environment Management
- Date Signed
- 17th January 2025