Back
ACT
100% confidence
via regex
GAZETTE NOTICE NO. 1898
GAZETTE NOTICE NO. 1898
THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
(No. 8 of 1999)
ACT
PURSUANT to section 59 of the Environmental Management and
Co-ordination Act, 1999, the National Environment Management
Authority (NEMA) has received an Environmental Impact Assessment
Study Report for the above proposed project.
The proponent Wimax Homes Limited proposes to develop 4No.
residential block (A, B, C and D) of 2No. basements floors for parking
spaces, 3No. ground floors,1st to 9th floor comprising of 1,006No.
residential apartments units (943No. studios and 63No. one-bedroom
units), shops, a supermarket, gym, game room, social hall, swimming
pool, children playground, a landscape courtyard, a sewer treatment
plant, other associated amenities and facilities in Kabete Sub-county,
Kiambu County.
The following are the anticipated impacts and proposed mitigation
measures:
Impacts Proposed Mitigation Measures
Soil erosion • Control earthworks.
• Install drainage structures to control flow of
storm water.
• Ensure and management of excavation
activities.
Loss of vegetation • Only area earmarked for development
should be cleared.
• Plant trees, shrubs and flowers on remaining
open spaces.
Changes in
hydrology/
impended
drainage/deep
excavations
• Proper installation of drainage structures.
• Install cascades to break the impact of water
flowing in the drains.
• Ensure efficiency of drainage structures
through proper design and maintenance.
• Provide gratings to the drainage channels.
• A geotechnical survey shall be conducted
and the recommendations thereof followed.
There shall be no blasting during
excavation.
• A methodology for excavation has been
generated as required by NCA.
Air pollution • Stockpiles of earth should be sprayed with
water or covered during dry seasons.
• Provide dust masks for personnel in dusty
areas.
• Sensitize construction workers on pollution
control measures.
14th February, 2025 THE KENYA GAZETTE
Impacts Proposed Mitigation Measures
• Cover all trucks hauling soil, sand and other
loose materials.
Noise pollution • Install suitable barriers to shield
compressors and other small stationary
equipment where necessary.
• Display signs to indicate construction
activities.
• Maintain all equipment.
• The working hours should be in line with
NEMA licensing conditions.
• Adhere to provisions of Noise Prevention
and Control Rules 2005, Legal Notice no. 24
regarding noise limits at the workplace as
well as NEMA Noise Excessive Vibration
Pollution Control Regulations, 2000.
Public health,
occupational
health and safety
• Train staff/workers on occupational health
and safety.
• Provide full protective gear and workmen’s
compensation cover in addition to the right
tools and operational instructions and
manuals during construction.
• Design of sewerage system should be as
provided in the plans and should be
constructed to approved size and design,
standard and of approved materials.
• Ensure use of standard construction
materials and to the specifications. Avoid
undesirable, substandard, hazardous or
unauthorized materials during construction
and maintenance.
• Sensitized staff on social/health issues such
as drugs.
Road traffic
disruption
• No overloading of trucks and good driving
practices to be practiced.
• Suitable junction/access point to be
provided.
• Use of appropriate and legible signage.
• Employment of formal flagmen/ women to
ensure the public safety.
• Follow the recommendations of the traffic
management plan.
Insecurity and
social impacts
• Provision of security guards, CCTV
cameras, security lights and other security
apparatus during the entire project cycle.
• Construction work timings shall only in line
with the NEMA licensing conditions.
Increased water
usage
• An alternative water source shall be
provided. The proponent shall drill a
borehole at the proposed site.
• Management of water usage. Avoid
unnecessary wastage.
• Recycling of water at the construction phase
where possible.
• Make use of roof catchments to provide
water i.e. for general purpose.
Increased
generation of
waste
• Adopt waste minimization at source.
• Monitoring the fate of disposed wastes to
ensure they are legally land filled at a
recognized controlled site.
• Adhering to waste management regulations
of 2006.
The full report of the proposed project is available for inspection
during working hours at:
(a) Principal Secretary, Ministry of Environment and Forestry,
NHIF Building, Community, P.O. Box 30126–00100,
Nairobi.
(b) Director-General, NEMA, Popo Road, off Mombasa Road,
P.O. Box 67839–00200, Nairobi.
(c) County Director of Environment, Kiambu County.
The National Environment Management Authority invites
members of the public to submit oral or written comments within
thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision
making process regarding this plan.
MAMO B. MAMO,
Director-General,
MR/6508594 National Environment Management Authority.
Dated the 14th February, 2025.
MAMO B. MAMO,
Director-General, National Environment Management Authority.
Extracted Entities (1)
previous_gazette_ref
1898
Details
- Act / Legislation
- THE ENVIRONMENTAL MANAGEMENT AND CO-ORDINATION ACT
- Reference
- No. 8 of 1999
- Section
- section 59
- Signed By
- MAMO B. MAMO
- Title
- Director-General, National Environment Management Authority
- Date Signed
- 14th February 2025
- Page
- 46
- Extraction Method
- regex
Source Gazette
Vol. CXXVII No. 31
Published 14th January 2025