GAZETTE NOTICE NO. 506
PURSUANT to Clause 5 of Part III of the Schedule of Tariffs 2023, notice is given that all prices for electrical energy specified in Part II -(A) of
the said Schedule will be liable to a Water Resource Management Authority (WRMA) levy of plus 1.45 cents per kWh for all meter readings taken in
January 2025.
Information used to calculate the WRMA levy.
Approved WRMA levy for energy purchased from hydropower plants of capacity equal to or above 1MW =5.00 Kenya cents per KWh
Hydropower Plant Units Purchased in December 2024 (kWh)
Gitaru 57,919,610
Kamburu 28,845,120
Kiambere 66,418,690
Kindaruma 13,411,810
Masinga 12,858,880
Tana 10,791,860
Wanjii 5,543,100
Sagana 967,443
Turkwel 49,081,000
Gogo 320,134
Sondu Miriu 20,599,408
Sangoro 12,607,782
Regen-Terem -
Chania -
Gura -
Metumi -
THE KENYA GAZETTE 17th January, 2025
Total units purchased from hydropower plants with capacity equal to or above 1MW = 279,364,836 kWh.
Total units generated and purchased (G) excluding exports in December 2024 = 1,171,676,722 kWh.
DANIEL KIPTOO BARGORIA,
MR/6520389 Director-General.
Extracted Entities (1)
previous_gazette_ref
506
Details
- Signed By
- DANIEL KIPTOO BARGORIA
- Title
- Director-General
- Date Signed
- 17th January 2025
- Page
- 27
- Extraction Method
- regex
Source Gazette
Vol. CXXVII No. 12
Published 2nd January 2025